Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 6/7/2017 - P449

Finance Committee - Agenda - 6/7/2017 - P449

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
449
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

O1150A-4
MEASUREMENT AND PAYMENT

29. Weather protection

30. Permits not otherwise paid for or provided by the Owner

31. Visits to the Project site or elsewhere by personnel or agents of the Contractor,
including manufacturer's representatives, as may be required

32. On-site and other facilities acceptable to Engineer for the storage of materials,
supplies and equipment to be incorporated into the Work

33. Facilities start-up services required by the Contract Documents

34. Mobilization/demobilization

35. Test pits to determine existing utility locations and elevations, soils
conditions, groundwater conditions, dewatering requirements and as required
to complete the project

36. Engineer's temporary field office

37. Pipe markings

38. Pavement markings

39. Removal of existing pavement

40. Earthwork (except ledge)

41. Preconstruction photos and videos

42. Construction administration and insurance

1.9 DESCRIPTION OF PAY ITEMS
A. The following sections describe the measurement of and payment for the work to be
done under the respective items listed in the Bid Form.
B. Each unit or lump sum price stated in the Bid Form shall constitute full
compensation, as herein specified, for each item of the work completed.

Item (1) HVAC Upgrade Project.
A. Method of Measurement: Lump Sum
B. Basis of Payment: Payment for the lump sum price for Item (1) shall be full
compensation for furnishing all labor, materials, tools and equipment required and for
upgrading of the HVAC facilities, complete as indicated on the Drawings and as speci-
fied and all its’ appurtenances in its entirety, except that work included for payment under
items 2 thru 4.

Item (2) Bid Alternate A — Control Building Boiler Room Make Up Air Unit

A. Method of Measurement: Lump Sum.

B. Basis of Payment: Payment of the lump sum price for Item (2) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Boiler Room Make Up Air Unit, complete as indicated on the Drawings
and as specified and all its’ appurtenances in its entirety.

Item (3) Bid Alternate B — Control Building Electric Room Ductless Split System

A. Method of Measurement: Lump Sum.

B. Basis of Payment: Payment of the lump sum price for Item (3) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Electric Room Ductless Split System, complete as indicated on the
Drawings and as specified and all its' appurtenances in its entirety.

13089K