Richardson, C.M., Donovan,
J.F., Durfee, D.D., and
Pinnette, J.R., "Agitated Bin
Composting From
Procurement to Start-Up",
BioCycle, November 1993
Giggey, M.D., Marcy, G.J.,
Pinnette, J.R. and St. Hillaire,
G.,"Start-Up of a Large
Advanced Septage
Treatment Facility",
Proceedings, American
Water Works Association,
December 5-8, 1993
Pinnette, J.R., Giggey, M.D.,
Hendry, G.E. and Richardson,
C.M., “Moisture Balance of
an Open Biofilter", Compost
Science & Utilization, Spring
1993
Pinnette, J.R., "Modeling the
Removal of Radon - 222 from
Domestic Groundwater
Supplies Using Granular
Activated Carbon", Master's
Thesis, University of Maine,
February 1986
Presentations
Pinnette, 5.R., “Odor Control
for Wastewater Utilities,”
MWUA Annual Trade Show,
Portland, Maine, February 8,
2017
Pinnette, J.R., “Value
Engineering: What Projects
Need it, Why It’s Important,
When to Start the Process,
and How To Do It,” MeWEA
Spring Conference, Bangor,
Maine, Aoril 15, 2016
Capano, D.E. and J.R.
Pinnette, “Case Study:
Evaluation and Corrective
Action at the Stamford
WPCF” NEWEA Annual
Conference, Boston, January
27, 2016
Pinnette, J.R., and Cockburn,
D.L., “Planning for Climate
Change at Your Wastewater
WriGHtT-PrERCE ==
Enginecring 4 Better Envirunment
Jeffrey Pinnetie, PE
Sludge Handling and Dewatering
Dewatering System Upgrades, Keene, NH
Dewatering System and Siloxane Removal Upgrades, Lewiston-Auburn Water
Pollution Control Authority, Lewiston, ME
Anaerobic Digester Heating Evaluation, Winnipesaukee River Basin
Program, NH
Anaerobic Digester Mixer Replacement, Nashua, NH
Dewatering System Improvements, Nashua, NH
Sludge Pumping Facilities, Lewiston-Auburn Water Pollution Control Authority,
Lewiston, ME
Phase | Centrifuge Dewatering Improvements, Manchester, NH
Solids Handling Master Plan, Manchester, NH
Sludge Handling Evaluation, Torrington, CT
Dewatering Evaluation, Nashua, NH
Sludge Disposal Study, Somersworth, NH
Sludge Stabilization Evaluation, Natal, Brazil
Sludge Handling Evaluation, Lebanon, NH
Sludge Management Cost Review, EPA
Pump Stations / Collection System
Mechanical Bar Rack Replacement at Beverly Pump Station, South Essex
Sewerage District, Salem, MA
Flow Metering, Winnipesaukee River Basin Program, NH
Tenney Mountain Pump Station #4, Force Main Evaluation, and Phase 1 and 2
Upgrades, Plymouth, NH
Fairground Road Sewer Settlement Evaluation and Upgrade, Plymouth, NH
Maiden Lady Cove Pump Station Force Main Evaluation, Winnipesaukee River
Basin Program, Franklin, NH
Pump Stations Replacement and SCADA/Telemetry Upgrade, Manchester, NH
City-wide Pump Station Evaluation, Manchester, NH
Crescent Road Pump Station, Manchester, NH
West Side Pump Station, Manchester, NH
India Street Pump Station, Portland, ME
Water and Sewer Utilities, Chatham, MA
Submersible Pump Stations, Lisbon, ME
Flow Metering Data Analysis, Boston, MA
Combined Sewer Overflow / Stormwater
Combined Sewer Overflow Master Plan, Kennebec Sanitary Treatment District,
Waterville, ME
WWITF Capacity Evaluation, Greater Lawrence Sanitary District, North
Andover, MA
Stormwater Management Plan, Burlington, MA
