Finance Committee - Agenda - 6/7/2017 - P462

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P462

01340-3
SUBMITTALS

the Owner, shall do all work necessary to make such modifications.

Finance Committee - Agenda - 6/7/2017 - P461

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P461

01340-2
SUBMITTALS

Finance Committee - Agenda - 6/7/2017 - P460

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P460

01340-1
SECTION 01340

SUBMITTALS

PART 1 - GENERAL

1.1 DESCRIPTION

A.

B.

Work Included:

1. Submit to the Engineer, Shop Drawings, Operation and Maintenance Manuals,
Manufacturers' Certificates, Project Data, and Samples required by the
Specification Sections.

Related Work Specified Elsewhere:

1. Construction Schedules: Section 01310

2. Project Record Documents: Section 01720

3. General Conditions: Section C.

1.2 SHOP DRAWINGS

A.

Finance Committee - Agenda - 6/7/2017 - P459

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P459

01320-5
SAFETY AND HEALTH PLAN

TABLE 3
NASHUA WASTEWATER TREATMENT FACILITY
CHEMICAL HAZARD LISTING

Location Chemical Hazard
. er Sodium Hypochlorite, Sodium Bisulfite,
Operations Building Sodium Hydroxide, Hydrogen Peroxide

Note: This list has been provided by the Owner based upon their knowledge of the site and may
not include all site hazards. Its intent is to aid the Contractor in determining the magnitude of
effort needed to fulfill the safety and health requirements of this Contract.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P458

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P458

01320-4
SAFETY AND HEALTH PLAN

1.4 SITE-SPECIFIC INFORMATION
A. <A copy of the City of Nashua, New Hampshire Wastewater Treatment Facility

Confined Space Entry Program is included in Appendix A of these specifications.
B. Refer to Tables 1, 2 and 3 below.

TABLE 1

NASHUA WASTEWATER TREATMENT FACILITY
CONFINED SPACE LISTING

Confined Space Location

Hazard Description

Influent Channels

Possible lack of oxygen or presence of explosive or
hazardous gases - Hydrogen Sulfide.

Finance Committee - Agenda - 6/7/2017 - P457

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P457

01320-3
SAFETY AND HEALTH PLAN

subcontractors working in these areas have received appropriate training and
are properly equipped in accordance with Contractor's Safety and Health Plan.
Updating:
1. Contractor shall be responsible for updating the Safety and Health Plan as
appropriate throughout the course of the construction period.

1.2 SUBMITTALS

A.

Finance Committee - Agenda - 6/7/2017 - P456

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P456

01320-2
SAFETY AND HEALTH PLAN

execution of this Contract. Spaces listed as Permit Required Confined
Space may only be entered with a permit, alternate procedures
(1910.146 (c) (5)), or reclassification to non-permit required confined
space (1910.146 (c) (7)). The Contractor is required to perform a site
evaluation to identify all hazards and potential hazards in work areas
whether included in Table 1 or not, prior to control of site.

Finance Committee - Agenda - 6/7/2017 - P455

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P455

01320-1

SECTION 01320

SAFETY AND HEALTH PLAN

PART 1 - GENERAL

1.1

DESCRIPTION
A. Work Included:

1.

The Contractor shall be solely responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the work,
as outlined herein and in the General and Special Conditions of the Contract
Documents. Within (10) days after the effective date of the Agreement
between Owner and Contractor, submit to the Engineer a Safety and Health
Plan as specified herein.

Finance Committee - Agenda - 6/7/2017 - P454

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P454

01310-2
CONSTRUCTION SCHEDULES

4. Provide narrative report, including:

a. Discussion of problem areas, including current and anticipated delay
factors.

b. Corrective action taken, or proposed.
c. Description of revisions that may affect schedules.

1.2 SUBMITTALS
A. Submit updated schedules with each progress payment request.
B. Submit 4 copies of initial and updated schedules to the Engineer.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P453

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P453

01310-1

SECTION 01310

CONSTRUCTION SCHEDULES

PART 1 - GENERAL

1.1 DESCRIPTION

A.