01100-2
ALTERNATES
including but not limited to section 15671 and all associated controls and electrical gear,
piping and appurtenances for a fully functioning HVAC system.
2.4 BID ALTERNATE C
This alternate shall consist of furnishing and installing the new Control Building Lobby
Offices Ductless Split System as shown on the drawings and specified herein, including
but not limited to section 15671 and all associated controls and electrical gear, piping
and appurtenances for a fully functioning HVAC system.
PART 3 - EXECUTION
3.1 ADVANCE COORDINATION
A. Immediately after award of the Contract, or as soon thereafter as the Owner has
made a decision on whether the Alternate will be selected, thoroughly and clearly
advise all necessary personnel and suppliers as to the nature and extent of
Alternates selected by the Owner. Use all means necessary to alert those personnel
and suppliers involved as to all changes in the work caused by the Owner's
selection or rejection of the Alternate.
END OF SECTION
13089K