Hankins, W.D., Richardson,
C.M, Tobiason, D.F., Eames,
F., and Pinnette, J.R.,
“Mitigating Wet Weather
and Filamentous Bacterial
Issues at the Lewistan-
Auburn WWITF", WEFTEC,
New Orleans, Louisiana,
2004
Hogan, R.S., Garcia, M.M.,
Pinnette, J.R., and Thayer,
M.W., “Energy Self
Sufficiency for New Biosolids
Digestion and Drying
Facilities," Biocycle, July 2003
Goodwin, J. P., Amenta, S.
A.R., Delo, C., Bel Vecchio,
M., Pinnette, J.R., and Pytiar,
T.S., "Odor Control Advances
at CoComposting Facility,"
Biocycle, January 2000
Ohr, K., Pinnette, J.R., and
Rasmussen, @., “Organic
Residuals Management in
Norway”, Biocycle,
December 1998
Tvedt, S., Moe, M., Pinnette,
J.R., and Rasmussen, @.,
“Xristainsand Leads the Way
in Biowaste Composting”,
Biocycle December 1998
Segall, L., and Pinnette, 1.R.,
"Dewatering and Composting
Septage Solids", BioCycle,
March 1995
Giggey, M.D., Pinnette, J.R.,
and Dwinal, C.A., "Odor
Control Factors in Compost
Site Selection", BioCycle,
February 1995
Richardson, C.M., Giggey,
M.D., Pinnette, J.R. and
DeFilipp, P.A., “Performance
Testing of an Agitated Bin
Composting System
Constructed Under Design-
Build Procurement",
Proceedings, American
Water Works Association,
December 5-8, 1993
WeriGutT-Prerce =
Eoginecring a Setter Enviranment
Jeffrey Pinnette, PE
Facility Plan Update and Energy Audit, Greater Augusta Utility District,
Augusta, ME
Grit Removal Upgrade, Nashua, NH
Primary and Aeration System Improvements, Greater Lawrence Sanitary District,
North Andover, MA
CEPT and Interim Phosphorus Removal, Fitchburg, MA
POTW Optimization Study, Fitcjhburg, MA
Wet Weather Facility Upgrade, South Portland, ME
WWTF Improvemenis, Plymouth, NH
Facility Plan Amendment, Woonsocket, RI
Energy Audit and Physical Asset Evaluation, Biddeford, ME
Secondary System Evaluation, Greater Lawrence Sanitary District,
North Andover, MA
Secondary System Capacity Improvements, Fitchburg, MA
New Headworks Facilities, Fitchburg, MA
Preliminary Design of WWTF Capacity Improvements, Kennebec Sanitary
Treatment District, Waterville, ME
WWTFE Capacity Evaluation, Kennebec Sanitary Treatment District,
Waterville, ME
WWYTEFE Capacity Evaluation, Rockland, ME
WWTF Capacity Evaluation, Lewiston-Auburn Water Pollution Control Authority,
Lewiston, ME
Value Engineering of Headworks and Secondary System Upgrades,
Norwalk, CT
Evaluation of Buy-in Fee, Greater Lawrence Sanitary District,
North Andover, MA
WWTF Blower Control Design, Bangor, ME
WWTEF Improvements for CSO Abatement, Greater Lawrence Sanitary District,
North Andover, MA
Facility Plan Evaluation, Plymouth, NH
Aeration System Blowers, Lewiston-Auburn Waiter Pollution Control Authority,
Lewiston, ME
Wet Weather Flow Capacity, Lewiston-Auburn Water Pollution Control
Authority, Lewiston, ME
Capital Improvement Plan, Yarmouth, ME
WWTF Upgrade, Manchester-by-the-Sea, MA
WWTP Preliminary Design Report, Stonington, CT
Activated Sludge Secondary Treatment System Upgrade, Lewiston-Auburn Water
Pollution Control Authority, Lewiston, ME
WWTP Phase Il Improvements, Quonset Point, RI
Westerly WWTP Expansion, Marlborough, MA
New Variable Speed Drives and Blowers, Metropolitan District Commission,
Hartford, CT
