Finance Committee - Agenda - 5/17/2017 - P306

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P306

Summary of workforce by disciplines, and a notarized statement documenting that
all proposed workers, by name, have received all required medicals and have been
properly trained in asbestos removal work, respirator use, and appropriate State of
New Hampshire, EPA & OSHA standards. The Contractor shall submit to the
Engineer the following items at least three days prior to individual workers being
allowed to work on the project (Submittal #2B):

Finance Committee - Agenda - 5/17/2017 - P305

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P305

1.04

44. Wet Cleaning: The process of eliminating Asbestos contamination from
underground utilities and other surfaces and objects by using cloths, mops, or
other cleaning utensils which have been dampened with amended water or diluted
removal encapsulant and afterwards thoroughly decontaminated or disposed of as
Asbestos contaminated waste.

Finance Committee - Agenda - 5/17/2017 - P304

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P304

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

Non-friable Asbestos Containing Material: Asbestos-Containing Material that
cannot be crumbled, pulverized or reduced to powder by hand pressure.

Project Designer: An individual who has successfully completed the training
requirements for an abatement Project Designer established by 40 CFR 763.

Finance Committee - Agenda - 5/17/2017 - P303

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P303

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

Encapsulant: A material that surrounds or embeds Asbestos fibers in an adhesive
matrix, to prevent release of fibers.

Fixed Items: Equipment, furniture, radiators, or other objects which cannot be
removed from the Work Area.

Friable Asbestos-Containing Material: Asbestos-Containing Material that can be
crumbled, pulverized, or reduced to powder by hand pressure.

Finance Committee - Agenda - 5/17/2017 - P302

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P302

14.

15.

16.

17.

18.

19.

20.

21.

22.

Class II Asbestos Work: Activities involving the removal of ACM which ts not
thermal system insulation or surfacing material. This includes, but 1s not limited
to the removal of Asbestos-Containing wallboard, floor tile and sheeting, roofing
and siding shingles, and construction mastics.

Finance Committee - Agenda - 5/17/2017 - P301

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P301

10.

11.

12.

13.

Amended Water or Wetting Agent: Water to which a surfactant has been added
in proportion of at least one ounce surfactant to five gallons water.

Finance Committee - Agenda - 5/17/2017 - P300

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P300

1.02

1.03

4. Decontaminate and remove all equipment used to perform the Work.

5. Segregate and properly dispose of all contaminated and non-contaminated waste
material.
6. Provide personal protective equipment and decontamination facilities for all

Asbestos Abatement Contractor personnel.

The Contractor shall ensure proper completion of all Waste Shipment Records (WSR) in
accordance with all applicable regulations.

RELATED WORK

Measurement and Payment is included in Section 01270.

Finance Committee - Agenda - 5/17/2017 - P299

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P299

The Contractor shall retain the services of an Asbestos Abatement Contractor to respond
to the unexpected discovery of ACM within the Contract Limits. The Asbestos
Abatement Contractor shall perform removal and disposal in accordance with the
Contractor's work schedule unless the condition of the asbestos-containing material
presents a hazard to the general public or the environment in which case the Asbestos
Abatement Contractor shall perform removal within 24 hours of identification of said

Finance Committee - Agenda - 5/17/2017 - P298

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P298

SECTION 02111

REMOVAL OF UNDOCUMENTED ASBESTOS FROM UNDERGROUND UTILITIES

PART 1 GENERAL
1.01 SCOPE OF WORK

THE CONTRACTOR IS ADVISED THAT DEFINITIONS USED HEREIN MAY BE
MORE STRINGENT THAN REGULATORY AND OR INDUSTRY STANDARD.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO CAREFULLY REVIEW ALL
PORTIONS OF THE SPECIFICATIONS TO PROPERLY EXECUTE THE WORK.

Finance Committee - Agenda - 5/17/2017 - P297

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P297

L. — As soon as possible after the pipe and manholes are completed on any street, the Contractor
shall flush out the new pipeline using a rubber ball ahead of the water, and none of the
flushing water or debris shall be permitted to enter any existing sewer.

3.02 QUALITY ASSURANCE
A. CLEANING, INSPECTION, AND TESTING:

1. On completion of a section of sewer, the Contractor shall TV inspect the main section in
accordance with Section 02441, Cleaning, Television Inspection, and Testing of
New Pipelines at no additional cost to the Owner.