PART 1 - GENERAL

1.1 DESCRIPTION
A.

01070-1

SECTION 01070

ABBREVIATIONS & SYMBOLS

Where any of the following abbreviations are used in these Specifications, they
shall have the meaning set forth opposite each.

AASHTO
AC

ACI

ACP
AGA
AIC
AGMA

ATEE(IEEE)

AISC
amp

Amer. Std.

ANSI
API

ASA
ASCE
ASHRAE

Finance Committee - Agenda - 6/7/2017 - P441

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P441

01050-2
COORDINATION

coordinate their work with the instrumentation supplier by providing operating
sequences, input/out specifications with wiring diagrams for all equipment, and that
they shall review and comment on each others shop drawings to insure that all
interfaces are compatible.

1.3 CONTRACTOR'S USE OF PREMISES

A. Contractor shall have use of the premises within the limits shown on the Drawings
and as defined in the General Conditions for the performance of the Work and
Section 01010a — Summary of Work.

Finance Committee - Agenda - 6/7/2017 - P440

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P440

01050-1
SECTION 01050

COORDINATION

PART 1 - GENERAL

1.1 DESCRIPTION

A.

Contractor is required to work in close proximity to Owner's existing facilities. The
Contractor, under this Contract, will be responsible for coordinating construction
activities with Owner to ensure that services, facilities, and safe working conditions
are maintained.

Finance Committee - Agenda - 6/7/2017 - P439

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P439

3.4

3.5

01045-3
CUTTING, CORING AND PATCHING

Provide protection for existing equipment, utilities and critical areas against water
or other damage caused by drilling operation.

Slurry or tailings resulting from coring operations shall be vacuumed or otherwise
removed from the area following drilling. Slurry or tailings shall not be allowed to
enter floor drains.

Work area (e.g., adjacent walls, floors, ceilings, pipes, conduits, etc.) shall be
cleaned to remove splash residues from coring operation.

CUTTING

Finance Committee - Agenda - 6/7/2017 - P438

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P438

01045-2
CUTTING, CORING AND PATCHING

PART 3 - EXECUTION

Finance Committee - Agenda - 6/7/2017 - P437

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P437

01045-1
SECTION 01045

CUTTING, CORING AND PATCHING

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included - This section establishes general requirements pertaining to cutting,
excavating, coring, fitting, and patching of the Work required to:

1. Make alterations to existing structures.

2. Make the parts fit properly.

3. Replace work not conforming to requirements of the Contract Documents.

Finance Committee - Agenda - 6/7/2017 - P436

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P436

O01010A-4
SUMMARY OF WORK

shall be accomplished in strict accordance with applicable codes and standards and
the stricter of the Contractor's or Owner’s lock-out/tag-out procedures.

The Contractor shall have all materials and equipment on-site, and shall receive the
Owner's approval, prior to initiating work which will disrupt the facilities thermal
comfort and indoor air quality in occupied spaces.

Finance Committee - Agenda - 6/7/2017 - P435

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P435

3.2

O1010A-3
SUMMARY OF WORK

5. | The Contractor shall limit his personnel to the proposed work areas and limits
of work.

B. — Construction access.

1. Free open space around the Control Building is limited. As directed by the
Owner, the Contractor may use the temporary parking lot, for construction
trailers, employee parking, material storage and lay down. The Contractor
shall install fencing around the staging area.

Finance Committee - Agenda - 6/7/2017 - P434

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P434

O1010A-2
SUMMARY OF WORK

e. Other appurtenances as shown on the Drawings and specified herein.
4. Remove and/or relocate equipment as indicated on the Drawings.
B. Related Work Specified Elsewhere:

1. Coordination: Section 01050

2. Construction Schedules: Section 01310.
C. Removals, Relocations and Rearrangements

Finance Committee - Agenda - 6/7/2017 - P433

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P433

PART 1 - GENERAL

1.1 DESCRIPTION

OLO10A-1

SECTION O1010A
SUMMARY OF WORK

A. Work Included: Upgrading the City of Nashua, New Hampshire Headwork’s
Facilities at the main Wastewater Treatment Facility (WWTF). The major
proposed work under this Contract includes:

Construction of:

1.

a.

b.
C.

Se Os TART eo moe

mead

e

Sludge Processing Building Pump Room Air Handling Unit (SAHU-
1A),

Pagination

  • Previous page ‹‹
  • Page 1405
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact