means for cleaning of the pipe to attempt to remove obstructions and root
cutting which shall be incidental to this item of work. If the line cannot be
videoed due to an obstruction, the Contractor shall attempt to video the line
from the opposing direction. All pre-lining videos shall be submitted to the
Engineer, shall be accompanied by a written report and shall clearly document the
condition of the main and all service connections.
C. POST-LINING VIDEO:
Measurement:
Post-lining video for sewer pipe will be measured, complete-in-place, by the
LINEAR FOOT of the actual pipe length videoed.
Payment:
The accepted quantity of sewer pipe videoed shall be paid for at the contract unit
price under the appropriate subdivisions of ITEM 1A and shall be full compensation
for the post-lining sewer pipe video to document the condition of the pipe, verify that
all service locations have been cored and in service, performing work related to
developing a report of the video after lining, and all labor, tools and any other
equipment necessary to complete the work. All post-lining videos shall be submitted
to the Engineer, shall be accompanied by a written report and shall clearly show the
condition of the main and all service connections.
Note:
1. Ten (10) percent may be withheld from payment under all 1A Items until the
CIPP has been satisfactorily videoed to verify it has been installed correctly.
2.02 SEWER POINT REPAIRS AND SERVICE CONNECTIONS COMPLETE IN
PLACE
A. POINT REPAIR OF EXISTING SEWERS:
Measurement:
The quantity to be measured under the various subdivisions of ITEM 1B will
be the actual number of point repairs measured by the EACH, complete-in-
place, as specified in these Specifications and as directed by the Engineer. The
depth for pay items shall be measured from the existing grade to the sewer pipe
invert.
Payment:
The accepted quantity of point repair items shall be paid for at the contract unit
price under the appropriate subdivisions of ITEM 1B and shall constitute full
compensation for cutting, removal and disposal of the existing damaged sewer
pipe, and installing a new PVC sewer main with specified couplings,
furnishing all materials, labor, tools, and equipment necessary to complete the
work, including but not limited to handling of existing wastewater flows, by-
pass pumping, excavation, backfill, removal and disposal of old pavement and
other unsuitable materials at the City landfill, pipe bedding and sand blanket,
2019 CIPP Lining Project Measurement and Payment