Finance Committee - Agenda - 6/7/2017 - P456

By dnadmin on Mon, 11/07/2022 - 10:24
Document Date
Wed, 06/07/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 06/07/2017 - 00:00
Page Number
456
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__060720…

01320-2
SAFETY AND HEALTH PLAN

execution of this Contract. Spaces listed as Permit Required Confined
Space may only be entered with a permit, alternate procedures
(1910.146 (c) (5)), or reclassification to non-permit required confined
space (1910.146 (c) (7)). The Contractor is required to perform a site
evaluation to identify all hazards and potential hazards in work areas
whether included in Table 1 or not, prior to control of site.

b. The Contractor shall be responsible for all aspects of construction site
safety including development of appropriate confined space entry
procedures. The plan shall include, but not necessarily be limited to, the
following:

e => Definitions

Confined Space Evaluations

Equipment Selection

Confined Space Entry Training Documentation

Permit Required Confined Space Entry Requirements

Testing (Monitoring) and Ventilation

Confined Space Entry Permit Form

Rescue and Emergency Procedures

Emergency Contact Information

c. The Contractor shall inform the Owner and Engineer's representative
whenever work will be performed in a confined space and the permit
space program that the Contractor will follow.

d. The Contractor shall inform the Owner and Engineer's representative of
any hazards confronted or created during entry operations, either
through a briefing or during the entry operation.

e. The Contractor will coordinate entry operations with the Owner when
both Owner personnel and Contractor personnel will be working in or
near permit spaces.

f. The Owner, Engineer, their representatives, independent testing
laboratories and government agencies, when inspecting the site, shall be
supplied by the Contractor proper safety equipment when entry into a
confined space is required.

The Owner has provided Table 2 at the end of this section listing electrically-
classified spaces where the Contractor may be required to carry out work
tasks. The Contractor is required to perform a site evaluation to identify all
hazards and potential hazards in work areas whether included in Table 2 or
not, prior to control of site. Contractor shall implement appropriate safety
precautions and/or construction practices to comply with classification
requirements. Contractor shall ensure that all employees and subcontractors
working in these areas have received appropriate training and are properly
equipped in accordance with Contractor's Safety and Health Plan.

The Owner has provided Table 3 at the end of this section listing chemical

storage and handling spaces where the Contractor may be required to carry out

work tasks. The Contractor is required to perform a site evaluation to identify
all hazards and potential hazards in work areas whether included in Table 2 or
not, prior to control of site. Contractor shall ensure that all employees and

13089K