Finance Committee - Agenda - 7/5/2018 - P177
a
4)
(
“pps
ire PERCH
Mt. Tom Power Generation Station — Turbo-Sorb Initial Compliance (Key
Operator: 2009)
Worked on the team to commission the new Turbo-Sorb System. My role was
the onsite mercury analyst. | collected the stack gas on the carbon tubes then
using the Ohio-Lummex analyzed the tubes to report the mercury concentrations.
New England Power Plants, FTIR —- Ammonia — NE (Key Operator: 2001 -
2011)