Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 29741 - 29750 of 38765

Finance Committee - Agenda - 3/17/2021 - P255

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
255
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 615.03 — TRAFFIC SIGN TYPE C

A.

SCOPE

This work shall consist of furnishing and erecting regulatory and warning traffic signs
and sign supports as shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for installing
traffic signs, including new posts, foundations, bases and all necessary mounting
hardware in accordance with relevant provisions of Section 615 of the NHDOT Standard
Specifications, latest edition.

MEASUREMENT AND PAYMENT

Traffic Sign Type C will be measured by the square foot. Payment for Traffic Sign Type
C will be at the contract unit price per each square foot, complete in place, and shall
include full compensation for removal of existing signs and posts where being replaced
by new signs, and for material, equipment and labor to complete this portion of the Bid
Schedule.

Page 29 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P255

Finance Committee - Agenda - 3/17/2021 - P256

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
256
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 615.033 - REMOVING TRAFFIC SIGN, TYPE C

A.

SCOPE

This work shall consist of removing existing regulatory, warning, and directional traffic
signs and sign supports as shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for removing
traffic signs, including posts, foundations, bases and all necessary mounting hardware in
accordance with relevant provisions of Section 615 of the NHDOT Standard
Specifications, latest edition.

MEASUREMENT AND PAYMENT

Removing Traffic Sign Type C will be measured by each sign and post removed.
Payment for Traffic Sign Type C will be at the contract unit price per each, complete
removal, and shall include full compensation for material, equipment and labor to
complete this portion of the Bid Schedule. No payment will be made for removal of
signs replaced under other items.

Page 30 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P256

Finance Committee - Agenda - 3/17/2021 - P257

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
257
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 615.06 — TRAFFIC SIGN TYPE CC

A.

SCOPE

This work shall consist of furnishing and erecting regulatory and warning traffic signs
shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for installing
traffic signs, and all necessary mounting hardware in accordance with relevant provisions
of Section 615 of the NHDOT Standard Specifications, latest edition.

MEASUREMENT AND PAYMENT

Traffic Sign Type CC will be measured by the square foot. Payment for Traffic Sign
Type CC will be at the contract unit price per each square foot, complete in place, and
shall include full compensation for removal of existing signs and posts where being
replaced by new signs, and for material, equipment and labor to complete this portion of
the Bid Schedule.

Page 31 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P257

Finance Committee - Agenda - 3/17/2021 - P258

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
258
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 616.7 - LOCAL TRAFFIC LOOPS 6’ X 50’ (2-4-2 TURN)

A. SCOPE

This work consists of furnishing all labor, materials and equipment necessary to install the
quadruple loop detectors as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

This item shall include all labor, materials and equipment necessary to install new quadruple
loop detectors 2-4-2 turn, in conjunction with the paving program. Loops shall be installed in the
pavement surface prior to final overlay or top course.

a. Installation shall be in accordance with the latest approved NHDOT Standard Details
and Specifications.

b. The City of Nashua will connect the new loop in the control panel if needed

c. Contractor will make connection in pull box. Contractor will solder, wire nut and
silicone seal connections for new loop at pull box. “Hockey puck” will not be used.

C. MEASUREMENT AND PAYMENT
Payment for this item shall be at the contract unit price specified for each. This payment shall
include all materials, labor, equipment, and all else needed to complete the work under this item

and make loops functional.

Contractor shall record the location of each loop. Quantities of loops shall be recorded per street.
Payment is contingent upon submittal of quantities in a per street format.

Page 32 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P258

Finance Committee - Agenda - 3/17/2021 - P259

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
259
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 618.6 - UNIFORMED OFFICERS
A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified uniformed officers as per the latest approved NHDOT
Standard Specifications for Road Construction. Uniformed officers shall only be used when the
Engineer has previously approved it. Daily coverage needs to be approved by the Engineer.

C. MEASUREMENT AND PAYMENT
Uniformed Officers will be measured by the actual number of hours authorized, as determined
by the Engineer. This item has a budgeted allowance as shown on the Bid Form. Payments to

Contractor will be made based on approved hours and resulting dollar amounts on Police
Department invoices and only after contractor’s proof of payment to Police Department.

Contractor shall record the number of hours for each officer used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format.

Page 33 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P259

Finance Committee - Agenda - 3/17/2021 - P260

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
260
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified flaggers as per the latest approved NHDOT Standard
Specifications for Road and Bridge Construction. Daily coverage needs to be approved by the
Engineer.

C. MEASUREMENT AND PAYMENT

Flaggers will be measured by the actual number of hours authorized, as determined by the
Engineer. Payment shall be made at the contract price per hour.

Contractor shall record the number of hours for each flagger used. Hours shall be recorded on a
per street basis. Payment is contingent upon submittal of quantities in a per street format

substantiated with invoices from flagging subcontractor.

Payment will not be made for flaggers who are not equipped with appropriate equipment or who
do not follow standard practice in performing their duties.

Page 34 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P260

Board Of Aldermen - Minutes - 10/10/2017 - P9

By dnadmin on Sun, 11/06/2022 - 21:54
Document Date
Tue, 10/10/2017 - 00:00
Meeting Description
Board Of Aldermen
Document Type
Minutes
Meeting Date
Tue, 10/10/2017 - 00:00
Page Number
9
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_m__101020…

Board of Aldermen — 10/09/17 Page 9

R-17-140
Endorser: Mayor Jim Donchess
Alderman-at-Large Lori Wilshire
Alderman Richard A. Dowd
Alderman June M. Caron
Alderwoman Mary Ann Melizzi-Golja
Alderman-at-Large Michael B. O’Brien, Sr.
RELATIVE TO THE ACCEPTANCE AND APPROPRIATION OF $32,000 FROM THE NEW
HAMPSHIRE CHARITABLE FOUNDATION INTO PUBLIC HEALTH AND COMMUNITY
SERVICES GRANT ACTIVITY “FY2018 NHCF SUBSTANCE ABUSE PREVENTION”
Given its first reading; assigned to the HUMAN AFFAIRS COMMITTEE by President McCarthy

NEW BUSINESS — ORDINANCES — None

PERIOD FOR GENERAL PUBLIC COMMENT — None

REMARKS BY THE MEMBERS OF THE BOARD OF ALDERMEN

Alderman Caron

I’d like to extend my condolences to Jim Sanderson’s family who passed away in Florida over the weekend.
Jim Sanderson was a longtime coach and friend to the Parks and Recreation Department. He worked very
hard to teach kids baseball. He was a coach for over 40 years. He worked alongside the other Mr. Baseball,
which was Ray Orban. | considered Jim a friend when | needed help for our basketball program for our senior
boys. He stepped in and continued to coach in that program for another 15 years. The community has lost a
wonderful citizen and person who was involved with the youth of Nashua. My heart goes out to Jim’s family,
Gail and their daughters. Thank you.

Committee announcements:

Alderman Clemons

Personnel/Administrative Affairs next Monday at 7:00 p.m. here in the Chamber.

Alderman Schoneman

Infrastructure, tomorrow night, October 11, here in the Chamber at 7:00 p.m.

Alderwoman Melizzi-Golja

PEDC next Tuesday here in the Chamber at 7:00 p.m.

ADJOURNMENT

MOTION BY ALDERMAN WILSHIRE THAT THE OCTOBER 10, 2017 MEETING OF THE BOARD OF
ALDERMEN BE ADJOURNED

MOTION CARRIED

The meeting was declared adjourned at 8:02 p.m.

Attest: Patricia Piecuch, City Clerk

Page Image
Board Of Aldermen - Minutes - 10/10/2017 - P9

Finance Committee - Agenda - 3/17/2021 - P261

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
261
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 619.1 - MAINTENANCE OF TRAFFIC
A. SCOPE

This work shall consist of providing and maintaining safe and passable traffic accommodations
for public traffic and furnishing, erecting and maintaining necessary traffic signs, barricades,
lights, signals, delineators, concrete barriers, signs, and other traffic control warning devices
through the work zone. The contractor is responsible for preparing a work area that is free of
parked vehicles or other obstructing objects. This includes, but is not limited to, erecting “no-
parking” signs provided by the City of Nashua 3 days prior to paving and returning same signs as
directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required maintenance of traffic needs based on the Contractors daily operations in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. At a minimum, the Contractor’s crew shall, at all times, carry Two
(2) of the following signs to be erected as the need may arise:

e ROAD WORK AHEAD (MUTCD W20-1)
e ONE LANE ROAD AHEAD (MUTCD W20-4)
e DIRECTIONAL ARROW SIGN (MUTCD W1-6)
e FLAGGER SIGN (MUTCD W20-7)
Contractor shall provide a minimum of 2 variable message signs for use on major roads.

Contractor shall be responsible for getting approved street opening permits, submitting traffic
control plans for all streets, obtaining lane closure or detour approval permits, and obtaining
emergency work permits.

The Contractor must notify, by email, the Engineer, and the City Solid Waste Department
Contact of specific types and locations of work. Notifications shall be provided the day before
work commences, during regular business hours (8am-5pm).

Engineer:
Mark Saunders

SaundersM@NashuaNH. gov

Solid Waste Department Contact:
Kevin Naro
NaroK@NashuaNH. gov

Page 35 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P261

Finance Committee - Agenda - 3/17/2021 - P262

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
262
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

C. MEASUREMENT AND PAYMENT

Maintenance of Traffic will be measured as a unit. Payment for maintenance of traffic shall be at
the contract lump sum, which lump sum includes full compensation for material, equipment and
labor to complete this portion of the Bid Schedule. The lump sum can only be amended by
written, approved change order. Progress payments towards the lump sum will be made
periodically based on the percent of the contract and the balance will be paid at final payment
upon completion of all project requirements. Should the contract be terminated prior to
completion, or the contract work not completed, total payment for this item shall be proportional
to the percentage of the contract completed.

Page 36 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P262

Finance Committee - Agenda - 3/17/2021 - P263

By dnadmin on Mon, 11/07/2022 - 13:45
Document Date
Fri, 03/12/2021 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/17/2021 - 00:00
Page Number
263
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__031720…

ITEM 632 —- RETROREFLECTIVE PAVEMENT MARKINGS
A. SCOPE

This work shall consist of furnishing and placing white or yellow retro reflective paint pavement
markings and retro reflective thermoplastic pavement markings at locations shown on the plans
or as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall furnish all labor, materials, equipment and transportation necessary for the
required placement of retro reflective paint and thermoplastic pavement markings in accordance
with the latest approved NHDOT Standard Specifications for Road and Bridge Construction, and
the latest approved MUTCD. A layout drawing shall be approved by the Engineer prior to any
work being done to the street.

Application temperature requirements shall be strictly enforced. Material placed outside
temperature requirements will not be accepted.

Striping shall match existing striping and be replaced in kind or as directed by the Engineer.
All stop bars, crosswalks and symbols shall be retro reflective thermoplastic and all long lines
shall be retro reflective paint.

C. MEASUREMENT AND PAYMENT

632.0104 Retroreflective Paint Pavement Marking,
Single Solid Line, 4in. Linear Foot

632.0112 Retroreflective Paint Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3112 Retroreflective Thermoplastic Pavement Marking,
Single Solid Line, 12in. Linear Foot

632.3118 Retroreflective Thermoplastic Pavement Marking, 18in. —_ Linear Foot

632.32 Retroreflective Thermoplastic Symbol Square Foot

Payment shall be per the unit listed above. Symbols will be paid for at the square footage listed
below:

Turn Arrow = 17 SF

Straight and Turn Arrow = 28.8 SF

Left/Through/Right = 40.25 SF

Straight Arrow = 12.5 SF

Only = 22.3 SF
Ahead = 31.3 SF
Stop = 22.2 SF

School = 34.7 SF

Page 37 of 42

Page Image
Finance Committee - Agenda - 3/17/2021 - P263

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2971
  • Page 2972
  • Page 2973
  • Page 2974
  • Current page 2975
  • Page 2976
  • Page 2977
  • Page 2978
  • Page 2979
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact