Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 3/6/2019 - P564

Finance Committee - Agenda - 3/6/2019 - P564

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
564
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

complete in place as indicated on the drawings and/or as specified including all
work incidental thereto and not specifically included for payment under other
items, all as specified in these Specifications and as directed by the Engineer.

Note:

1. The length of the repair shall be assumed to be 10 linear feet or less. If in the
opinion of the Engineer the repair requires more than 10 linear feet of new
pipe repair, a change order will be negotiated with the Contractor.

2. Work shall conform to City of Nashua Standard Specifications Sewer &
Drains. Sewers within 18" of a water main shall be constructed of Class 52
Ductile Iron Pipe.

B. REMOVE AND REPLACE EXISTING SEWER SERVICE AT POINT
REPAIR:

Measurement:

The quantity of existing sewer service to be removed and replaced at point
repairs under ITEM 1C will be measured, complete-in-place, by the LINEAR
FOOT of actual pipe length installed.

Payment:

The accepted quantity of 6” PVC sewer service installed shall be paid for at the
contract unit price for ITEM IC and shall constitute full compensation for the
removal and disposal of the existing sewer service pipe, and for installing a
new 6” PVC-SDR 35 sewer service at all depths including the wye at the sewer
main and all necessary fittings and couplings complete in place as indicated on
the drawings and/or as specified, furnishing all materials, labor, tools, and
equipment necessary to complete the work, including but not limited to
handling of existing wastewater flows, by-pass pumping, excavation, backfill,
removal and disposal of old pavement and other unsuitable materials at the
City landfill, bedding and sand blanket, and all work incidental thereto and not
specifically included for payment under other items as specified in these
Specifications and as directed by the Engineer.

Note:
1. Work shall conform to City of Nashua Standard Specifications Sewer &

Drains. Sewers within 18" of a water main shall be constructed of Class 52
Ductile Iron Pipe.

2.03 VIDEO OF SEWER LINES NOT SCHEDULED FOR LINING
(PIPE SIZES 8” TO 24”) COMPLETE IN PLACE
Measurement:
The quantity of video of existing sewer pipe from 8” to 24” will be measured,
complete-in-place, by the LINEAR FOOT of the actual pipe length videoed.

Payment:
The accepted quantity of sewer pipe videoed shall be paid for at the contract unit
price under ITEM 1D and shall be full compensation for initial cleaning of the

2019 CIPP Lining Project Measurement and Payment
Nashua, NH 01150 - 4