Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 29701 - 29710 of 38765

Finance Committee - Agenda - 3/17/2021 - P219

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
219
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ACKNOWLEDGEMENT OF NOTICE

Receipt of the above NOTICE TO PROCEED is hereby acknowledged

By

The day of , 20

By

Title

IFBO660-021121
2021 Paving Program NOTICE TO PROCEED
Residential Roadways Page 2 of 2

Page Image
Finance Committee - Agenda - 3/17/2021 - P219

Finance Committee - Agenda - 3/17/2021 - P220

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
220
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CHANGE ORDER

No.
PROJECT: 2021 Paving Program - Residential Roadways
OWNER'S CONTRACT NO.: __ 1FBQ660-021121
EXECUTED CONTRACT DATE:
DATE OF ISSUANCE: EFFECTIVE DATE: Upon City Approval
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.::

CONTRACTOR: Sunshine Paving Corporation

ENGINEER: DPW Engineering

The Contract is modified as follows upon execution of this Change Order:

Description:

Justification:

Attachments:

Change Order # 1 of 2
2021 Paving Program —
Residential Roadways

Page Image
Finance Committee - Agenda - 3/17/2021 - P220

Board Of Aldermen - Minutes - 10/10/2017 - P5

By dnadmin on Sun, 11/06/2022 - 21:54
Document Date
Tue, 10/10/2017 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 10/10/2017 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__101020…

Board of Aldermen — 10/09/17 Page 5

Attorney Bolton

| believe if one had the ability to write a pro statement and a con statement that satisfied 100 percent of
the people on both sides of the issue then one would be very safe from being accused of violating that
statute. However, human nature being what it is, my prediction would be that someone would not be
happy and would think that the pro statement was too pro or the con statement was too weak, or vice
versa. The possibility of having that statute waved around would be great. Whether a prosecutor would
bring a case, whether a jury would convict, that’s another question.

Alderwoman Melizzi-Golja

Through you to Attorney Bolton. | have had residents of the city, constituents of mine and constituents of
other ward aldermen, ask me where they can find information regarding the performing arts center study,
the minutes from the meetings, and the minutes from the special meeting that the board of aldermen had
regarding keno. At last week’s PEDC meeting, | suggested to Director Cummings that those at least be
posted on the home page because many people have difficulty navigating our website and don’t know
where to find this information. Would you view posting the links to that information, just public record
information that is out there, and making it more accessible to our residents and our voters,
electioneering?

Attorney Bolton

No.

PERIOD FOR PUBLIC COMMENT RELATIVE TO ITEMS EXPECTED TO BE ACTED UPON THIS EVENING
None

PETITIONS — None

NOMINATIONS, APPOINTMENTS AND ELECTIONS

Appointments by the Mayor

The following appointments by the Mayor were read into the record:

Business & Industrial Development Authority

Carl Andrade (Reappointment) Term to Expire: September 13, 2019

10 Clydesdale Circle

Nashua, NH 03062

Citizens Advisory Commission for Community Grants

Beth Quarm Todgham (New Appointment) Term to Expire: October 1, 2018
14 Alice Drive

Nashua NH 03063

Patricia Casey (New Appointment) Term to Expire: October 1, 2019

15 Pine Hill Avenue

Nashua, NH 03064

Jason Telerski (New Appointment) Term to Expire: October 1, 2019

5 Shakespeare Road
Nashua, NH 03062

Page Image
Board Of Aldermen - Minutes - 10/10/2017 - P5

Finance Committee - Agenda - 3/17/2021 - P221

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
221
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CHANGE ORDER
SUMMARY

CHANGE IN CONTRACT PRICE

Original Contract Price:

CHANGE IN CONTRACT TIMES

Original Contract Times:

Substantial Completion:

Ready for Final Payment:

Net Changes from previously approved Change Orders

Net Changes from previously approved Change Orders

Substantial Completion:

Ready for Final Payment:

Contract Price prior to this Change Order:

Contract Times prior to this Change Order:

Substantial Completion:

Ready for Final Payment:

Increase (Decrease) of this Change Order:

Increase (Decrease) of this Change Order:

Substantial Completion:

Ready for Final Payment:

Contract Price with all approved Change Orders:

Contract Times with all approved Change Orders:

Substantial Completion:

° Ready for Final Payment:
RECOMMENDED BY: ACCEPTED BY: ACCEPTED BY:
By: By: By:
Engineer (Authorized Signature) Owner (Authorized Signature) Contractor (Authorized Signature)
Title: Title: Title:
Date: Date: Date:

Change Order # 2 of 2
2021 Paving Program —
Residential Roadways

Page Image
Finance Committee - Agenda - 3/17/2021 - P221

Finance Committee - Agenda - 3/17/2021 - P222

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
222
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CLAIM TRACKING FORM

Date:

Claim Tracking Number:

Project: 2021 Paving Program - Residential Roadways
Owner’s Contract Number: IFB0660-021121

All claims received by the City or the Contractor from the public in regards to the above referenced
project shall be documented using this form. The Contractor or their Authorized Representative
shall respond to the claimant within 7 calendar days of receipt of the claim and within 7 calendar
days after each follow up correspondence.

Claimant Information
Name:
Address:
Phone Number:
Email Address:
Date of Claim:
Description of Claim:

Contractor Information
Name:
Address:
Phone Number:
Email Address:
Date Claim Was Received:
Date of Response:
Additional Correspondence:

Description of Resolution:

IFBO660-021121
2021 Paving Program CLAIM TRACKING FORM
Residential Roadways Page 1of1

Page Image
Finance Committee - Agenda - 3/17/2021 - P222

Finance Committee - Agenda - 3/17/2021 - P223

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
223
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CERTIFICATE OF SUBSTANTIAL COMPLETION

PROJECT: 2021 Paving Program — Residential Roadways

OWNER’S CONTRACT NO:

IFB0660-021121

DATE OF ISSUANCE:

OWNER:

OWNER’ s Purchase Order NO.:

CONTRACTOR:

City of Nashua, NH

Sunshine Paving

ENGINEER:

DPW Engineering

The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be substantially complete in
accordance with the Contract Documents on

(DATE OF SUBSTANTIAL COMPLETION)

A Tentative list of items to be completed or corrected is attached hereto. This list may not be all-
inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to
complete all the Work in accordance with the Contract Documents. The items in the tentative list shall

be completed or corrected by CONTRACTOR within

Substantial Completion.

days of the above date of

This certificate does not constitute an acceptance of Work not in accordance with the Contract
Documents nor is it a release of CONTRACTOR’ s obligation to complete the Work in accordance with

the Contract Documents.

EXECUTED BY ENGINEER: ACCEPTS THIS CERTIFICATE OF SUBSTANTIAL
COMPLETION:
By: By:
(Authorized signature) Owner Representative
Title: Title:
Date: Date:

ACCEPTS THIS CERTIFICATE OF SUBSTANTIAL
COMPLETION:

By:

Contractor (Authorized Signature)

Title:

Date:

IFBO660-021121
2021 Paving Program
Residential Roadways

CERTIFICATE OF SUBSTANTIAL COMPLETION

Page 1of1

Page Image
Finance Committee - Agenda - 3/17/2021 - P223

Finance Committee - Agenda - 3/17/2021 - P224

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
224
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CERTIFICATE OF FINAL COMPLETION

PROJECT: 2021 Paving Program - Residential Roadways
OWNER’S CONTRACT NO: IFB0660-021121

DATE OF ISSUANCE:

OWNER: City of Nashua, NH

OWNER’ s Purchase Order NO.:

CONTRACTOR: Sunshine Paving

ENGINEER: DPW Engineering

The Work to which this Certificate applies has been inspected by authorized representative of OWNER,
CONTRACTOR, and ENGINEER, and that Work is hereby declared to be finally complete in
accordance with the Contract Documents on

(DATE OF FINAL COMPLETION)

This certificate does not constitute an acceptance of Work not in accordance with the Contract
Documents nor is it a release of CONTRACTOR’ s obligation to complete the Work in accordance with
the Contract Documents. The Warranty for all Work completed expires one year from the date of this
Final Completion.

EXECUTED BY ENGINEER: ACCEPTS THIS CERTIFICATE OF FINAL ACCEPTS THIS CERTIFICATE OF FINAL
COMPLETION: COMPLETION:
By: By: By:
(Authorized signature) (Owner Representative) Contractor (Authorized Signature)
Title: Title: Title:
Date: Date: Date:

IFBO660-021121
2021 Paving Program CERTIFICATE OF FINAL COMPLETION
Residential Roadways Page 1of1

Page Image
Finance Committee - Agenda - 3/17/2021 - P224

Finance Committee - Agenda - 3/17/2021 - P225

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
225
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

CONTRACTOR'S FINAL RELEASE AND WAIVER OF LIEN

Project: IFB0660-021121 2021 Paving Program - Residential Roadways

Owner Contractor
Owner:_City of Nashua, New Hampshire Name:__ Sunshine Paving, Inc
Address:_229 Main Street Address: 29 Constitution Drive
Nashua, | New Hampshire 03060 Hudson, New Hampshire 03060
City State Zip City State Zip
Contract Date:

TO ALL WHOM IT MAY CONCERN:

For good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the
undersigned Contractor hereby waives, discharges, and releases any and all liens, claims, and rights to
liens against the above-mentioned project, and any and all other property owned by or the title to which
is in the name of the above-referenced Owner and against any and all funds of the Owner appropriated
and available for the construction of said project, and any and all warrants drawn upon or issued against
any such funds or monies, which the undersigned Contractor may have or may hereafter acquire or
process as a result of the furnishing of labor, materials, and/or equipment, and the performance of Work
by the Contractor on or in connection with said project, whether under and pursuant to the above-
mentioned contract between the Contractor and the Owner pertaining to said project or otherwise, and
which said liens, claims or rights of lien may arise and exist.

The undersigned further hereby acknowledges that the sum of

DOLLARS
($ )

has been paid to date and that

DOLLARS
($ )

constitutes the entire unpaid retainage balance due the undersigned in connection with said project
whether under said contract or otherwise and that the payment of said sum to the Contractor will
constitute payment in full and will fully satisfy any and all liens, claims, and demands which the
Contractor may have or assert against the Owner in connection with said contract or project.

Dated this day of 20

Contractor
Witness to Signature

By Title

Page Image
Finance Committee - Agenda - 3/17/2021 - P225

Finance Committee - Agenda - 3/17/2021 - P226

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
226
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

DIVISION 9

TECHNICAL SPECIFICATIONS

Page Image
Finance Committee - Agenda - 3/17/2021 - P226

Finance Committee - Agenda - 3/17/2021 - P227

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
227
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 203.112 - ROAD EXCAVATION AND REGRADE
A. SCOPE

This work includes repairing the subgrade including regrading and replacing removed subgrade
material with binder pavement at specific locations as directed by the Engineer.

This item will only be used at locations identified by the Engineer. In other areas where
subgrade is exposed during milling, any grading and compaction of the disturbed subgrade will
be incidental to subsequent paving.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor, equipment, and transportation necessary for
work in accordance with the latest approved City of Nashua Standard Specifications for Road
Construction, or the latest approved NHDOT Standard Specifications for Road and Bridge
Construction. The most stringent specification shall apply. Transportation and disposal of the
removed material shall be the responsibility of the Contractor.

This work includes removing 2” of exposed subbase, regrading as directed, and replacing with 2”
of %4” stone asphalt as per approved mix design. Prior to placing asphalt, subbase material shall
be compacted to required density. Locations of work shall be marked by the Engineer.

C. MEASUREMENT AND PAYMENT
This item will be measured per Square Yard of asphalt placed and compacted in the field.
Payment for this item shall be at the contract unit price per square yard and shall also include all

materials, labor, equipment, and all else needed to complete the work under this item. No
payment will be made for materials delivered but not placed.

Page 1 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P227

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2967
  • Page 2968
  • Page 2969
  • Page 2970
  • Current page 2971
  • Page 2972
  • Page 2973
  • Page 2974
  • Page 2975
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact