Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 8/14/2019 - P71

Finance Committee - Agenda - 8/14/2019 - P71

By dnadmin on Mon, 11/07/2022 - 13:04
Document Date
Fri, 08/09/2019 - 13:48
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/14/2019 - 00:00
Page Number
71
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081420…

ESI
POLILSD s Hayner‘Swanson, Inc.

Civil Engineers/Land Surveyors

Mr. Jason J. Beaudet, P.E., Project Manager July 15, 2019
CMA Engineers, Inc.

1 Sundial Avenue

Suite 510N

Manchester, NH 03103

P- 603-627-0708

C- 603-828-3101

www.cmaengineers.com

RE: PROPOSAL-SURVEYING SERVICES
Heritage Trail East (Formerly B&i4 Railroad)
Main Street to Temple Street
Nashua, NH

Dear Jason,

Hayner/Swanson, Inc. (HSI) is pleased to submit this proposal for surveying
services to CMA Engineers, Inc. (Client) for the above referenced project. It is our
understanding the our work consists of performing a ground survey of approximately
4000 linear feet of proposed rail trail as shown on the attached Exhibit. Furthermore, it
is our understanding that this scope of work and fees, outlined below, will be included in
a formal Contract Agreement to be prepared by the Client and executed by both parties
prior to the commencement of work.

Scope of Work
a SE

TOPOGRAPHIC and RIGHT-OF-WAY SURVEY

A. HSI shall perform on-the-ground topographic survey as directed by the
Client of the area as outlined on Exhibit “A” attached. Topographic survey
will be conducted within the limits of the railroad ROW for the length of
the new path, and additional areas at intersections to support design of
sidewalks, crosswalks, ramps, and pedestrian signals. The services are
limited to location and elevation of surface features (bridge, rails,
drainage culverts, signs, etc., including visible evidence of utilities).
Horizontal Datum shall be NAD83 NH State Plane. The Vertical Datum
shall be NAVD88 US Survey Feet. Work shall be performed for a
proposed 40 scale plan with one (1) foot contours.

B. HSI shall perform the necessary research required to determine the limits
of the former B&M Railroad Right-of Way. The research shail include
research at the City Assessors Office, City Engineering Department,
Hillsborough County Registry of Deeds, NHDOT Bureau of Rail & Transit,
NHDOT ROW, B&M railroad records and NH State Archives. HSI will
locate physical monumentation along the route as to be able to
determine the limits of the Right of Way.

3 Congress St. Nashua, NH 03062 - (603) 883-2057
131 Middlesex Turnpike. Burlington. MA 01803 + (781) 203-1501
www. hayner-swansoncom

Page Image
Finance Committee - Agenda - 8/14/2019 - P71

Footer menu

  • Contact