Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P567

Finance Committee - Agenda - 3/6/2019 - P567

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
567
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

2.09 REPLACE EXISTING SEWER MANHOLE FRAME AND COVER COMPLETE
IN PLACE
Measurement:
The quantity to be measured under ITEM IL shall be by the actual number of
manhole frames and covers replaced measured by the EACH, complete-in-
place, as specified in these Specifications and as directed by the Engineer.

Payment:

The accepted quantity of existing sewer manhole frames and covers replaced
shall be paid for at the contract unit price under ITEM 1L, and shall be full
compensation for excavation, backfill, removal and disposal of the existing
frame and cover, old pavement and other unsuitable materials at the City
landfill; remodeling of the existing manhole up to 18 inches below the frame,
furnishing and installing new City standard frame and cover, adjustments of
casting to finish grade with brick courses, and all labor, tools and equipment
necessary to complete the work as specified in these Specifications and as
directed by the Engineer.

Note:
1. The restoration of the pavement and base course gravels around the new

frame and cover shall be paid for separately under the appropriate
ROADWAY RESTORATION contract items.

2.10 ROADWAY RESTORATION COMPLETE IN PLACE

A. CRUSHED GRAVEL:
Measurement:
The quantity to be measured under ITEM 6A shall be measured per CUBIC
YARD, in place. Quantities shall be measured for payment as directed and
approved by the Engineer. Over-excavated trenches will not be allowed.

Payment:
The approved quantity of crushed gravel shall be paid for at the contract unit

price for ITEM 6A and shall be full compensation for the furnishing, placing,
compacting and fine grading crushed gravel including all labor, tools and any
other equipment necessary to complete the work as specified in these
Specifications and as directed by the Engineer.

B. HOT BITUMINOUS PAVEMENT
Measurement:
The quantity to be measured under ITEM 6B (Hot Bituminous Pavement -
Temporary Pavement, Permanent Pavement - Binder and Wearing Course)
shall be measured by the TON based on weight slips provided on the job site
and approved by the Engineer.

Payment:

2019 CIPP Lining Project Measurement and Payment
Nashua, NH O1150-7