Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 7791 - 7800 of 38765

Board Of Aldermen - Agenda - 7/14/2020 - P82

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH
2019-2022 REVALUATION

RESIDENTIAL DATA COLLECTION GUIDELINES

Page [6

Functional & Economic Obs — leave as is, verify reason exsists if possible, if no longer
exsists flag card for field reviewers to review for removal

Special Obs - Data collectors only use for new construction % complete if less than 100,
otherwise leave as is for field reviewers.

COMMENT'S..Leave current comments, Any new comments preface with current year
2020 ~ new addition added te sketch 16x20
This is your notes section to address any special features

TOTAL ROOMS- The total number of rooms (except bathrooms) above Grade level
will be included in the Room Count.

SEDROOMS- Please include above grade bedrooms onlyGENERAL
INFORMATION:

® Ifyou are picking up an outbuilding for the first time use current year as year
built.
Rounding 6 inches and below round down
Price foundations at $10,000 each
Fireplaces go in the Special Feature/Yard item section, non functional fireplaces
i@ 50% condition

© Hair conditioning ask if Central, heat pump or zone type and put in comments
section
Overhangs less than 2 ft use 1 ft
Free standing deck as WDK
Vestibules in office, retail, industrial, educational, religious (churches), ect.
Sketch building area as VST.

SKETCH:

® Please measure and verify ali dwellings and outbuildings. Make all corrections
neat and clean. Make sure all sketches and area codes match the homes story
height.

2 All dwelling story heights are to be broken out.

e CTH- Cathedral area is to be sketched out as CTH

» All curves and angles are to be measured and sketched, with exception of bay
windows- this will mostly be found on C&1 properties but be aware on the
residential class of properties, also if a house is area coded it should be fully
sketched., any questions see your crew chief

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P82

Board Of Aldermen - Agenda - 7/14/2020 - P83

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH

2019-2022 REVALUATION
RESIDENTIAL DATA CGLLECTION GUIDELINES
Page 17
SUB AREA COBES:
Code Description Full Description
AOE OFFICE AVG
APT APARTMENT
FINISHED ATTIC -d HIGH-A\TCHED ATTIC ROOT GENERALLY FOUND
ON CAPE STYLE HOMES, QUALITY OF INTERIOR FIN'SHED NEARLY
AYG ATTIC EAN EQUAL GR EQUAL TO MAIN FLOOR LIVING AREA MAY OR MAY NOT
HAVE DORMER COVERAGE NOT EXCEEDING 26% OF TOTAL ROOF
AREA USABLE FLOOR SPACE EQUALS 30-50% DUE TO ROOFLINE
CONSTRAINTS.
BGR BMY GARAGE BASEMENT GARAGE
BLN BULKHEAD
UNFINISHED BASEMENT - BELOW GRADE UNFINISHED AREA,
BHT BASEMENT COMMONLY KNOWN AS 4 CELLAR:
CON CANOPYOET
CLP LOAOGFIFIN FINISHED LOADING PLATEORM
CNP CANOPY CANOPY: ROOF STRUCTURE WITH NO FINISHED FLOORS OR WALLS -
OLD CAN
OPT CARPORT
CTH CATHEDRAL CATHEDRAL CEILING
OAR DORMER
EAVESI/ATC FIN- ACCESS VIA PERMANET STAIRWAY, LOW
EAE EVS/ATC FIN PITCHED ROOF: QUALITY OF FINISH LESS THAN MAIN LIVING AREA
GENERALLY FOUNDON THIRD FLOOR LEVEL-SMALLER-
EAU UNEATTIC EX UNFINISHED ATTIC EXPANSION: SAME AS EAF EXCEPT NO INTERIOR
FINISH
FINISHED ENCLOSED PORCH - TYP-CALLY UNINSULATO AND
EFP ENCL PORCH UNHEATED OR MARGINALLY HEATEG SEASONAL LIVING AREA WITH
FINISHEO FLOOR, WALLS, CEILIN, HEAT
FINISHED SASEMENT- BELOW GRADE LEVEL WHICH MUST MEET AT
FEM FINISHED BMT LEST THREE OF THE FOUR FOLLOWING CRITERIA FINISHED
FLOOR, WALLS, CEILING HEAT
FCB CABANA ENC FINISHED ENCLOSED CABANA
FINISHED CARPORT- ROOF TYPE STRUCTURE LARGE ENOUGH TO
FCP CARPORT FIN COVER AN AUTOMOBILE. GENERALLY TWO WALLS OR MORE
EXPOSEO TO WEATHER
FOC CARPORTDET
FINISHED FIRST FLOOR. FIRST OR PRIMARY FLOOR, HEATED
FFL FIRST FLR FINISHED LIVING AREA
FRG FIN &S0 BM FINISHED RAISED BASEMENT +
FSF FINSCRPRCH FINISHED SCREEN PORCH
FINISHED UTILITY/STORAGE- LOW QUALITY STORAGE AREA WITH
Fat FIN UTILITY FINISHED INTERIOR {NOT COMMON]
FTH FOURTH FLA FOURTH FLOOR
GARAGE- STRUCTURE LARGE ENOUGH FOR AUTOMOBILE STORAGE
GAR GARAGE

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P83

Finance Committee - Agenda - 1/19/2022 - P62

By dnadmin on Sun, 11/06/2022 - 21:39
Document Date
Thu, 01/13/2022 - 13:22
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/19/2022 - 00:00
Page Number
62
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011920…

APPENDIX A
SCOPE OF WORK

PROJECT DESCRIPTION
Waste Line Replacement and Associated Transit Administration Building Repairs

PROJECT AREA
The project area is located at the Nashua Transit Administration Building, 11 Riverside Street,
Nashua, NH 03062.

DBE
The City encourages disadvantaged business enterprise (DBE) participation from contractors and/or
subcontractors.

SCOPE

The City is seeking bids to replace the 4” cast iron waste piping from the interior bathrooms to the
exterior Sewer connection with approximately 80 linear feet of underground Schedule 40 PVC 4”
piping. There are 5 water closets, 1 urinal, and 7 lavatories involved, which are intended to be
reused. It is assumed that there is cast iron piping within walls, however that has not been confirmed.
The project includes the replacement of cast iron waste piping connecting the water closets, urinal
and lavatories to the main waste line as well as main waste line with PVC piping and reconnect to
existing venting.

There are 3 different types of flooring, including ceramic tile, sheet vinyl and commercial tile that
will require replacement after the concrete finish work. The work is intended to be completed
without impacting interior wall structures except for sheetrock replacement as needed.

The Administration Building is operational Monday through Saturday from 5am to 11pm. This
office requires limited noise to operate effectively as such concrete sawing and hammering will
likely have to be completed on Sundays, and possibly Saturdays, the bid response should including
pricing for the project to be completed during the week and an alternative rate for some work to be
completed on Sundays and possibly Saturdays if noise will be a factor. . There are side doors for
working access and plenty of parking for trucks.

Staff anticipates the job will involve saw cutting of the floors, proper compaction of the trench
bottom using crushed stone to support the new pipe and patching of floors with like kind materials
and finishes

Prepare a preliminary plan of work required for review with the City team including Building Safety,
Facilities and Plumbing Inspection. Plan shall include any and all related construction/rehabilitation
required to complete installation of new sewer piping including new bathroom fixtures if needed.

Final Plan
Prepare Final Plan and applications for building permit

Construction through Final Approval

Removal and re-installation of sewer piping (including other related required
construction/rehabilitation to the building). Specifics to be approved by the City
Complete all inspections for project per, building permit and plumbing permit

Page Image
Finance Committee - Agenda - 1/19/2022 - P62

Board Of Aldermen - Agenda - 7/14/2020 - P84

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH

2019-2022 REVALUATION
RESIDENTIAL DATA COLLECTION GUIDELINES
Page L8
Gade Boseription Full Dascristion
FINISHED HALF STORY. AN UPPER LEVEL STORY WITH 50-70% OF
THE FLOOR AREA AVAILABLE DUE TO ROOF LINE CONSTRAITS. ON
HST HALE STORY ASONVENTIONAL STYLE, THE ROOF EAVES ARE TYPICALLY CUT
AT THE MiO-HEIGHT OF THE WINDOW. ON CAPE STYLE, TYPICALLY
AND EAF WiTH DORMER COVERAGE
GREATER THAN 25% AND NOT EXCEEDING 80%
GRN GREENHOUSE
LOK LOADING DOCK
SEMI FINISHED BAS- PERHAPS A MISNOMER @UT UTILIZE FOR
LLY LOWER LEVEL FINISHED
LIVING AREA THAT IS PARTICALLY BELOW GRADE UTILIZED FOR
FINISHED LOWER LEVEL ON RAISED RANCHES ANDO SPLIT LEVELS
MEZ Fit MEZNINE FINISHED MEZZANINE
MzZz UNE MEPAIME UNFINISHEO MEZZANINE
FINISHED OPEN PORCH-A ROOF STRUCTURE WITH FLOORS WITH
OFP OPEMFRMPRC AT LEAST ONE OF ITS SIDES EXPOSED TO THE WEATHER
osP OPN SCN PRCH FINISHED SCREEN PORCH -
PAT PATIO PATIO. MASONRY FLOGR TYPICALLY OF CONCRETE OR BRICK {
SDA STORE OSPLY STORE DISPLAY AREA
SFB S FIN BAS USE LLV - SFB NOT USED
FINISHED SECOND FLOOR- UPPER FLOOR LEVEL LIVING SPACE
SFL SECOND FLR WITH FULL CEILING HEIGHT AND FINISHED INTERIOR - OLD FUS
SPA SERVICE PROD SERVICE PRODUCTION AREA
UNFINISHED UTELITY/STORAGE UNFINISHED A@BA UTILIZED FOR
STG STORAGE STORAGE.
STP STOOP STOOP: AN OPEN PAO TYPICALLY STONE OR CONGRETE WITH NO
ROOF,
TRL THIRD FLR THIRD FLOOR
FINISHED UPPER LEVEL LIVING AREA WITH 78-90% GF THE FLOOR
ras a4 STORY AREA AVAILASLE OUE TO ROGF LINE CONSTRAINTS USE ON CAPES
THAT HAVE GREATER THAN 50% DORMER COVERAGE. OR
CONVENTIONAL STYLE WHERE EAVES CUT WINDOW ABOVE THE MID-
POINT HEIGHT
UAT UNFATC UNFINISHED ATTIC- SAME AS ATC EXCEPT THAF INTERIOR IS
UNFIMISHED AGAIN, MUST HAVE PERMANENT STAIRWAY ORELSE
DO MOT LIST
ucN POOR CANOPY

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P84

Board Of Aldermen - Agenda - 7/14/2020 - P85

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH

2019-2022 REVALUATION
RESIDENTIAL DATA COLLECTION GUIDELINES
Page 19
UCR CARPORT UNF UNFINISHED CARPORT
yoc CARPORT UD UNFINSREO OETACHED CARPORT
UNFINISHED ENCLOSED PORCH. STRUCTURES THAT IS TIGHT To
UEP UNF ENC PRCH THE WEATHER HOWEVER, HAVING NO INTERIOR FINISH
UFF UNF FIRST FL UNFINISHED FIRST FLOOR
UFL UPPER FLOOR FLOORS ASGVE FOUR
UNFINISHED GARAGE (UNDERGROUND GARAGE) - STRUCTURE
UGR UNFGARAGE LARGE ENOUGH TO HOUSE AUTOMOBILE WITH INTERIOR
FRAMING EXPOSED. (ON CERTAIN PROJECTS USED ON ALL
GARAGES BELOW GROUND LEVEL}
uns UNFHST UNFINISHEO HALF STORY. SAME AS HST. EXCEPT INTERIOR
UNEINISHED
ULP LOADG P/UNF UNFINISHEO LOADING PLATFORM t
UOP OPEN PRCH UN UNFINISHEO OPEN PORCH
LOS UNETOS UNFINISHED TQS
UNFINISHED RAISED BASEMENT. UTILIZED FOR THOSE
URB UNF RSD GH BASEMENTS THAT ARE ONLY PARTICALLY BELOW GRADE
YET STILL UNFINISHEO COMMONLY FQUND ON RAISED
RANCHISPLIT ENTRY ANG SPLIT LEVEL TYPE HOMES
USP UNF SCR PRCH UNFINISHED SCREEN PORCH
uUS UNFUP STRY UNFINISHED UPPER STORY
VST VESTIBULE VESTIBULE
WOK WOOD DECK AN OPEN FLOOR WITH NO ROOF. USUALLY WOOD
WOF WHSE OFFICE WHAREHOUSE OFFICE SECTION

SPECIAL FEATURES/Y ARD ITEMS

See attached table for codes.

@ Verifp or fill in Quality

A Average

D Very Poor

E Excellent

F Fair

G Good

P Poor

¥ Very Good

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P85

Board Of Aldermen - Agenda - 7/14/2020 - P86

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH
2019-2022 REVALUATION

RESIDENTIAL BATA CGLLECTION GUIDELINES
Page 20

a Merify or fill in Condition

AV | Average
DL | Delanitalted
EX | Excellent
FR | Fair

GD | Good

PR | Poor

VG | Very Good
VP {| Very Poor

® Year leave as is, Use given year if picking up new.

Bezeription Full Description

AIR CONDITIO
AUTOMA

COMMBTHHSE COMM 8TH HSE GOOD

SAFE DEPOSIT BOX
. BARN - 1.0 STORY
LOSTYWIBS 1

L POLE BARN
TlH HOUSE/C
WIPLUMBING
CABANA POOL CABANA
CABIN-MINIBA
&

CENTRALVAG
CLEAN ROOMS CLEAN ROOMS
COOLER
F FREEZER
CANOPY-AVG

RES CONDO Si

TWR P

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P86

Board Of Aldermen - Agenda - 7/14/2020 - P87

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH
2019-2022 REVALUATION

RESIDENTIAL DATA COLLECTION GUIDELINES
Page 21

Description Full Description
ADDITIONAL ARRAY ADDITIONAL ARRAY

CELLULRTWR
CELLULRTWR
CELL TWRRF

DOCKS-RES TY

DEERWOOD PAD
DRIVEN THE

DORMER
DRIVE

WIPNEUTUBE

El

ELEV PASS EL
ELEV PASS RY
ELEV HANOI-L

CARPORT
FIRE ESCAPE
FOUNOATIONIE

FLUE-CONCRET

FENCE-5' CHA

- CHA

CHA
WIOTOPRAIL
WIiOTOPRAIL

WIOTOPRAIL
FOUNDA

CELLULR IWR 100-125°
CELL IWR 50-99"
ROOF MOUNTEO

DEERWOOD PAD

DRIVE-IN

DRIVE-IN THEATRE

DORMER

ORIVE-UP

ORIVE UP WINDOW WIDE BAY

ORIVE JREM SCR &
ELEV FRT c. LG
ELEV PASS ELEC PYSTP

ELEV PASS HYO PISTP
ELEV 1ST

FIRE ESCAPE

“AVE

WILOFT-AVG
WL
EXTRA SPACE IN PARKING GARAGE
BRICK
FENCE-4' CHAIN
RAIL-10°
FENCE-5' CHAIN
W/0 TOP RAIL-4°
W/0 TOP RAIL-3'
Wid TOP RAIL-8
ON COMMERCIAL

FOUNDATION
HOUSE

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P87

Board Of Aldermen - Agenda - 7/14/2020 - P88

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH
2019-2022 REVALUATION

RESIDENTIAL DATA COLLECTION GUIDELINES

2 STORY CHIN

EXTRA FPL OP
SCRPORCH
GAZESO
TOR
GENERA FORC
LT 1
We

i
HONGRNPAQ2
HONGRNFAOS
HOG HOUSE
HOT TUB
HEARTH
HOT TUB

IMPLEMENT SH
JACUZZI
KNIGHTS BR
KENNEL-AVG
KENNEL-GOOD
IN-LAW KITCH

PHOTO 800TH
LOADING DOCK
LOAD LEVELER
WIM ANFLIPO
LIFT-LIGHT
LIFT-HEAVY

LEAN-TO

LIGHTS-IN

WITRIPLE UG

FIREPLACE
FIREPLACE 1 STY CHIM
1.5 ST

FIREPLACE-GAS
FPL OPENING

GAZEBO

OR COMMERCIAL

GIR

GIROERS 13"-18"
GIRQERS 49*-24"
GIROERS OVER 24°

GR
co
PLASTIC
HANDICAP LIFT 7
LiFT 2

HOT TUB
HEARTH
HOT TUS

IMPLEMENT

JACUZZI

KNIGHTS BRIOGE PAD SITE
KENNEL-AVG
KENANEL-GOOD

IN-LAW KITCHEN
KIOSK-SERV STA
PHOTO BOOTH
LOADING DOCK
LOAD LEVELERS
WIMAN FLIP OUT

LIFT-HEAVY

LIGHTS-IN WIPOLE

WDOUBLE
WITRIPLE

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P88

Board Of Aldermen - Agenda - 7/14/2020 - P89

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH
2019-2022 REVALUATION

RESIDENTIAL DATA COLLECTION GUIDELINES

LT12 WIFQUR LIGHT WIFOUR LIGHTS
LT2 WIDOQUBLE LIG PVIQOUBLE LIGH'S
LT3 WITRIPLE LG MTRIPLE LIGHTS
LT4 WiFOUR LIGHT WIFOUR LIGHTS
LTS MERC VAP/FLU MERC VAPIFLU WIPOLE
LTS WODOUBLE LIG WIDGUBLE LIGHTS
Li? WITRIPLE LIG WITRIPLELIGHS
LTB WIFQUR LIGHT W'FOQUR LIGHTS
LT? HGH PRE-D00 HGH PRE-SOD WIPOLE
MEZt MEZZANINE-UN MEZZANINE-UNFINISHED
MEZ2 MEZZANINE-FIN MEZZANINE-FINISHED
MEZ3 WIPARTITIONS WIPARTITIONS
MISC MISC FEATURE MISC FEATURE
MLK MILK HOUSE MILK HOUSE
MN MANUAL MANUAL
MPD MILLSTH PAD MILLSTONE PAD SITE
MPO4 MILLSTN PADT MILLSTONE PAD SITE PURCHASED
Noe NITE DEPOSIT NIGHT DEPOSIT
OBFN GUTBLEG AN OUTBLOGE FIN INT
OPF OPEN PORCH OPEN FRAME @ORCH
PATI PATIO-AVG PATIO-AVG
PAT2 PATIO-GOOD PATIO-GOOD
PAVI PAVING-ASPHA PAVING-ASPHALT
PAV2 PAVING-CONCR PAVING-CONCRETE
PCT PADOLEBALL GC PACDLEBALL COURT
PO POOL DECK POOL DECK
PLTI POULTRY HOUS POULTRY HOUSE-1 STY
PLT2 POULTRY HOUS POULTRY HOUSE-2 STY
PLT3 POULTRY HOUS POULTRY HOUSE-3 STY
PMP 4 PUMPS-SINGLE PUMPS-SINGLE HSE
PMP2 WIBLENDING WIBLENOING
PMP3 Electronic P Electronic Pump
PMP4 Double Hose DOUBLE HOSE
PMPS WiBlesding WIBLEN DING
PMPS ELECTRONIC P ELECTRONIC PUMP
PMPT 3 HOSE 3 HOSE
PMPS GHOSE 6HOSE
PSPD Presaott Sq Prescott Square
PAR RIOING ARENA RIDING ARENA
RCL ROOT CELLAR ROOT GELLAR
RETW RETAIN WALL RETAINING WALL
ROW RT OF WAY UTILITY RIGHT OF WAY
ROT RAQUETBALL RAQUETBALL COURT
RRMB RECROOMS REC ROOM B GRADE
RRMC RECROOMC REC ROOM C GRADE
RRA RAILROAD SPU RAILROAD SPURS
RYTt RADIOTOWER RADIO TOWER 140° +

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P89

Board Of Aldermen - Agenda - 7/14/2020 - P90

By dnadmin on Sun, 11/06/2022 - 23:08
Document Date
Fri, 07/10/2020 - 15:59
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 07/14/2020 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__071420…

NASHUA NH

2019-2022 REVALUATION
RESIDENTIAL BATA COLLECTION GUIDELINES

Page 24
RT2 RADIOTOWER RADIO TOWER 125-15¢'
RT3 RADIOTOWER RADIO TOWER 100-125"
RT4 RADIOTOWER RADIO TOWER 80-99"
RTS RAGIOTOWER RADIO TOWER - AM
SAU SAUNA SAUNA
SCui SCALES-MECHA SCALES -MEGHANICAL
SCL2 SCALES-ELECT SCALES-ELECTRONIC
SGN1 SIGN-1 SIOE SIGN-1 SIDEVWIH
SGN2 QGUBLE SIDED GOUBLE SIOEO Wiki
SGN3 WIINT LIGHTS WHINT LIGHTS
SONS WIMOTORELE WIMOTOR & LIGHTS
SHO1 SHED FRAME SHED FRAME
SHO2 WILIGHTSETC SHED WAIGHTS ETC
SHDI METAI. SHED METAL
SHo4 CONCRETE UTI SHED CONCRETE UTILITY
SHES PLASTIC PLASTIC SHEOS
SHEO SHED SHED
SHP1 WORKSHOPAV WORK SHOP AVE
SHP2 WORKSHOP GO WORK SHOP GOOD
SHP3 WORKSHOP PR WORK SHOP POOR
SHP4 WIMPROV AVG WIIMPROV AVG
SHPS WAMPROV GO WiIMPROV GOOB
SHPS WIMPROV PR WIMPROV POOR
$iO1 SILO-WOD ORC SILG-WD OR CNG STAVE
SLO2 PORCELAN PORCELAN
SLO3 CONCRETE TRE CONCRETE TRENCH
SERi SOLAR HEATS SOLAR HEAT SYSTEM
SLR? SOLARHOTWA SOLAR HOT WATER SYST
SLRG SOLAR HEAT& SOLAR HEAT & WATER
SLR PASSIVE SOLA PASSIVE SOLAR GOOD
SiRS PASSIVE SOLA PASSIVE SOLAR FAIR
SLRG SOLARELEC SOLAR VOLTAIC
SNA SAUNA SAUNA
SPLi POOL-INGROUND CONC POOL -INGROUND CONCRETE
SPLZ ING POOL VINYL PLASTIC VINYL PLASTIC
SPLI ING POOL GUNITE GUNITE
SPL4 POOL ABOVE GR ROU ABOVE GR ROUND
SPL5 POOL OVAL OVAL ABVE GROUND
SPLO POOL RECTANGULAR RECTANGULAR ABOVE GROUND
SPRt SPRINKLERS IV SPRINKLERS-WETIEXP
SPR2 WETICONCEALE WETICONCEALED
SPR DRY DRY
$71 MOSILEHOME MOBILE HOME SITE 4
$T2 MOBILE HOME MOBILE HOME SITE 2
8T3 MOBILE HOME MOBILEHOME SITE 3
STBi STABLE STABLE
ST62 WAMPROVEMEN WIMPROVEMENTS
STK1 CHIMNEY STAG CHIMNEY STACK BRICK
STkz CHIMNEY STAG CHIMNEY STACK MTL
TEN TENNIS COURT TENNIS COURT
THK! TANK-UNDERGR TANK-UNDERGROUNO
THK 3,000,10,000 3,600-10 000 GAL

Page Image
Board Of Aldermen - Agenda - 7/14/2020 - P90

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 776
  • Page 777
  • Page 778
  • Page 779
  • Current page 780
  • Page 781
  • Page 782
  • Page 783
  • Page 784
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact