01200-2
PROJECT MEETINGS

subcontractors. The Engineer will advise other interested parties and request their
attendance.
Minimum agenda: Distribute data on, and discuss:

1.

2.

Nn Y&

oo

10.

Identification of key project personnel for Owner, Engineer, Contractor,
funding/regulatory Agencies.

Responsibilities of Owner, Engineer, Resident Project Representative,
Contractor.

Channels and procedures for communications.

Construction schedule, including sequence of critical work.

Finance Committee - Agenda - 6/7/2017 - P451

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P451

01200-1
SECTION 01200

PROJECT MEETINGS

PART 1 - GENERAL

1.1

1.2

1.3

DESCRIPTION

A. Work Included: To enable orderly review during progress of the work, and to
provide for systematic discussion of problems, the Engineer will conduct project
meetings throughout the construction period.

Finance Committee - Agenda - 6/7/2017 - P450

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P450

OLIS0A-5
MEASUREMENT AND PAYMENT

Item (4) Bid Alternate C — Control Building Lobby Offices Ductless Split System

A. Method of Measurement: Lump Sum.

B. Basis of Payment: Payment of the lump sum price for Item (4) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Lobby Offices Ductless Split System, complete as indicated on the
Drawings and as specified and all its' appurtenances in its entirety.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P449

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P449

O1150A-4
MEASUREMENT AND PAYMENT

29. Weather protection

30. Permits not otherwise paid for or provided by the Owner

31. Visits to the Project site or elsewhere by personnel or agents of the Contractor,
including manufacturer's representatives, as may be required

32. On-site and other facilities acceptable to Engineer for the storage of materials,
supplies and equipment to be incorporated into the Work

33. Facilities start-up services required by the Contract Documents

34. Mobilization/demobilization

Finance Committee - Agenda - 6/7/2017 - P448

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P448

1.8

01150A-3
MEASUREMENT AND PAYMENT

INCIDENTAL WORK
Incidental work items for which separate payment is not made include (but are not
limited to) the following items:

A.

1.

OC PANDMAEYWN

11.
12.
13.
14.
15.

16.
17.
18.

19.

20.
21.
22.
23.
24.

25.

26.

27.
28.

Clearing, grubbing and stripping

Dust control

Dewatering

Clean-up

Erosion control

Finance Committee - Agenda - 6/7/2017 - P447

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P447

1.3

1.4

1.5

1.6

1.7

O1150A-2
MEASUREMENT AND PAYMENT

encountered during the prosecution of the Work and until its final acceptance by the
Engineer, and for all risks of every description connected with the prosecution of
the work, except as provided herein, also for all expenses incurred in consequence
of the suspension of the work as herein authorized.

Finance Committee - Agenda - 6/7/2017 - P446

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P446

O1150A-1
SECTION 01150A

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 DESCRIPTION

A.

For lump sum items, payment shall be made to the Contractor in accordance with
an accepted Progress Schedule and Schedule of Values on the basis of actual work
completed.

For unit-price items, payment shall be based on the actual amount of work accepted

and for the actual amount of materials in place, as shown by the final

measurements.

Finance Committee - Agenda - 6/7/2017 - P445

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P445

01100-2
ALTERNATES

including but not limited to section 15671 and all associated controls and electrical gear,
piping and appurtenances for a fully functioning HVAC system.

2.4 BID ALTERNATE C
This alternate shall consist of furnishing and installing the new Control Building Lobby
Offices Ductless Split System as shown on the drawings and specified herein, including
but not limited to section 15671 and all associated controls and electrical gear, piping
and appurtenances for a fully functioning HVAC system.

PART 3 - EXECUTION

Finance Committee - Agenda - 6/7/2017 - P444

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P444

01100-1
SECTION 01100

ALTERNATES

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included:

1. Each Bidder shall be held fully responsible for examining the scope of the

Alternates generally defined herein and for recognizing any modifications to his

work caused by any Alternate

B. Alternate:

1. To enable the Owner to compare total costs where alternate materials and
methods might be used, an Alternate has been established as described in this
Section of these Specifications.

Finance Committee - Agenda - 6/7/2017 - P443

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P443

fps
ft.
gal.
gpd
gpm

IBR

in.
inter.
ISA
kva

kw

lb.
max.
MCB
MGD
Min.
NBS
NEC
NEMA
NEWWA
NPT
OS&Y
PCA
ppm

%

psi
psig
PVC
rpm
RUS
sf.
STL. W.G.

S.y.
TDH
USAS

USS GAGE
VC

WSP

Fed. Spec.

01070-2
ABBREVIATIONS & SYMBOLS

Feet Per Second

Feet

Gallons

Gallons Per Day

Gallons Per Minute

Horsepower