Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 29991 - 30000 of 38765

Finance Committee - Agenda - 1/15/2020 - P81

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
81
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

To:

From:

Re:

B. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: December 19, 2019

David L. Boucher, Superintendent
Wastewater Department

20 Year Facility Study - Wastewater

To approve the contract to Wright Pierce to develop and prepare a 20 year Facility
Planning Study for the Wastewater Treatment Facility in an amount not to exceed
$300,000. Funding for this contract will be through Department: 169 Wastewater;
Fund: Wastewater; Activity: Facility Planning Study.

Wright Pierce Scope of Work and Fee Schedule

The Wastewater Treatment Facility is one of the City’s most valuable assets. It
still has original pipes and tanks online that were designed and installed back in
the 1950’s. The City continues to expand and the EPA regulations continue to get
stricter. This study will develop a better understanding of the financial needs of
the Facility in the future, as well as looking at potential design planning needs as
the City’s NPDES permit regulations and the City’s population evolves and
grows.

A request for qualifications was issued in October of 2019 and consultants were
chosen for interview on November 5, 2019 by the selection team. The selection
team, consisting of David Boucher, Superintendent, Noelle Osbome, Plant
Operations Supervisor, William Keating, Wastewater Engineer, Scott Law,
Wastewater Foreman, Matthew Cusato, Wastewater Foreman, and Lauren Byers,
Public Relations Administrator, chose Wright Pierce as the most qualified firm.
The Scope of Work and Fee schedule was submitted, discussed, and agreed upon
as attached.

Page Image
Finance Committee - Agenda - 1/15/2020 - P81

Finance Committee - Agenda - 1/15/2020 - P82

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
82
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

ENGINEERING REPORT PHASE
CONTRACT FOR PROFESSIONAL SERVICES
FOR
TREATMENT WORKS

CITY OF NASHUA, NEW HAMPSHIRE

This AGREEMENT made and entered into at HILLSBOROUGH County, New Hampshire,

this day of 2020, by and between City of NASHUA,
NEW HAMPSHIRE of hereinafter called the OWNER, and WRIGHT-PIERCE hereinafter
called the ENGINEER.

WITNESSETH:

WHEREAS, the OWNER intends to develop and prepare a comprehensive 20 year
Facility Plan for the Nashua Wastewater Treatment Facility. Elements of the plan should

include a comprehensive review of the current and projected future flows, hydraulic

capacity, treatment capacity, process and associated equipment assessment, Facility
infrastructure, identification of potential discharge issues, reliability and redundancy

evaluation and identification of future capital improvement needs.
hereinafter called the PROJECT, and

WHEREAS, professional sanitary engineering services are required to prepare an engineering
report, and
WHEREAS, such services are of a distinct professional nature and hence not subject to the

bidding process,

NOW THEREFORE, in consideration of these premises and of the mutual covenants herein set
forth, the OWNER hereby retains the ENGINEER to furnish the following engineering services in
connection with the proposed PROJECT; and it is agreed by and between the OWNER and the
ENGINEER as follows:

WWTF 20 Year 02/08/06
Facility Plan Study

Page Image
Finance Committee - Agenda - 1/15/2020 - P82

Finance Committee - Agenda - 1/15/2020 - P83

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
83
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

ENGINEERING REPORT PHASE CONTRACT
For Professional Services for Treatment Works

I. Services to be performed by the ENGINEER

A. The ENGINEER agrees to produce a complete
and definitive Engineering Report to meet current
division requirements and to perform any and all
engineering incidental thereto. The detailed scope of
the work is as outlined in the attached as Exhibit A

Plan of Study.

C. Furnish three (3) copies of the Engineering
Report to the OWNER and two (2) copies to the
DIVISION. Additional copies to be available at cost.

D. Prepare applications with supporting and asso-
ciated documents for Federal, State and other grant or

loan programs.

1. Assists the OWNER in securing grants
or loans by State, Federal and other grant or

loan agencies.

E. Provide the DIVISION with one (1) copy of
design calculations, work sheets, field notes, esti-
mates and other data generated in preparing the Engi-
neering Report in-a form satisfactory to the DIVI-

SION.

il. The OWNER'S Responsibilities

A. Assist the ENGINEER by placing at his dis-
posal all available information pertinent to the PRO-
JECT, including previous reports and other data rela-

tive to the reports.

B. Make provisions for the ENGINEER to enter
upon public and private lands, municipal facilities
and industrial establishments as required to perform

work under this AGREEMENT.

Ill. Time of Completion

A. The ENGINEER agrees that he will submit to
the DIVISION and the OWNER for approval after
modification or revision as recommended by the
DIVISION and agreed to by the ENGINEER the
completed report within 335 consecutive calendar
days following the acceptance of the contract by the
OWNER, and deliver same to the OWNER within

WWTF 20 Year
Facility Plan Study

IV.

Page 2 of 4

365 consecutive calendar days following the date of
final approval by the DIVISION.

B. It is agreed by the parties to this contract that
failure by the ENGINEER to complete the work
within the time stipulated under III, A, above may be
considered sufficient basis for the debarment of the
ENGINEER from the DIVISION'S Roster of Preq-
ualified Engineers as provided for under New Hamp-
shire Code of Administrative Rules Env-Wq 603.08,
or the Assessment of liquidated damages as provided
for under RSA 485-A: 4, XH.

Compensation to be Paid the ENGINEER
A. Method of Payment - Amount of Fee

1. | Payment to the ENGINEER, for services
rendered, shall be according to the following
schedule:

Monthly billing based on hours and rates
by labor category with mark-up and
incidental expenses in accordance with
the attached fee schedule.

2. The OWNER agrees to pay and the
ENGINEER agrees to accept for all services
under this AGREEMENT, a fee not to exceed

Three Hundred Thousand Dollars
($ 300,000.00),

and the ENGINEER agrees that the work pro-
posed is sufficient to satisfactorily complete
the study and that the monies to be paid are
adequate. The attached fee schedule with labor
category, hours, hourly rate, markup, incidental
expenses, and fees for special services, shall be
the basis for billing for engineering services.

a. The ENGINEER agrees that prior
to submitting the report to the DIVI-
SION for formal approval he shall make
revisions in the report as recommended
by the DIVISION and agreed to by the
ENGINEER without additional com-
pensation. After formal approval if it be-
comes necessary to update the report for
reasons beyond the control of the ENGI-
NEER, payment for such revision or
revisions shall be made to the ENGI-
NEER on a basis to be negotiated with
the DIVISION.

02/08/06

Page Image
Finance Committee - Agenda - 1/15/2020 - P83

Finance Committee - Agenda - 1/15/2020 - P84

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
84
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

ENGINEERING REPORT PHASE CONTRACT
For Professional Services for Treatment Works

VY. Additional Covenants

A. The ENGINEER agrees to assign in active
charge of this PROJECT for the life of the con-
tract a Project Engineer who is a permanent
employee of the ENGINEER and who a
“qualified sanitary engineer” is as defined
under the DIVISION'S “Rules and Regulations
for the Prequalification of Consulting Engi-
neers.” The Project Engineer shall be*

Jeffrey R. Pinnette, P.E.
Wright-Pierce

11 Bowdoin Mill Island, Suite 140
Topsham, ME 04086

(name and address)

* See appended resume describing the candidate's qualifica-
tions for the assignment.

Any proposed change in identity of the Project
Engineer on the PROJECT shall first be approved by
the DIVISION before transfer of responsibility is
made. Failure of the ENGINEER to abide by the
above covenant is agreed to be sufficient basis for de-
barment of the ENGINEER from the DIVISION'S
Roster of Prequalified Consulting Engineers as pro-
vided for under New Hampshire Code of Administra-
tive Rules Env-Wq 603.08.

B. The ENGINEER agrees to be solely re-
sponsible for all bills or claims for payment for ser-
vices rendered by others and for all services and
materials employed in his work, and to indemnify
and save harmless the OWNER, and all of the
OWNER'S officers, agents and employees against all
suits, claims or liability of every name and nature
arising out of or in consequence of the negligent acts
or failures to act of the ENGINEER or others
employed by him in the performance of the work
covered by this AGREEMENT.

C. The ENGINEER further agrees to procure and
maintain at his expense such workmen's compensa-
tion insurance as is required by the statutes and pub-
lic liability insurance in amounts adequate to provide
reasonable protection from claims for bodily injury,
death or property damage which may result from his
performance and the performance of his employees
under this AGREEMENT.

D. All documents, including original drawings,
design calculations, work sheets, field notes, esti-
mates, and other data shall remain the property of the
OWNER and shall be transmitted to the OWNER in
clean and orderly condition on demand; however,

WWTF 20 Year
Facility Plan Study

Page 3 of 4

these may be left in the possession of the ENGI-
NEER at the OWNER'S discretion.

E. The ENGINEER shall not sublet, assign or
transfer any part of the ENGINEER'S services or
obligations under this AGREEMENT without the
prior approval and written consent of the OWNER
and the DIVISION, and the contract shall be binding
upon and inure to the benefit of the parties, their
successors and assigns.

Vi. Exhibit B - City of Nashua Professional Services
General Terms and Conditions is hereby incorporated
by reference as if fully set forth herein.

IN WITNESS WHEREOF, the parties hereto have affixed
their hand and seals at Hillsborough County, New Hampshire,
the day, month, and year first above written.

ENGINEER:
WRIGHT-PIERCE

By:

(Authorized Representative*)

Date:

OWNER:
CITY OF NASHUA, NEW HAMPSHIRE

By:

(Authorized Representative*)

Date:

APPROVED: **

DEPARTMENT OF ENVIRONMENTAL SERVICES
Water Division

By:

(Authorized Representative)

Date:

Signatures should be supported by appropriate document.

ft is agreed that as an act in furtherance of its statutory authority
to approve engineering agreements for treatment works, the
DIVISION's approval does not impose any contractual obligation
or liability on the State of New Hampshire, the Department of
Environmental Services or the Division.

me

02/08/06

Page Image
Finance Committee - Agenda - 1/15/2020 - P84

Finance Committee - Agenda - 1/15/2020 - P85

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

Page 4 of 4

WRIG HT- P J E RC E A WATER ~ WASTEWATER ~ STORMWATER ~ INFRASTRUCTURE

Engineering a Better Environment

WRIGHT-PEERCE
CERTIFICATE OF VOTE
I], Ryan T. Wingard, hereby certify that I am the duly elected Clerk of Wright-Pierce.

I certify that the following is a true copy of a vote taken at a meeting of the board of directors of the
corporation, duly called and held on April 3, 2019. at which a quorum of the board was present and
voting.

VOTED:

That any one or all of the following officers of Wright-Pierce, on behalf of the corporation, are
authorized to execute all Wright-Pierce contracts, both service agreements and general contractual
obligations:

John W. Braccio. President/CEO

Paul F. Birkel, Vice President

Richard N. Davee, Vice President
Walter J. Flanagan III, Vice President
Michael D. Giggey, Vice President
Steven C. Hallowell, Vice President
John R. Nelson, Vice President/Treasurer/CFO
Christopher N. Pierce, Vice President
Richard G. Protasowicki, Vice President
Timothy R. Vadney. Vice President
Ryan T. Wingard, Vice President/Clerk

I hereby certify that said vote has not been amended or repealed and remains in full force and effect.
Attest:

Zi bo—

Ryan T. Wingard. Clerk

Seal

Date: O30
Recognized for Engineering Excellence ~ Selected for Service & Value 75 Washington Avenue, Suite 202
www.wright-pierce.com Partland, ME 04101

Phone: 207.761.2991 [ Fax: 207.761.2978

Page Image
Finance Committee - Agenda - 1/15/2020 - P85

Finance Committee - Agenda - 1/15/2020 - P86

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

COST OR PRICE SUMMARY FORMAT FOR SUBAGREEMENTS UNDER NH SAG & SRF Form Approved
DES 02/06
PART I - GENERAL
1, GRANTEE / LOANEE 2. GRANT/EGAN NO.
CITY OF NASHUA, NH TBD
3. NAME OF CONTRACTOR OR SUBCONTRACTOR 4. DATE OF PROPOSAL
WRIGHT-PIERCE DECEMBER 10, 2019
5. ADDRESS OF CONTRACTOR OR SUBCONTRACTOR (Include ZiP) 6. TYPE OF SERVICE TO BE FURNISHED
230 COMMERCE WAY, SUITE 302, PORTSMOUTH, NH _ 03801 PROFESSIONAL ENGINEERING
PART II - COST SUMMARY
HOURLY ESTIMATED
7. DIRECT LABOR (Specify labor categories) HOURS RATE COST TOTALS
Principal-in-Charge 46.0 $66.00 $3,036
Project Manager 136.0 $61.00 $8,296
Sr. Technical Advisor 124.0 $66.00 $8,184
Lead Project Engineer 356.0 $42.00 $14,952
Project Engineer 439.0 $36.00 $15,804
Project Engineer 656.0 $28.00 $18,368
Project Engineer - Civil 68.0 $56.00 $3,808
Project Architect 84.0 $45.00 $3,780
Project Engineer - Structural 100.0 $47.00 $4,700
Project Engineer - Mechanical 84.0 $44.00 $3,696
Project Engineer - Instrument. 100.0 $45.00 $4,500
Project Engineer - Electrical 100.0 $65.00 $6,500
Process Designer $2.0 $29.00 $1,508
GIS 8.0 $42.00 $336
Admin Assistant 48.0 $24.00 $1,152
DIRECT LABOR TOTAL:
ESTIMATED
8. INDIRECT COSTS (Specify indirect cost pools) RATE X BASE = COST
167.49 $98,620 ns!
INDIRECT COSTS TOTAL: $165,179
9. OTHER DIRECT COSTS Bee
a. TRAVEL ESTIMATED
COST
(1) TRANSPORTATION $2,600
(2) PER DIEM
TRAVEL COSTS TOTAL: $2,600
b. EQUIPMENT, MATERIALS, SUPPLIES ESTIMATED
(Specify categories) QTY COST COST
EQUIPMENT SUBTOTAL: $0
c. SUBCONTRACTS ESTIMATED
COST
Outside Lab $7,500
SUBCONTRACTS SUBTOTAL: te ‘ $7,500
d. OTHER (Specify categories) ESTIMATED
COST
OTHER SUBTOTAL: $0
e. OTHER DIRECT COSTS TOTAL: a $10,100
10. TOTAL ESTIMATED COST $273,899
11. PROFIT $26,101
12. TOTAL PRICE $300,000

**Profit not permitted by City of Nashua on all Other Direct Costs, including subcontractors,
Page | of 2

Page Image
Finance Committee - Agenda - 1/15/2020 - P86

Finance Committee - Agenda - 1/15/2020 - P87

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
87
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

PART III - PRICE SUMMARY

COMPETITOR'S CATALOG LISTINGS, IN-HOUSE ESTIMATES, PRIOR QUOTES
13. (Indicate basis for price comparison)

MARKET
PRICE (S)

PROPOSED
PRICE

PART IV - DIRECT LABOR BY CATEGORY

SERVICES, ETC.

14. INSERT THE APPROPRIATE WORK CATEGORY IN THE TABLE BELOW. WORK CATEGORIES WOULD INCLUDE BUT
NOT BE LIMITED TO THOSE CATEGORIES SHOWN IN THE CONTRACT DOCUMENTS SUCH AS DESIGN, SURVEY,
SUBSURFACE, CADASTRAL, O&M MANUAL, ADMINISTRATION, INSPECTION, RECORD DWGS, START-UP, SPECIAL

TASKS
TOTAL | RATE COST

A |Bilc!]eElFEIiGoIitHi:r{]si4«Ki{L iI urs
Principal-in-Charge 4 |2o}2]01]o0}4}]21o0}4 ]}]10l 0] 46 $66 $3,036
Project Manager 4 1/48] 8 | 28 | 201 41]0] 0] 12] 12] 0 136 $61 $8.296
Sr. Technical Advisor

8 16 | 8 | 4 | 28] 8 | 4] 24] 12 | 12] 0 124 $66 $8,184
Lead Project Engineer

36 | 48|36] 60 | 84} 414 ]12} 24 140] 8 356 $42 $14,952
Project Engineer

8 0 | 43 | 104 | 108/16] 8 | 96] 16 | 40] 0 439 $36 $15,804
Project Engineer

20 | 60 | 96} 144 | 164] 16] 8 | 24} 36 | 76] 12 | 656 $28 $18,368
Project Engineer - Civil

0 o1|o]241401lololo}]4]o] 0 68 $56 $3,808
Project Architect 8

0 o1o]32 |}4,}o0]o0/41]0]0/] 0 4 $45 $3,780
Project Engineer -
Structural 0 o1ol]4s | 4aa}o!loj;o0]4]ol o 100 $47 $4,700
Project Engineer -
Mechanical 0 o}o] 32 |48}o0/o0lo0j}4 ]o}] o 84 $44 $3,696
Project Engineer —
Instrument. 0 o}|o]4s |4aal}ol/o0j1o0]4]ol o 100 $45 $4,500
Project Engineer -
Electrical 0 o}o] 4s |4a}oj/o0}o0]4]{o] 0 100 $65 $6,500
Process Designer

0 0}]0]24}]20/o0/o0]1o0]8 | o} o 52 $29 $1,508
GIS

0 ofo!loj}olflolojlo]ol|tsio 8 $42 $336
Admin. Assistant 8

4 0 0 281 0 4 $24 $1,152

$98,620

Page 2 of 2

Page Image
Finance Committee - Agenda - 1/15/2020 - P87

Finance Committee - Agenda - 1/15/2020 - P88

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
88
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

Education
M.S., Civil Engineering,
University of Maine

B.S., Environmental
Engineering, Rensselaer
Polytechnic Institute

Professional Registration
Maine

Massachusetts

New Hampshire

Experience
33 Years

Joined Firm
1987

Professional Affiliations
New England Water
Environment Association

New Hampshire Water
Pollution Contro! Association

Maine Wastewater Control
Association

Water Environment
Federation

New England Biosolids and
Residual Association

International Association on
Water Quality

Publications

Denis, B.M., Pinnette, J.R.
Tobiason, D.F., McNeil, F,
and Robertson, R.
“Manchester, New
Hampshire, Retools lts
Aeration System for the Next
Generation” NEWEA Journal,
Summer 2017.

WRIGHT-PIERCE ==

Engineering a Hetles Environment

Jeffrey Pinnette, PE

SENIOR PROJECT MANAGER
Project Assignment: Senior Project Manager

Experience Summary

Mr. Pinnette is a senior project manager at Wright-Pierce with a strong background
in wastewater treatment, residuals management and odor control. He currently
manages projects for the city of Nashua, New Hampshire; the city of Manchester,
New Hampshire; the city of Keene, New Hampshire; the Winnipesaukee River Basin
Program in Franklin, New Hampshire; the town of Pepperell, Massachusetts; the city
of Fitchburg, Massachusetts; the South Essex Sewerage District in Salem,
Massachusetts; the Kennebec Sanitary Treatment District in Waterville, Maine; and
the Lewiston-Auburn Water Pollution Control Authority in Lewiston, Maine. He has
authored numerous articles on wastewater treatment, residual management, and
odor control including the biofiltration and biotrickling filter sections in "TR-16:
Guides for the Design of Wastewater Treatment Works," published by the New
England interstate Water Pollution Control Commission.

Relevani Project Experience

Wastewater Treatment

« Process Operations Review and Optimization, South Essex Sewerage District,
Salem, MA

« Primary Clarifier Upgrade, Nashua, NH

« WWTF Upgrade, Pepperell, MA

» Secondary System Upgrade, Fitchburg, MA

« Local Limits Evaluation, Fitchburg, MA

« Asset Management Program Development, Winnipesaukee River Basin
Program, NH

e HVAC Upgrade, Nashua, NH

e« Headworks Screening Upgrade, Nashua, NH

e Industrial Impacts Evaluation at Rockland WWTF, Rockland, ME

« Main Electrical Upgrade at Franklin WWTF, Winnipesaukee River Basin
Program, NH

« Aeration System Upgrade, Manchester, NH

» Asset Management Program Development, Fitchburg, MA

« Update of Standard Operating Procedures at Nashua WWTF, Nashua, NH

» Wastewater Equipment Replacement Fund Update for Nashua WWTF,
Nashua, NH

« Capital and Debt Cost Allocation among Member Communities, Greater
Lawrence Sanitary District, North Andover, MA
Facility Plan Update, South Portland, ME

* Chelsea Screen House, Dewberry / Massachusetts Water Resources Authority,
Chelsea, MA

Page Image
Finance Committee - Agenda - 1/15/2020 - P88

Finance Committee - Agenda - 1/15/2020 - P89

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
89
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

Hankins, W.D., Richardson,
C.M, Tobiason, D.F., Eames,
F., and Pinnette, J.R.,
“Mitigating Wet Weather
and Filamentous Bacterial
Issues at the Lewistan-
Auburn WWITF", WEFTEC,
New Orleans, Louisiana,
2004

Hogan, R.S., Garcia, M.M.,
Pinnette, J.R., and Thayer,
M.W., “Energy Self
Sufficiency for New Biosolids
Digestion and Drying
Facilities," Biocycle, July 2003

Goodwin, J. P., Amenta, S.
A.R., Delo, C., Bel Vecchio,
M., Pinnette, J.R., and Pytiar,
T.S., "Odor Control Advances
at CoComposting Facility,"
Biocycle, January 2000

Ohr, K., Pinnette, J.R., and
Rasmussen, @., “Organic
Residuals Management in
Norway”, Biocycle,
December 1998

Tvedt, S., Moe, M., Pinnette,
J.R., and Rasmussen, @.,
“Xristainsand Leads the Way
in Biowaste Composting”,
Biocycle December 1998

Segall, L., and Pinnette, 1.R.,
"Dewatering and Composting
Septage Solids", BioCycle,
March 1995

Giggey, M.D., Pinnette, J.R.,
and Dwinal, C.A., "Odor
Control Factors in Compost
Site Selection", BioCycle,
February 1995

Richardson, C.M., Giggey,
M.D., Pinnette, J.R. and
DeFilipp, P.A., “Performance
Testing of an Agitated Bin
Composting System
Constructed Under Design-
Build Procurement",
Proceedings, American
Water Works Association,
December 5-8, 1993

WeriGutT-Prerce =

Eoginecring a Setter Enviranment

Jeffrey Pinnette, PE

Facility Plan Update and Energy Audit, Greater Augusta Utility District,
Augusta, ME

Grit Removal Upgrade, Nashua, NH

Primary and Aeration System Improvements, Greater Lawrence Sanitary District,
North Andover, MA

CEPT and Interim Phosphorus Removal, Fitchburg, MA

POTW Optimization Study, Fitcjhburg, MA

Wet Weather Facility Upgrade, South Portland, ME

WWTF Improvemenis, Plymouth, NH

Facility Plan Amendment, Woonsocket, RI

Energy Audit and Physical Asset Evaluation, Biddeford, ME

Secondary System Evaluation, Greater Lawrence Sanitary District,

North Andover, MA

Secondary System Capacity Improvements, Fitchburg, MA

New Headworks Facilities, Fitchburg, MA

Preliminary Design of WWTF Capacity Improvements, Kennebec Sanitary
Treatment District, Waterville, ME

WWTFE Capacity Evaluation, Kennebec Sanitary Treatment District,

Waterville, ME

WWYTEFE Capacity Evaluation, Rockland, ME

WWTF Capacity Evaluation, Lewiston-Auburn Water Pollution Control Authority,
Lewiston, ME

Value Engineering of Headworks and Secondary System Upgrades,

Norwalk, CT

Evaluation of Buy-in Fee, Greater Lawrence Sanitary District,

North Andover, MA

WWTF Blower Control Design, Bangor, ME

WWTEF Improvements for CSO Abatement, Greater Lawrence Sanitary District,
North Andover, MA

Facility Plan Evaluation, Plymouth, NH

Aeration System Blowers, Lewiston-Auburn Waiter Pollution Control Authority,
Lewiston, ME

Wet Weather Flow Capacity, Lewiston-Auburn Water Pollution Control
Authority, Lewiston, ME

Capital Improvement Plan, Yarmouth, ME

WWTF Upgrade, Manchester-by-the-Sea, MA

WWTP Preliminary Design Report, Stonington, CT

Activated Sludge Secondary Treatment System Upgrade, Lewiston-Auburn Water
Pollution Control Authority, Lewiston, ME

WWTP Phase Il Improvements, Quonset Point, RI

Westerly WWTP Expansion, Marlborough, MA

New Variable Speed Drives and Blowers, Metropolitan District Commission,
Hartford, CT

Page Image
Finance Committee - Agenda - 1/15/2020 - P89

Finance Committee - Agenda - 1/15/2020 - P90

By dnadmin on Mon, 11/07/2022 - 13:34
Document Date
Fri, 01/10/2020 - 11:24
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 01/15/2020 - 00:00
Page Number
90
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__011520…

Richardson, C.M., Donovan,
J.F., Durfee, D.D., and
Pinnette, J.R., "Agitated Bin
Composting From
Procurement to Start-Up",
BioCycle, November 1993

Giggey, M.D., Marcy, G.J.,
Pinnette, J.R. and St. Hillaire,
G.,"Start-Up of a Large
Advanced Septage
Treatment Facility",
Proceedings, American
Water Works Association,
December 5-8, 1993

Pinnette, J.R., Giggey, M.D.,
Hendry, G.E. and Richardson,
C.M., “Moisture Balance of
an Open Biofilter", Compost
Science & Utilization, Spring
1993

Pinnette, J.R., "Modeling the
Removal of Radon - 222 from
Domestic Groundwater
Supplies Using Granular
Activated Carbon", Master's
Thesis, University of Maine,
February 1986

Presentations

Pinnette, 5.R., “Odor Control
for Wastewater Utilities,”
MWUA Annual Trade Show,
Portland, Maine, February 8,
2017

Pinnette, J.R., “Value
Engineering: What Projects
Need it, Why It’s Important,
When to Start the Process,
and How To Do It,” MeWEA
Spring Conference, Bangor,
Maine, Aoril 15, 2016

Capano, D.E. and J.R.
Pinnette, “Case Study:
Evaluation and Corrective
Action at the Stamford
WPCF” NEWEA Annual
Conference, Boston, January
27, 2016

Pinnette, J.R., and Cockburn,
D.L., “Planning for Climate
Change at Your Wastewater

WriGHtT-PrERCE ==

Enginecring 4 Better Envirunment

Jeffrey Pinnetie, PE

Sludge Handling and Dewatering

Dewatering System Upgrades, Keene, NH

Dewatering System and Siloxane Removal Upgrades, Lewiston-Auburn Water
Pollution Control Authority, Lewiston, ME

Anaerobic Digester Heating Evaluation, Winnipesaukee River Basin

Program, NH

Anaerobic Digester Mixer Replacement, Nashua, NH

Dewatering System Improvements, Nashua, NH

Sludge Pumping Facilities, Lewiston-Auburn Water Pollution Control Authority,
Lewiston, ME

Phase | Centrifuge Dewatering Improvements, Manchester, NH

Solids Handling Master Plan, Manchester, NH

Sludge Handling Evaluation, Torrington, CT

Dewatering Evaluation, Nashua, NH

Sludge Disposal Study, Somersworth, NH

Sludge Stabilization Evaluation, Natal, Brazil

Sludge Handling Evaluation, Lebanon, NH

Sludge Management Cost Review, EPA

Pump Stations / Collection System

Mechanical Bar Rack Replacement at Beverly Pump Station, South Essex
Sewerage District, Salem, MA

Flow Metering, Winnipesaukee River Basin Program, NH

Tenney Mountain Pump Station #4, Force Main Evaluation, and Phase 1 and 2
Upgrades, Plymouth, NH

Fairground Road Sewer Settlement Evaluation and Upgrade, Plymouth, NH
Maiden Lady Cove Pump Station Force Main Evaluation, Winnipesaukee River
Basin Program, Franklin, NH

Pump Stations Replacement and SCADA/Telemetry Upgrade, Manchester, NH
City-wide Pump Station Evaluation, Manchester, NH

Crescent Road Pump Station, Manchester, NH

West Side Pump Station, Manchester, NH

India Street Pump Station, Portland, ME

Water and Sewer Utilities, Chatham, MA

Submersible Pump Stations, Lisbon, ME

Flow Metering Data Analysis, Boston, MA

Combined Sewer Overflow / Stormwater

Combined Sewer Overflow Master Plan, Kennebec Sanitary Treatment District,
Waterville, ME

WWITF Capacity Evaluation, Greater Lawrence Sanitary District, North
Andover, MA

Stormwater Management Plan, Burlington, MA

Page Image
Finance Committee - Agenda - 1/15/2020 - P90

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2996
  • Page 2997
  • Page 2998
  • Page 2999
  • Current page 3000
  • Page 3001
  • Page 3002
  • Page 3003
  • Page 3004
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact