Payment:
The accepted quantity of manhole invert reconstruction shall be paid for at the
contract unit price under ITEM 1H, and shall be full compensation for the
demolition of the existing invert and the reconstruction of the new brick invert,
by-pass pumping, decanting and disposal of debris at the City landfill and all
labor, tools and any other equipment necessary to complete the work as
specified in these Specifications and as directed by the Engineer.
2.07 SEWER MANHOLE INTERNAL DROP ASSEMBLY COMPLETE IN PLACE
Measurement:
The quantity to be measured under ITEM 1J will be the actual number of sewer
manhole internal drop assemblies constructed (up to 8 vertical feet) by the
EACH, complete-in-place, as specified in these Specifications and as directed
by the Engineer.
Payment:
The accepted quantity of manhole internal drop assemblies constructed shall be
paid for at the contract unit price under ITEM 1J, and shall be full
compensation for the demolition of the existing drop assembly and the
reconstruction of the new internal drop assembly, by-pass pumping, and all
labor, tools and any other equipment necessary to complete the work as
specified in these Specifications and as directed by the Engineer.
2.08 REPLACE OR CONSTRUCT SEWER MANHOLE COMPLETE IN PLACE
Measurement:
The quantity of sewer manholes replaced or constructed under ITEM 1K and
ITEM 1KK will be measured complete-in-place by the VERTICAL FOOT as
measured from the lowest invert to the top of the manhole casting, complete-
in-place, as specified in these Specifications and as directed by the Engineer.
Payment:
The accepted quantity of sewer manholes replaced or reconstructed shall be
paid for at the contract unit price under ITEM 1K and ITEM 1KK, and shall
constitute full compensation for removal and disposal of the existing sewer
manhole, constructing new pre-cast sewer manhole, furnishing and
installing 30” diameter frame and cover, reconnecting sewer pipes with
necessary couplings and fittings, complete in place as indicated on the
drawings and/or as specified, including furnishing all materials, labor, tools,
and equipment necessary to complete the work, including but not limited to
handling of existing wastewater flows, by-pass pumping, excavation,
backfill, manhole bedding, removal of old pavement and other unsuitable
materials at the City landfill, manhole vacuum testing, and all work
incidental thereto and not specifically included for payment under other
items.
2019 CIPP Lining Project Measurement and Payment