Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 5/17/2017 - P316

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P316

The Contractor shall ensure that a "Competent Person" conduct an exposure
assessment immediately before, or at the initiation of work to determine expected
exposures during the work in accordance with 29 CFR 1926.1101. For Class I
and Class II Asbestos Work, until the Contractor conducts exposure monitoring
and documents that workers on the job will not be exposed in excess of the
Permissible Exposure Limit (PEL), or otherwise makes a Negative Initial
Exposure Assessment, the Contractor shall assume that workers are exposed in

Finance Committee - Agenda - 5/17/2017 - P315

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P315

1.10

1.11

Finance Committee - Agenda - 5/17/2017 - P314

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P314

1.08

1.09

a. Fundamentals Governing the Design and Operation of Local Exhaust
Systems, ANSI Publication Z9.2-79

b. Practices for Respiratory Protection, ANSI Publication Z288.2-80
NOTIFICATIONS, PERMITS, AND LICENSES

Finance Committee - Agenda - 5/17/2017 - P313

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P313

3. U.S. Department of Transportation, Title 49, Parts 172 and 173:

C. State of New Hampshire Requirements which govern asbestos abatement and removal
work or hauling and disposal of asbestos waste materials include the following:

1. Asbestos Management Control Act (NH RSA (Revised Statutes Annotated) Ch.
141-B),

Asbestos Management Rules (NH Administrative Rules Ch. He-P 5000),

Solid Waste Management Act (NH RSA Ch. 149-M),

Hazardous Waste Management Act (NH RSA Ch. 147-A),

Finance Committee - Agenda - 5/17/2017 - P312

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P312

1.07

13. Equipment or system tests and start-ups.
14. Partial Completions, occupancies.
15. Substantial Completions authorized.

Daily Log: For all Work specified in this Section, the Contractor shall maintain within
the decontamination facility a daily log documenting the dates and time of the following
items, including, but not limited to:

Finance Committee - Agenda - 5/17/2017 - P311

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P311

1.06

information. When such events are known or predictable in advance,
advise the Engineer in advance at earliest possible date.

Finance Committee - Agenda - 5/17/2017 - P310

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P310

projects including work practices, protective measures for building and
personnel, disposal procedures, and other related work. This person shall
generally remain outside the Work Area, except for daily checks on the
quality and progress of Work, and be available to the Department and the
Engineer at all times while Work is in progress.

Finance Committee - Agenda - 5/17/2017 - P309

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P309

12.

13.

14.

the disposal facility is permitted to and will accept various ACM and or
Asbestos-Contaminated Waste Material specified in this Section.

Respiratory Protection Program: Submit level of respiratory protection intended
for each operation required by the Project (Submittal #12).

Finance Committee - Agenda - 5/17/2017 - P308

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P308

10.

11.

Summary of proposed materials and equipment (manufacturer, catalog number or
model, and description) and method of application or use, including but not
limited to encapsulants, wetting agents, personal protective equipment, and test
samples of all proposed materials for performing the Work. This includes, but 1s
not limited to copies of DOP certifications for negative air machines in
accordance with Subsection 2.02.A of this Section (Submittal #6).

Finance Committee - Agenda - 5/17/2017 - P307

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P307

service, property owner of record, contractor, and nearest hospital posted at the
job site. The plan, at a minimum, must contain:

e A clear description of the project to be undertaken. Description should
include location, amount and type/types of asbestos material to be dealt with,
any site-specific conditions, and the anticipated start and finish dates.

e Identification of entity that will be performing the asbestos abatement

activities. The name of the project supervisor, copies of licenses, training

Pagination

  • Previous page ‹‹
  • Page 1347
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact