projects including work practices, protective measures for building and
personnel, disposal procedures, and other related work. This person shall
generally remain outside the Work Area, except for daily checks on the
quality and progress of Work, and be available to the Department and the
Engineer at all times while Work is in progress.

Finance Committee - Agenda - 5/17/2017 - P309

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P309

12.

13.

14.

the disposal facility is permitted to and will accept various ACM and or
Asbestos-Contaminated Waste Material specified in this Section.

Respiratory Protection Program: Submit level of respiratory protection intended
for each operation required by the Project (Submittal #12).

Finance Committee - Agenda - 5/17/2017 - P308

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P308

10.

11.

Summary of proposed materials and equipment (manufacturer, catalog number or
model, and description) and method of application or use, including but not
limited to encapsulants, wetting agents, personal protective equipment, and test
samples of all proposed materials for performing the Work. This includes, but 1s
not limited to copies of DOP certifications for negative air machines in
accordance with Subsection 2.02.A of this Section (Submittal #6).

Finance Committee - Agenda - 5/17/2017 - P307

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P307

service, property owner of record, contractor, and nearest hospital posted at the
job site. The plan, at a minimum, must contain:

e A clear description of the project to be undertaken. Description should
include location, amount and type/types of asbestos material to be dealt with,
any site-specific conditions, and the anticipated start and finish dates.

e Identification of entity that will be performing the asbestos abatement

activities. The name of the project supervisor, copies of licenses, training

Finance Committee - Agenda - 5/17/2017 - P306

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P306

Summary of workforce by disciplines, and a notarized statement documenting that
all proposed workers, by name, have received all required medicals and have been
properly trained in asbestos removal work, respirator use, and appropriate State of
New Hampshire, EPA & OSHA standards. The Contractor shall submit to the
Engineer the following items at least three days prior to individual workers being
allowed to work on the project (Submittal #2B):

Finance Committee - Agenda - 5/17/2017 - P305

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P305

1.04

44. Wet Cleaning: The process of eliminating Asbestos contamination from
underground utilities and other surfaces and objects by using cloths, mops, or
other cleaning utensils which have been dampened with amended water or diluted
removal encapsulant and afterwards thoroughly decontaminated or disposed of as
Asbestos contaminated waste.

Finance Committee - Agenda - 5/17/2017 - P304

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P304

34.

35.

36.

37.

38.

39.

40.

41.

42.

43.

Non-friable Asbestos Containing Material: Asbestos-Containing Material that
cannot be crumbled, pulverized or reduced to powder by hand pressure.

Project Designer: An individual who has successfully completed the training
requirements for an abatement Project Designer established by 40 CFR 763.

Finance Committee - Agenda - 5/17/2017 - P303

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P303

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

Encapsulant: A material that surrounds or embeds Asbestos fibers in an adhesive
matrix, to prevent release of fibers.

Fixed Items: Equipment, furniture, radiators, or other objects which cannot be
removed from the Work Area.

Friable Asbestos-Containing Material: Asbestos-Containing Material that can be
crumbled, pulverized, or reduced to powder by hand pressure.

Finance Committee - Agenda - 5/17/2017 - P302

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P302

14.

15.

16.

17.

18.

19.

20.

21.

22.

Class II Asbestos Work: Activities involving the removal of ACM which ts not
thermal system insulation or surfacing material. This includes, but 1s not limited
to the removal of Asbestos-Containing wallboard, floor tile and sheeting, roofing
and siding shingles, and construction mastics.

Finance Committee - Agenda - 5/17/2017 - P301

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P301

10.

11.

12.

13.

Amended Water or Wetting Agent: Water to which a surfactant has been added
in proportion of at least one ounce surfactant to five gallons water.