Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/17/2017 - P320

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P320

2.02

Damaged or deteriorated materials may not be used and must be promptly removed from
the premises. Material which becomes contaminated with asbestos-containing material
shall be packaged and legally disposed of in an approved, secure landfill.

All materials, tools, and equipment must comply, at a minimum, with this Specification,
and relevant federal, state, and local codes.

MATERIALS, TOOLS, AND EQUIPMENT

Finance Committee - Agenda - 5/17/2017 - P319

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P319

1.13

Fire Extinguishers: The Contractor shall locate comply with the applicable
recommendation of NFPA Standard 10 "Standard For Portable Fire Extinguishers." The
Contractor shall locate fire extinguishers where they are most convenient and effective
for their intended purpose, but provide no less than one extinguisher in each Work Area,
in Equipment Room, and one outside Work Area in Clean Room.

PERSONNEL PROTECTION

The Contractor shall provide personnel protection as required by all applicable
regulations.

Finance Committee - Agenda - 5/17/2017 - P318

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P318

grounded temporary electric power service and distribution system of sufficient size,
capacity, and power characteristics to accommodate performance of work during the
construction period. The Contractor shall install temporary lighting adequate to provide
sufficient illumination for safe work and traffic conditions in every area of Work.

1. Temporary Power: Provide service to Decontamination Unit of suitable size and
capacity to accommodate all electrical equipment required for completion of the
Work.

Finance Committee - Agenda - 5/17/2017 - P317

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P317

this monitoring. Assign no other duties to this individual which will take this
person away from monitoring the air system.

Finance Committee - Agenda - 5/17/2017 - P316

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P316

The Contractor shall ensure that a "Competent Person" conduct an exposure
assessment immediately before, or at the initiation of work to determine expected
exposures during the work in accordance with 29 CFR 1926.1101. For Class I
and Class II Asbestos Work, until the Contractor conducts exposure monitoring
and documents that workers on the job will not be exposed in excess of the
Permissible Exposure Limit (PEL), or otherwise makes a Negative Initial
Exposure Assessment, the Contractor shall assume that workers are exposed in

Finance Committee - Agenda - 5/17/2017 - P315

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P315

1.10

1.11

Finance Committee - Agenda - 5/17/2017 - P314

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P314

1.08

1.09

a. Fundamentals Governing the Design and Operation of Local Exhaust
Systems, ANSI Publication Z9.2-79

b. Practices for Respiratory Protection, ANSI Publication Z288.2-80
NOTIFICATIONS, PERMITS, AND LICENSES

Finance Committee - Agenda - 5/17/2017 - P313

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P313

3. U.S. Department of Transportation, Title 49, Parts 172 and 173:

C. State of New Hampshire Requirements which govern asbestos abatement and removal
work or hauling and disposal of asbestos waste materials include the following:

1. Asbestos Management Control Act (NH RSA (Revised Statutes Annotated) Ch.
141-B),

Asbestos Management Rules (NH Administrative Rules Ch. He-P 5000),

Solid Waste Management Act (NH RSA Ch. 149-M),

Hazardous Waste Management Act (NH RSA Ch. 147-A),

Finance Committee - Agenda - 5/17/2017 - P312

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P312

1.07

13. Equipment or system tests and start-ups.
14. Partial Completions, occupancies.
15. Substantial Completions authorized.

Daily Log: For all Work specified in this Section, the Contractor shall maintain within
the decontamination facility a daily log documenting the dates and time of the following
items, including, but not limited to:

Finance Committee - Agenda - 5/17/2017 - P311

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P311

1.06

information. When such events are known or predictable in advance,
advise the Engineer in advance at earliest possible date.

Pagination

  • Previous page ‹‹
  • Page 1195
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact