The Contractor shall be reimbursed without markup for approved invoices
from the Nashua Police Department which shall be paid under budget
ALLOWANCE under ITEM 9A. Payment shall constitute full compensation to
the Contractor for providing uniformed Nashua police officers with or without
vehicles, including all labor, high visibility safety gear, tools and any other
equipment necessary to complete the work as specified herein. Payment shall
be made only after Contractor has provided proof of payment to Police
Department.
B. FLAGGERS
Measurement:
The quantity of Flaggers will be measured by the HOUR based on the actual
number of hours authorized, as determined by the Engineer. The Contractor
shall supply qualified flaggers as stated in Section 618 of the NHDOT
Standard Specifications for Road and Bridge Construction, (Approved and
Adopted in 2016). Daily coverage needs to be approved by the Engineer. The
Contractor's schedule for flaggers shall be agreed upon cooperatively with the
Engineer.
Payment:
The approved quantity of flaggers hours shall be paid at the contract price for
ITEM 9B. Payment shall constitute full compensation to the Contractor for
providing qualified flaggers as required to direct traffic through or around the
Work as ordered by the Engineer, including all labor, high visibility safety
gear, tools and any other equipment necessary to complete the work as
specified herein. In no case shall the gross hourly rate exceed $30/hour for
straight time work and $45/hour for overtime work. Payments to Contractor
will be made based on approved hours and resulting dollar amounts.
C. MAINTENANCE OF TRAFFIC
Measurement:
Maintenance of traffic shall be measured as a LUMP SUM as specified herein.
Payment:
The contract price for Item 9C shall constitute full compensation for providing
and maintaining safe and passable traffic accommodations for public travel,
preventing dust nuisance and fumishing, erecting and maintaining necessary
traffic signs, barricades, lights, signals, flashing beacons, delineators and other
traffic control warming devices and shall include means of guidance of traffic
through and around the work zones. Traffic warning signs and other regulating
devices shall be installed in accordance with the MUTCD and details on the
plans. Payments toward the lump sum will be made at each payment
requisition based on the percent of contract completed and the balance will be
paid at final payment upon completion of all project requirements. Should the
contract be terminated prior to completion, or the contract work not completed,
2019 CIPP Lining Project Measurement and Payment
Nashua, NH 01150- 11