Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 23841 - 23850 of 38765

Finance Committee - Agenda - 6/7/2017 - P456

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
456
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01320-2
SAFETY AND HEALTH PLAN

execution of this Contract. Spaces listed as Permit Required Confined
Space may only be entered with a permit, alternate procedures
(1910.146 (c) (5)), or reclassification to non-permit required confined
space (1910.146 (c) (7)). The Contractor is required to perform a site
evaluation to identify all hazards and potential hazards in work areas
whether included in Table 1 or not, prior to control of site.

b. The Contractor shall be responsible for all aspects of construction site
safety including development of appropriate confined space entry
procedures. The plan shall include, but not necessarily be limited to, the
following:

e => Definitions

Confined Space Evaluations

Equipment Selection

Confined Space Entry Training Documentation

Permit Required Confined Space Entry Requirements

Testing (Monitoring) and Ventilation

Confined Space Entry Permit Form

Rescue and Emergency Procedures

Emergency Contact Information

c. The Contractor shall inform the Owner and Engineer's representative
whenever work will be performed in a confined space and the permit
space program that the Contractor will follow.

d. The Contractor shall inform the Owner and Engineer's representative of
any hazards confronted or created during entry operations, either
through a briefing or during the entry operation.

e. The Contractor will coordinate entry operations with the Owner when
both Owner personnel and Contractor personnel will be working in or
near permit spaces.

f. The Owner, Engineer, their representatives, independent testing
laboratories and government agencies, when inspecting the site, shall be
supplied by the Contractor proper safety equipment when entry into a
confined space is required.

The Owner has provided Table 2 at the end of this section listing electrically-
classified spaces where the Contractor may be required to carry out work
tasks. The Contractor is required to perform a site evaluation to identify all
hazards and potential hazards in work areas whether included in Table 2 or
not, prior to control of site. Contractor shall implement appropriate safety
precautions and/or construction practices to comply with classification
requirements. Contractor shall ensure that all employees and subcontractors
working in these areas have received appropriate training and are properly
equipped in accordance with Contractor's Safety and Health Plan.

The Owner has provided Table 3 at the end of this section listing chemical

storage and handling spaces where the Contractor may be required to carry out

work tasks. The Contractor is required to perform a site evaluation to identify
all hazards and potential hazards in work areas whether included in Table 2 or
not, prior to control of site. Contractor shall ensure that all employees and

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P456

Finance Committee - Agenda - 6/7/2017 - P457

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
457
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01320-3
SAFETY AND HEALTH PLAN

subcontractors working in these areas have received appropriate training and
are properly equipped in accordance with Contractor's Safety and Health Plan.
Updating:
1. Contractor shall be responsible for updating the Safety and Health Plan as
appropriate throughout the course of the construction period.

1.2 SUBMITTALS

A.

Contractor shall be responsible for all aspects of construction site safety. Provide 3
copies of the Contractor's site specific Safety and Health Plan to the Engineer. The
Safety and Health Plan is provided for information only to inform the Owner,
Engineer (and Resident Project Representative) of the project specific safety
program requirements. The Contractor will overview the plan with the Owner (and
staff), Engineer (and Resident Project Representative) at the beginning of the
project, and subsequently when the safety plan is updated.

Provide updated Safety and Health Plans as necessary during the course of the
project.

Contractor's most current Safety and Health Plan shall be available at the
construction site throughout the construction project.

1.3 ON-SITE COORDINATION MEETINGS

A.

B.

Contractor shall review key aspects of Safety and Health Plan at the Pre-
Construction Meeting, and subsequent on-site safety informational meeting.
Contractor shall report to Engineer and Owner at each progress meeting concerning
compliance with the Safety and Health Plan for the most recent construction period
and new considerations and requirements for the upcoming period.

Contractor shall hold weekly on-site coordination meetings with Resident Project
Representative and Owner to ensure that Owner's staff is aware of key Safety and
Health Plan requirements of the current phase of construction.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P457

Finance Committee - Agenda - 6/7/2017 - P458

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
458
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01320-4
SAFETY AND HEALTH PLAN

1.4 SITE-SPECIFIC INFORMATION
A. <A copy of the City of Nashua, New Hampshire Wastewater Treatment Facility

Confined Space Entry Program is included in Appendix A of these specifications.
B. Refer to Tables 1, 2 and 3 below.

TABLE 1

NASHUA WASTEWATER TREATMENT FACILITY
CONFINED SPACE LISTING

Confined Space Location

Hazard Description

Influent Channels

Possible lack of oxygen or presence of explosive or
hazardous gases - Hydrogen Sulfide.

Primary Clarifier -
Splitter Structure (while on-line)

Possible lack of oxygen or presence of explosive or
hazardous gases - Hydrogen Sulfide.

Sludge Tanks/Septage Receiving
Tanks /Grit Tank

Possible lack of oxygen or presence of explosive or
hazardous gases - Hydrogen Sulfide.

Chlorine Contact Tanks

Non-permit space with appropriate provisions

Gravity Thickener Tanks

Possible lack of oxygen or presence of explosive or
hazardous gases - Hydrogen Sulfide.

Sodium Hypochlorite Tank

Chemical hazards.

Sodium Bisulfite Tank

Chemical hazards.

Note: This list has been provided by the Owner based upon their knowledge of the site and may
not include all site hazards. Its intent is to aid the Contractor in determining the magnitude of
effort needed to fulfill the safety and health requirements of this Contract.

TABLE 2
NASHUA WASTEWATER TREATMENT FACILITY
ELECTRICAL HAZARD LISTING

Location
Headworks Room and Debris Loading Room
3-foot Envelop Around Surface of Raw Influent
Channels, Primary Clarifiers, Primary Effluent
Channels, Aeration Tanks, and Secondary
Clarifiers

Electrical Classification
Class 1, Division 1
Class 1, Division 1

Note: This list has been provided by the Owner based upon their knowledge of the site and may
not include all site hazards. Its intent is to aid the Contractor in determining the magnitude of
effort needed to fulfill the safety and health requirements of this Contract.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P458

Finance Committee - Agenda - 6/7/2017 - P459

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
459
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01320-5
SAFETY AND HEALTH PLAN

TABLE 3
NASHUA WASTEWATER TREATMENT FACILITY
CHEMICAL HAZARD LISTING

Location Chemical Hazard
. er Sodium Hypochlorite, Sodium Bisulfite,
Operations Building Sodium Hydroxide, Hydrogen Peroxide

Note: This list has been provided by the Owner based upon their knowledge of the site and may
not include all site hazards. Its intent is to aid the Contractor in determining the magnitude of
effort needed to fulfill the safety and health requirements of this Contract.

END OF SECTION

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P459

Finance Committee - Agenda - 6/7/2017 - P460

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
460
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-1
SECTION 01340

SUBMITTALS

PART 1 - GENERAL

1.1 DESCRIPTION

A.

B.

Work Included:

1. Submit to the Engineer, Shop Drawings, Operation and Maintenance Manuals,
Manufacturers' Certificates, Project Data, and Samples required by the
Specification Sections.

Related Work Specified Elsewhere:

1. Construction Schedules: Section 01310

2. Project Record Documents: Section 01720

3. General Conditions: Section C.

1.2 SHOP DRAWINGS

A.

Shop Drawings are required for each and every element of the work. Each shop
drawing shall be assigned a number consisting of the Specification Section number
followed by a dash and then a sequential number beginning with 01 (e.g., 16000-
01) for purposes of easy identification. Resubmittals shall include an alphabetic
suffix after the corresponding sequential number (e.g., 16000-01A).

Shop Drawings are generally defined as all fabrication and erection drawings,
diagrams, brochures, schedules, bills of material, manufacturers data, spare parts
lists, and other data prepared by the Contractor, his subcontractors, suppliers, or
manufacturers which illustrate the manufacturer, fabrication, construction, and
installation of the work, or a portion thereof.

The Contractor shall submit to the Engineer one electronic Portable Document
Format (PDF) of Shop Drawings and approved data transmitted using e-mail, File
Transfer Protocol (FTP), or approved submittal sharing software. The electronic
copy of each shop drawing shall contain an electronic table of contents that is
bookmarked for each section of the submittal. The Engineer shall return an
electronic PDF of the shop drawing comments to the Contractor for duplication and
distribution to subcontractors, suppliers and manufacturers. All shop drawing
comments will be summarized on the Submittal Review Form and must be retained
with each submittal electronic PDF. Mandatory hardcopy submissions for specific
submittals, format, and transmission method will be finalized at the Pre-
Construction Meeting.

The Contractor shall submit to the Engineer six record hardcopies of each final
approved Shop Drawing and approved data (for Owner’s, Engineer’s and Field
Representative’s files).

The Contractor shall provide a completed Submittal Certification Form (copy
provided for Contractor's use at the end of this Specification Section) which shall be
attached to every hardcopy and electronic PDF of each shop drawing. Shop
Drawings shall show the principal dimensions, weight, structural and operating
features, space required, clearances, type and/or brand of finish or shop coat, grease
fittings, etc., depending on the subject of the drawing. When it is customary to do

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P460

Finance Committee - Agenda - 6/7/2017 - P461

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
461
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-2
SUBMITTALS

so, when the dimensions are of particular importance, or when so specified, the
drawings shall be certified by the manufacturer or fabricator as correct for the work.
Shop Drawings shall be submitted as a complete package by specification section,
unless otherwise reviewed and approved by the Engineer. It is the intent that all
information, materials and samples associated with each specification section be
included as a single submittal for the Engineer's review. Any deviation from this
requirement, such as submitting miscellaneous metals grouped by structure, shall be
requested in writing with an anticipated shop drawing breakdown/schedule prior to
any associated submittal.

The Contractor shall be responsible for the prompt and timely submittal of all shop
and working drawings so that there shall be no delay to the work due to the absence
of such drawings.

No material or equipment shall be purchased or fabricated especially for the
Contract until the required shop and working drawings have been submitted as
hereinabove provided and reviewed for conformance to the Contract
requirements. All such materials and equipment and the work involved in their
installation or incorporation into the Work shall then be as shown in and
represented by said drawings.

Until the necessary review has been made, the Contractor shall not proceed with
any portion of the work (such as the construction of foundations), the design or
details of which are dependent upon the design or details of work, materials,
equipment or other features for which review is required.

All shop and working drawings shall be submitted to the Engineer by and/or
through the Contractor, who shall be responsible for obtaining shop and working
drawings from his subcontractors and returning reviewed drawings to them. Hard
copies of shop drawings shall be of standardized sizes to enable the Owner to
maintain a permanent record of the submissions. Approved standard sizes shall be:
(a) 24 inches by 36 inches; (b) 11 inches by 17 inches, and (c) 11 inches by 8-1/2
inches. Provision shall be made in preparing the shop drawings to provide a
binding margin on the left hand side of the sheet. Shop drawings submitted other
than as specified herein may be returned for resubmittal without being reviewed.
Only drawings which have been checked and corrected by the fabricator should be
submitted to the Contractor by his subcontractors and vendors. Prior to submitting
drawings to the Engineer, the Contractor shall check thoroughly all such drawings
to satisfy himself that the subject matter thereof conforms to the Drawings and
Specifications in all respects. All drawings which are correct shall be marked with
the date, checker's name, and indication of the Contractor's approval, and then shall
be submitted to the Engineer.

If a shop drawing shows any deviation from the Contract requirements, the
Contractor shall make specific mention of the deviations in his letter of transmittal.
Shop Drawings that contain significant deviations that are not brought to the
attention of the Engineer may be subject to rejection.

Should the Contractor submit equipment that requires modifications to the
structures, piping, electrical conduit, wires and appurtenances, layout, etc., detailed
on the Drawings, he shall also submit details of the proposed modifications. If such
equipment and modifications are accepted, the Contractor, at no additional cost to

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P461

Finance Committee - Agenda - 6/7/2017 - P462

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
462
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-3
SUBMITTALS

the Owner, shall do all work necessary to make such modifications.

N. A maximum of two submissions of each Shop Drawing will be reviewed, checked,
and commented upon without charge to the Contractor. Any additional submissions
which are ordered by the Engineer to fulfill the stipulations of the Drawings and
Specifications, and which are required by virtue of the Contractor's neglect or
failure to comply with the requirements of the Drawings and Specifications, or to
make those modifications and/or corrections ordered by the Engineer in the review
of the first two submissions of each Shop Drawing, will be reviewed and checked
as deemed necessary by the Engineer, and the cost of such review and checking, as
determined by the Owner, and based upon Engineer's documentation of time and
rates established for additional services in the Owner-Engineer Agreement for this
Project, may be deducted from the Contractor to make all modifications and/or
corrections as may be required by the Engineer in an accurate, complete, and timely
fashion. Resubmittals for the sole purpose of providing written responses to review
comments will not be considered a resubmittal counting towards the two
submission limit.

1.3 SAMPLES
A. The Contractor shall submit samples when requested by the Engineer to establish
conformance with the specifications, and as necessary to define color selections
available.

1.4 OPERATION AND MAINTENANCE MANUALS

A. The Contractor shall furnish the Engineer a predetermined number of hardcopies
and 1 electronic PDF of a complete instruction manual for installation, operation
and maintenance of each item specified (unless otherwise specified) transmitted
using e-mail, File Transfer Protocol (FTP), Compact Disc (CD) or approved
submittal sharing software. At least 3 months prior to the expected substantial
completion date, the Contractor shall submit to the Engineer all manuals in
accordance with the requirements specified herein.

B. Each manual shall be provided in a stand-alone binder or shall be suitable for
insertion into a 3-ring binder. Include the General Contractor's and Manufacturer's
representative's contact information on the front cover. O&M manuals must be
appropriate for the project and customized for the project. If a Manufacturer's
standard O&M manual is included in the submittal, all non-applicable content must
be removed or crossed out.

C. Manuals shall include operating and maintenance information on all systems and
pieces of equipment. The manual shall contain sufficient data to install, operate,
maintain, repair and rebuild all components of the equipment, design data specific
to the project. Descriptions of operation should include procedures for both normal
and emergency operation. All information required by the Operations and
Maintenance Manual Certification Form described herein and any additional
information deemed necessary by the Owner and Engineer for proper installation,
operation and maintenance. Also include model numbers and serial numbers, as
well as rated capacities and motor data, where applicable.

D. Attached to every hardcopy and electronic PDF of each Operations and

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P462

Finance Committee - Agenda - 6/7/2017 - P463

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
463
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-4
SUBMITTALS

Maintenance Manual submitted, the Contractor shall provide a copy of the complete
Operations and Maintenance Manual Certification Form (copy provided for the
Contractor's use at the end of this Specification Section) signed by both the
Contractor and the Manufacturer.

1.5 MANUFACTURER'S CERTIFICATES

A. Prior to accepting the installation, the Contractor shall submit manufacturer's
certificates for each item specified.

B. Such manufacturer's certificates shall state that the equipment has been installed
under either the continuous or periodic supervision of the manufacturer's authorized
representative, that it has been adjusted and initially operated in the presence of the
manufacturer's authorized representative, and that it is operating in accordance with
the specified requirements, to the manufacturer's satisfaction. All costs for meeting
this requirement shall be included in the Contractor's bid price.

1.6 SUBMISSION REQUIREMENTS
A. Accompany submittals with transmittal letter, containing:
1. Date.
2. Project title and number.
3. Contractor's name and address.
4 The sequential shop drawing number for each shop drawing, project data and
sample submitted shall be:
a. Specification Section number followed by a dash and then a sequential
number beginning with 01 (e.g., 16000-01).
b. Under limited situations when additional different pieces of equipment
are submitted under the same specification section, those submittals
shall be numbered sequentially (e.g. 05500-01, 05500-02, 05500-03,
etc.).
c. Resubmittals shall include decimal point and an alphabetic suffix after
the corresponding sequential number (e.g., 16000-01A).
d. O&M submittals shall be numbered with the Specification Section
number followed by a dash, the letters “OM”, another dash, and then a
sequential number beginning with 01 (e.g. 16000-OM-01). Resubmittals
of O&Ms shall include an alphabetic suffix after the corresponding
sequential number (e.g., 16000-OM-01A).
5. Notification of deviations from Contract Documents.
6. Other pertinent data.
B. A completed Submittal Certification Form shall be attached to each hardcopy and
electronic PDF of each shop drawing and must include:
1. Project name
2. Specification Section and sequential number with alphabet suffix for
resubmittal
3. Description
4. — Identification of deviations from Contract Documents.
Contractor's stamp, initialed or signed, certifying review of the submittal,
verification of field measurements and compliance with Contract Documents.
6. Where specified or when requested by the Engineer, manufacturer's

WN

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P463

Finance Committee - Agenda - 6/7/2017 - P464

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
464
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-5
SUBMITTALS

certification that equipment, accessories and shop painting meet or exceed the
Specification requirements.
7. Where specified, manufacturer's guarantee.

C. Requirements for Electronic Submittals:

1. Each individual shop drawing or O&M submittal shall be contained in one
PDF.

2. The first page of the PDF shall be the Submittal Certification Form as
described above.

3. Subject lines for e-mails transmitting PDF submissions and subsequent
correspondence referring to specific submittals shall identify the submittal’s
Specification Section, sequential number, appropriate alphabet suffix for
resubmittals, and a brief description (e.g. 16010-01-Electrical General).

3. The electronic PDF shall be exactly as submitted in the hardcopy and shall be
transmitted using e-mail, File Transfer Protocol (FTP), or approved submittal
sharing software.

4. PDF versions of 24x36 drawings shall be converted to 24 x 36 PDFs so as not
to lose the clarity of the original drawing.

5. Electronic PDF submittals that are not submitted in accordance with the
requirements stated above will not be reviewed by the Engineer.

1.7 RESUBMISSION REQUIREMENTS

A. Revise initial drawings as required and resubmit as specified for initial submittal.

B. Indicate on drawings any changes which have been made other than those required
by Engineer. All renumbering of shop drawings, relabeling of individual pieces or
assemblies or relocating of pieces or assemblies to other Drawings within the
submittal shall be clearly brought to the attention of the Engineer.

1.8 ENGINEER'S REVIEW

A. The review of shop and working drawings hereunder will be general only, and
nothing contained in this specification shall relieve, diminish or alter in any respect
the responsibilities of the Contractor under the Contract Documents and in
particular, the specific responsibility of the Contractor for details of design and
dimensions necessary for proper fitting and construction of the work as required by
the Contract and for achieving the result and performance specified thereunder.

B. The Engineer's review comments will be summarized on a Submittal Review Form,
which includes an action code. A description of each action code is provided
below.

1. No Exceptions Taken (Status 0 on shop drawing log). The shop drawing
complies with the Contract Document requirements. No changes or further
information are required. Where appropriate, the submittal review form will be
used to alert the Contractor, Owner and Field personnel of remaining items
within that specification section that still needs to be submitted.

2. Make Corrections Indicated (Status 1 on shop drawing log). The shop
drawing complies with the Contract Document requirements except for minor
changes, as indicated. Resubmittal is not required unless it is specifically called

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P464

Finance Committee - Agenda - 6/7/2017 - P465

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
465
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01340-6
SUBMITTALS

for; however, Engineer requires that all comments will be addressed by the
Contractor, unless otherwise notified in writing prior to execution of the
relevant work.

Conditional to Remarks (Status 2 on shop drawing log). The shop drawing
potentially complies with the Contract Document requirements, contingent
upon satisfactory resolution of review comments. Remarks will explicitly list
what information needs to be resubmitted. Resubmittal from the Contractor
should include a cover letter or summary which indicates how each review
comment has been addressed.

Revise and Resubmit (Status 3 on shop drawing log). The shop drawing
does not comply with the Contract Document requirement as submitted, but
may with changes indicated and/or submission of additional information. The
entire package must be resubmitted with the necessary information and a cover
letter which indicates how each review comment has been addressed and where
to find the information in the resubmittal.

Rejected (Status 4 on shop drawing log). The shop drawing does not comply
with the Contract Document requirements, for the reasons indicated in the
remarks, and is unacceptable.

In Review (Status 5 on shop drawing log). The shop drawing is currently
under review.

For Information Only (Status 6 on shop drawing log). The shop drawing
review was informational only. No comments are provided.

13089K

Page Image
Finance Committee - Agenda - 6/7/2017 - P465

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2381
  • Page 2382
  • Page 2383
  • Page 2384
  • Current page 2385
  • Page 2386
  • Page 2387
  • Page 2388
  • Page 2389
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact