Finance Committee - Agenda - 3/6/2019 - P589

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
589
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

by benching into the slope.

If the material removed from the excavation is suitable for backfill with the
exception that it contains stones larger than permitted, the Contractor has the
option to remove the oversized stones and use the material for backfill or to
provide replacement backfill at no additional cost to the Owner.

The Contractor shall remove loam and topsoil, loose vegetation, stumps, large
roots, etc., from areas upon which embankments will be built or areas where
material will be placed for grading. The sub-grade shall be shaped as indicated
on the Drawings and shall be prepared by forking, furrowing, or plowing so
that the first layer of the fill material placed on the sub-grade will be well
bonded to the sub-grade.

Where called for on the Drawings, Lightweight Fill shall be placed and
compacted as recommended by the manufacturer. The exact number of passes
shall be approved by the Engineer to insure stability of the layer. As soon as
the compaction of each layer has been completed, the next layer shall then be
placed. The Contractor shall take all necessary precautions during construction
activities in operations on or adjacent to the Lightweight Fill to insure that the
material is not over-compacted. Construction equipment, other than for
compaction, shall not operate on the exposed Lightweight Fill. The top surface
of the Lightweight Fill lying directly below the gravel course shall be chinked
by additional rolling of the Lightweight Fill to prevent infiltration of fines.

B. TRENCHES:

l.

Bedding as detailed and specified shall be furnished and installed beneath the

pipeline prior to placement of the pipeline. A minimum bedding thickness shall

be maintained between the pipe and undisturbed material, as shown on the

Drawings.

As soon as practicable after pipes have been laid, backfilling shall be started.
Unless otherwise indicated on the Drawings, select backfill shall be placed by
hand shovel in 6-inch thick lifts up to a minimum level of 12-inches above the
top of pipe. This area of backfill is considered the zone around the pipe and
shall be thoroughly compacted before the remainder of the trench is backfilled.
Compaction of each lift in the zone around the pipe shall be done by use of
power-driven tampers weighing at least 20 pounds or by vibratory compactors.
Care shall be taken that material close to the bank, as well as in all other
portions of the trench, is thoroughly compacted to densities required.

Class B backfill shall be placed from the top of the select backfill to the
specified material at grade (loam, pavement sub-base, etc.). Fill compaction
shall meet the density requirements of this specification.

Water Jetting:

a. Water jetting may be used when the backfill material contains less than
10 percent passing the number 200 sieve, but shall be used only if
approved by the Engineer.

b. Contractor shall submit a detailed plan describing the procedures he
intends to use for water jetting to the Engineer for approval prior to any

2019 CIPP Lining Project Earthwork

Nashua, NH

02300-7

Page Image
Finance Committee - Agenda - 3/6/2019 - P589

Finance Committee - Agenda - 3/6/2019 - P590

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
590
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

water jetting taking place.
c. Compaction of backfill placed by water jetting shall conform to the
requirements of this specification.

6. If the materials above the trench bottom are unsuitable for backfill, the
Contractor shall furnish and place backfill materials meeting the requirements
for trench backfill, as shown on the drawings or specified herein.

7. Should the Engineer order crushed stone for utility supports or for other
purposes, the Contractor shall furnish and install the crushed stone as directed.

8. In shoulders of streets and the road, the top 12-inch layer of trench backfill
shall consist of crushed gravel for sub-base, satisfying the requirements of
NHDOT.

C. BACKFILLING ADJACENT TO STRUCTURES:

1. The Contractor shall not place backfill against or on structures until they have
attained sufficient strength to support the loads to which they will be
subjected. Excavated material approved by the Engineer may be used in
backfilling around structures. Backfill material shall be thoroughly compacted
to meet the requirements of this specification.

2. Contractor shall use extra care when compacting adjacent to pipes and drainage
structures. Backfill and compaction shall proceed along sides of drainage
structures so that the difference in top of fill level on any side of the structure
shall not exceed two feet (2') at any stage of construction.

3. Where backfill is to be placed on only one side of a structural wall, only hand-
operated roller or plate compactors shall be used within a lateral distance of
five feet (5') of the wall for walls less than fifteen feet (15') high and within ten
feet (10') of the wall for walls more than fifteen feet (15') high.

3.04 DISPOSAL OF SURPLUS MATERIALS:

A. No excavated material shall be removed from the site of the work or disposed of by
the Contractor unless approved by the Engineer.

B. Surplus excavated materials, which are acceptable to the Engineer, shall be used to
backfill normal excavations in rock or to replace other materials unacceptable for
use as backfill.

C. Surplus excavated clean material not needed as specified above shall be hauled away
and disposed of by the Contractor at the Nashua Landfill. Arrangements must be
made with the landfill prior to delivery. Disposal of all rubble shall be in
accordance with all applicable local, state and federal regulations.

END OF SECTION

2019 CIPP Lining Project Earthwork
Nashua, NH 02300-8

Page Image
Finance Committee - Agenda - 3/6/2019 - P590

Finance Committee - Agenda - 3/6/2019 - P591

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
591
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

SECTION 02441

CLEANING, ROOT CUTTING, AND TELEVISION INSPECTION OF PIPELINES

PART 1 - GENERAL

1.01

A.

1.02

Uo w >

1.03

1.04

WORK INCLUDED:

The Contractor shall furnish all materials, tools, labor and equipment necessary to clean the
pipeline of debris, perform root cutting and visually inspect by means of a closed-circuit
television (CCTV) all sewers to be lined (CIPP) under this Contract, as hereinafter
specified. The sewers shall be inspected throughout their entire length.

RELATED WORK:

Section 01330, SUBMITTALS

Section 01331, DOCUMENTATION

Section 02085, POLYVINYL CHLORIDE GRAVITY PIPE AND FITTINGS

Section 02650, CURED-IN-PLACE (CIPP) LINING OF EXISTING SEWERS (HOT
WATER OR STEAM CURING)

Section 02650, CURED-IN-PLACE (CIPP) LINING OF EXISTING SEWERS

(ULTRAVIOLET CURING)

QUALITY ASSURANCE:

The work described herein shall be performed by a company with not less than five (5) years

of experience in providing the required services, employing experienced workers and
experienced supervisory personnel. Supervisory personnel shall have not less than three
years of experience in providing the required services and shall be present at the jobsite
during all work related to the required services.

SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:

A. Prior to beginning work, submit six (6) sets of the following:

2019 CIPP Lining Project Cleaning, Root Cutting and Television Inspection of Pipelines
Nashua, NH 0244 1-1

Page Image
Finance Committee - Agenda - 3/6/2019 - P591

Finance Committee - Agenda - 3/6/2019 - P592

By dnadmin on Mon, 11/07/2022 - 13:12
Document Date
Fri, 03/01/2019 - 12:37
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 03/06/2019 - 00:00
Page Number
592
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__030620…

1. Qualifications of the firm/personnel who will perform the work;

2. Description of system proposed for handling existing flows during the various
procedures to be carried out;

3. Description of the system and equipment proposed for cleaning;
4. Description of the system and equipment proposed for root cutting; and

5. Description of the system and equipment proposed for televising the pipe after
cleaning.

PART2-PRODUCTS

2.01

A,

B.

EQUIPMENT:
DVD (Read only) video system shall be used which utilizes standard DVD recording discs.

The television camera used for the inspection shall be a pan and tilt closed circuit color
television camera specifically designed and constructed for such inspections. Lighting for
the camera shall be suitable to allow a clear picture for the entire periphery of the pipe.
The camera shall be operative in 100 percent humidity conditions. The camera, television
monitor and other components of the video system shall be capable of producing a
minimum 400 line resolution color video picture. Picture quality and definition shall be to the
satisfaction of the Engineer and, if unsatisfactory, equipment shall be removed and no
payment made for the unsatisfactory inspection.

PART 3-EXECUTION

3.01

A.

CLEANING:

The Contractor may elect to use either high velocity jet, or mechanically powered
equipment, as described in the NASSCO Standard Specifications. Selection of equipment
shall be based upon field conditions such as access to manholes, quantity of debris, size of
sewer, depth of flow, etc.

All sludge, dirt, sand, rocks, grease, and other solid or semisolid material resulting from the
cleaning operation shall be decanted and disposed of at the City landfill, and in a method
acceptable to the Engineer. Pipe cleaning shall be performed in advance of pipe television
inspection.

Acceptance by the Engineer of the cleaning results will be based on the results of television
inspection. If the results are unsatisfactory, the Contractor shall repeat the cleaning until
accepted by the Engineer at no additional cost to the Owner.

2019 CIPP Lining Project Cleaning, Root Cutting and Television Inspection of Pipelines
Nashua, NH 02441-2

Page Image
Finance Committee - Agenda - 3/6/2019 - P592

Finance Committee - Minutes - 2/20/2019 - P3

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Wed, 02/20/2019 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__022020…

Finance Committee - 2/20/2019 Page 3
Alderman Caron

| have no problem with reducing the rent because | have seen the progress they have made on the building
and it is being utilized, it is not being vandalized and if they decide to leave at any time, we have a functioning

facility for us. If | had remembered correctly we had started off that it would be almost what the cost of taxes
would be. But thank you for that more elaborate explanation.

Mayor Donchess

Anyone else? Is there a Motion at this point?

Alderwoman Kelly

Yes I’ve moved for Final Passage.

Mayor Donchess

Motion is for Final Passage of R-19-110. Any discussion?

MOTION CARRIED

NEW BUSINESS — ORDINANCES -— None

RECORD OF EXPENDITURES

MOTION BY ALDERWOMAN KELLY THAT THE FINANCE COMMITTEE HAS COMPLIED WITH THE CITY
CHARTER AND ORDINANCES PERTAINING TO THE RECORD OF EXPENDITURES FOR THE PERIOD
FEBRUARY 1, 2019 TO FEBRUARY 15, 2019

MOTION CARRIED

GENERAL DISCUSSION - None

PUBLIC COMMENT - None

REMARKS BY THE ALDERMEN - None

POSSIBLE NON-PUBLIC SESSION - None

ADJOURNMENT

MOTION BY ALDERMAN O’BRIEN TO ADJOURN
MOTION CARRIED

The Finance Committee meeting was adjourned at 7:07 p.m.

Alderwoman-at-Large Shoshanna Kelly
Committee Clerk

Page Image
Finance Committee - Minutes - 2/20/2019 - P3

Finance Committee - Agenda - 2/20/2019 - P1

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 02/15/2019 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022020…

FINANCE COMMITTEE
FEBRUARY 20, 2019
7:00 pm Aldermanic Chamber
ROLL CALL
PUBLIC COMMENT
COMMUNICATIONS
From: Dan Kooken, Purchasing Manager
Re: Purchase of One (1) Transit CNG Bus (Value $523,542)
Department: 186 Transportation; Fund: Grant
From: Dan Kooken, Purchasing Manager
Re: Purchase of One (1) Vac-Con Combination Jet/Vacuum Sewer Cleaner ($395,700)
Department: 169 Wastewater; Fund: WERF

UNFINISHED BUSINESS — None
ANTICIPATED REFERRAL FROM THE BOARD OF ALDERMEN MEETING OF FEBRUARY 19, 2019
R-19-110

Endorser: Mayor Jim Donchess

AUTHORIZING THE CITY OF NASHUA TO ENTER INTO A LEASE AGREEMENT WITH MAKEIT

LABS, CORP. FOR 25 CROWN STREET
RECORD OF EXPENDITURES
GENERAL DISCUSSION
PUBLIC COMMENT
REMARKS BY THE ALDERMEN
POSSIBLE NON-PUBLIC SESSION

ADJOURNMENT

Page Image
Finance Committee - Agenda - 2/20/2019 - P1

Finance Committee - Agenda - 2/20/2019 - P2

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 02/15/2019 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022020…

| THE CITY OF NASHUA “the Cate City

Financial Services

Purchasing Department

February 14, 2019
Memo #19-119

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: PURCHASE OF ONE (1) TRANSIT CNG BUS (VALUE $523,542)
DEPARTMENT: 186 TRANSPORTATION; FUND: GRANT

Please see attached communication from Sarah Marchant, Community Development Division Director,
dated February 9, 2019 for information related to this contract award.

Pursuant to § 5-84 Special purchase procedures A. (3) Purchases which can be procured through
cooperative intergovernmental purchase agreements with other governmental jurisdictions.

The Community Development Division Director and the Purchasing Department recommend the award of
this purchase to Gillig LLC. of Livermore, CA in an amount of $523,542.
Resp

tfully,
LMG Be

on jan Kéoken
Purchasing Manager

Ce: S. Marchant J. Graziano

229 Main Street » Nashua, New Hampshire 03061 © Phone (603) 589-3330 e Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 2/20/2019 - P2

Finance Committee - Agenda - 2/20/2019 - P3

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 02/15/2019 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022020…

e Community Development 589-3095
City of Nashua Planning and Zoning 589-3090

. oe Building Safety 589-3080
Community Development Division Code Enforcement 589-3100
City Hall, 229 Main Street, PO Box 2019 Cores mission baoanre
Nashua, New Hampshire 03061-201 9 Transportation 880-0100
www.nashuanh.gov FAX 589-3119

Date: February 9, 2019
To: Jim Donchess, Mayor
From: Sarah Marchant, Community Development Division Director

Re: Finance Committee — “Notice of Exercise of Option” on existing Gillig, LLC contract to
Purchase 1 additional fixed route 30’ CNG Bus

The Nashua Transit System went out to bid in 2016 with RFP0156-010716 CNG Low Floor Buses
to replace eight of its fixed route buses. A contract with Gillig, LLC was approved by the Finance
Committee on June 15, 2016 and signed on July 27, 2016.

Pursuant to Part 1 and Part 9, Section 3, of the RFP and all other applicable parts of the agreement,
the City of Nashua is exercising its option to purchase one (1) additional 30’ CNG bus under the
terms and conditions of the previous four (4) buses per the agreement. This new bus will replace
one of the trolleys that has exceeded its useful life and will continue to have rising maintenance
costs. Having a new replacement bus will enhance the experience of our riders who prefer full sized
buses to the current trolleys.

The price of this 30’ bus is $523,542 payable upon accepted delivery of the bus. This price is based
upon the original purchase price with the additional cost applied from the PPI Index Escalator, as
discussed in Section 1.3 of the RFP. FTA funding has been awarded through a Bus and Bus
Facilities Infrastructure Investment Program Grant and will pay 85% of the capital costs for a total
of $445,010. The State of NH and the City of Nashua will provide match funding at 7.5%
respectively for a total of $39,266 each.

The anticipated delivery date of the CNG 30” low floor bus is prior to June 30, 2020. We are
requesting approval to purchase this bus from Gillig, LLC under our current contract in the amount
of $523,542.

Page Image
Finance Committee - Agenda - 2/20/2019 - P3

Finance Committee - Agenda - 2/20/2019 - P4

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 02/15/2019 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
4
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022020…

Le & 11 Riverside St. » Nashua, NH * 03062 * phone: 603-880-0100 ° fax: 603-821-2042

vww.RideBigBlue.com

February 9, 2019

William Fay

Director National Sales
Gillig LLC

451 Discovery Drive
Livermore, CA 94551

Subject: Nashua Transit -Notice of Exercise of Option for 1 CNG 30’ bus

Dear Mr. Fay,

Pursuant to Part 1 and Part 9, Section 3, of the RFP, and all other applicable parts of the
agreement, the City of Nashua is exercising its option to purchase one (1) additional 30’ CNG
bus under the terms and conditions of the previous four (4) buses per the agreement.

The price of this 30’ bus is $523,542 payable upon accepted delivery of said bus.

The anticipated delivery date of bus is prior to June 30, 2020.

Gillig Representative Date

Sincerely,

Camille Pattison
Transportation Manager

CC: file, Jerry Sheehan

Page Image
Finance Committee - Agenda - 2/20/2019 - P4

Finance Committee - Agenda - 2/20/2019 - P5

By dnadmin on Mon, 11/07/2022 - 13:13
Document Date
Fri, 02/15/2019 - 12:03
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/20/2019 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__022020…

PRICE SUMMARY
9/17/2018
NASHUA, NH OFF OF Nashua, NH RFP 0156-010716
(3) 29" LOW FLOORS

SN: TBD

ACTION = SECTION ITEM COST
NASHUA, NH 29' LOW FLOOR BASE UNIT PRICE (9/9/2016) $492,554.00
DELETE 2. TRANSMISSION LOCKOUT ($200.00)
ADD 6 BENDIX SMARTIRE $921.00
ADD 9 EPA MANDATED CUMMINS NEAR ZERO ENGINE $9,793.00
ADD 9 FUEL GAUGE $60.00
ADD 20 FRONT THRESHOLD HEATER $324.00
DELETE 23. GREEN DOOR LAMP ($45.00)
ADD 39 ‘YIELD SIGN $200.00
ADD 49 TWO-TONE FLOORING W/ WHEEL CHAIR SYSMBOLS $150.00
ADD 71. GRAPHICS $910.00
NASHUA, NH 29' LOW FLOOR BUS PRICE $504,667.00
ADD PPI 1413 ADJUSTMENT: 246.9 (AUG 18’) / 238.0 (SEPT 16’) = 3.74% $18,875.00
NASHUA, NH 29' LOW FLOOR CURRENT PRICE(9/17/2018) $523,542.00

SPARES & TOOLING BUDGET

NASHUA, NH SPARES & TOOLING BUDGET (TO DEFFERRED ACCOUNT) $0.00

CONFIDENTIAL

This pricing information is intended only for the personal and confidential use of the recipient(s) to whom it was originally sent. If you are
not an intended recipient of this information or an agent responsible for delivering it to an intended recipient, you are hereby notified that

Page 1 of 1

Page Image
Finance Committee - Agenda - 2/20/2019 - P5

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2287
  • Page 2288
  • Page 2289
  • Page 2290
  • Current page 2291
  • Page 2292
  • Page 2293
  • Page 2294
  • Page 2295
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact