01100-1
SECTION 01100
ALTERNATES
PART 1 - GENERAL
1.1 DESCRIPTION
A. Work Included:
1. Each Bidder shall be held fully responsible for examining the scope of the
Alternates generally defined herein and for recognizing any modifications to his
work caused by any Alternate
B. Alternate:
1. To enable the Owner to compare total costs where alternate materials and
methods might be used, an Alternate has been established as described in this
Section of these Specifications.
C. Related Work Specified Elsewhere:
1. Materials and methods to be used in the Base Bid and in the Alternate have
been described on the DRAWINGS and in pertinent Sections of these
Specifications. The Alternate descriptions provided in Part 2 below list out
the major Specification Sections included under the specific Alternates, but do
not include all the Specification Sections of the associated appurtenances.
2. Method for stating the proposed Contract Sum is described in the Bid Form.
D. Submittals:
1. All Alternates described in this Section are required to be reflected on the Bid
Form as submitted by bidders. However, do not submit alternates other than
as described in this Section, except as provided for "substitutions" under the
General Conditions.
PART 2 - PRODUCTS
2.1 PRODUCT HANDLING
A. If the Owner elects to proceed on the basis of one or more of the described
Alternatives, make all modifications to the Work required in furnishing and
installing the selected Alternative or Alternatives to the approval of the Engineer
and at no additional cost to the Owner other than as proposed on the Bid Form.
2.2 BID ALTERNATE A
This alternate shall consist of the demolition of the existing and furnishing and
installing the new Control Building Room Boiler Room Make Up Air unit as shown on
the drawings and specified herein, including but not limited to section 15619 and all
associated controls and electrical gear, piping and appurtenances for a fully functioning
heating and ventilation system.
2.3 BID ALTERNATE B
This alternate shall consist of furnishing and installing the new Control Building
Electrical Room Ductless Split System as shown on the drawings and specified herein,
13089K