O1150A-4
MEASUREMENT AND PAYMENT
29. Weather protection
30. Permits not otherwise paid for or provided by the Owner
31. Visits to the Project site or elsewhere by personnel or agents of the Contractor,
including manufacturer's representatives, as may be required
32. On-site and other facilities acceptable to Engineer for the storage of materials,
supplies and equipment to be incorporated into the Work
33. Facilities start-up services required by the Contract Documents
34. Mobilization/demobilization
35. Test pits to determine existing utility locations and elevations, soils
conditions, groundwater conditions, dewatering requirements and as required
to complete the project
36. Engineer's temporary field office
37. Pipe markings
38. Pavement markings
39. Removal of existing pavement
40. Earthwork (except ledge)
41. Preconstruction photos and videos
42. Construction administration and insurance
1.9 DESCRIPTION OF PAY ITEMS
A. The following sections describe the measurement of and payment for the work to be
done under the respective items listed in the Bid Form.
B. Each unit or lump sum price stated in the Bid Form shall constitute full
compensation, as herein specified, for each item of the work completed.
Item (1) HVAC Upgrade Project.
A. Method of Measurement: Lump Sum
B. Basis of Payment: Payment for the lump sum price for Item (1) shall be full
compensation for furnishing all labor, materials, tools and equipment required and for
upgrading of the HVAC facilities, complete as indicated on the Drawings and as speci-
fied and all its’ appurtenances in its entirety, except that work included for payment under
items 2 thru 4.
Item (2) Bid Alternate A — Control Building Boiler Room Make Up Air Unit
A. Method of Measurement: Lump Sum.
B. Basis of Payment: Payment of the lump sum price for Item (2) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Boiler Room Make Up Air Unit, complete as indicated on the Drawings
and as specified and all its’ appurtenances in its entirety.
Item (3) Bid Alternate B — Control Building Electric Room Ductless Split System
A. Method of Measurement: Lump Sum.
B. Basis of Payment: Payment of the lump sum price for Item (3) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Electric Room Ductless Split System, complete as indicated on the
Drawings and as specified and all its' appurtenances in its entirety.
13089K