Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 20101 - 20110 of 38765

Finance Committee - Agenda - 2/1/2017 - P240

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
240
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

The Contractor shall cover areas of exposed waste at the end of each day
with approved daily/intermediate cover or natural soils, which may be
obtained from on-site sources.

During the work, the Contractor shall regularly check for odors in the down-
wind direction and employ additional odor neutralizing agent if odors are
detected.

The Contractor shall have a portable misting system available to control
odors during construction activities that involve excavation in waste. The
Contractor shall be responsible for maneuvering the equipment as necessary
based on wind direction or source of odor, and replenishing the equipment
with water and odor control agent. The Owner will provide water for
Contractor’s use. The Contractor shall be responsible for locating the
portable misting system downwind of their operations on a daily basis. The
system shall be moved as the construction location changes.

In lieu of the misting system, odor control may be accomplished by spraying
directly on odorous spoils, into trenches, and at the top of well boreholes.
This method shall be used on odorous spoil piles if the misting system is not
effective. To limit potential implications to worker health and safety,
spraying an odor neutralizing solution directly in the work area shall not
occur while construction activity (ie, header pipe installation, gas well
installation, etc.) is in progress at such locations. In those instances, the
portable misting system shall be positioned downwind of the construction
activity and located only as close to active work areas as possible without
creating a potential hazard for workers working in those areas.

[END OF SECTION 02350]

File No. 3066.07

Odor Control During Construction 02350 - Page 2 of 2 September 2016

Page Image
Finance Committee - Agenda - 2/1/2017 - P240

Finance Committee - Agenda - 2/1/2017 - P241

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
241
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

CONTENTS

DIVISION 15 - MECHANICAL

Section 15210 - High-Density Polyethylene Pipe (HDPE), Fittings, and Appurtenances

SANBORN I HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P241

Finance Committee - Agenda - 2/1/2017 - P242

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
242
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

SECTION 15210
HIGH-DENSITY POLYETHYLENE (HDPE) PIPE, FITTINGS, AND APPURTENANCES
PART 1 - GENERAL
1.1 SCOPE OF WORK

A. Furnish and install HDPE pipe and fittings for the landfill gas collection and
control system (GCCS), condensate main, and the compressed air supply.

B. Pressure test solid HDPE pipe.
1.2 DELIVERY, STORAGE, AND HANDLING

A. The pipe and fitting manufacturer shall package products for shipment in a
manner suitable for safe transport by commercial carrier. When delivered,
CONTRACTOR shall inspect the shipment and report any damage to the pipe and
fittings manufacturer. Pipe and fittings shall be handled, installed, and tested in
accordance with the Manufacturer’s recommendations, and the requirements of
this Section.

B. Pipe Storage:

1. Store or stack pipe to prevent damage from marring, crushing or puncture.
Limit maximum stacking height to 6 ft or the Manufacturer’s recommended
maximum height, whichever is less.

2. Store in accordance with the Manufacturer’s recommendations.

C. Pipe Handling:
1. Protect pipe from excessive heat or harmful chemicals.
2. Handle pipe and use equipment needed to avoid gouging of the pipe surfaces.

1.3 SUBMITTALS

A. CONTRACTOR shall submit to ENGINEER a Certificate of Conformance with the
Specifications.

B. CONTRACTOR shall submit documentation demonstrating that the pipe-welding
technicians are certified by the pipe manufacturer to weld HDPE pipe.

PART 2 - PRODUCTS
2.1 PHYSICAL PROPERTIES

A. Materials used to manufacture the HDPE pipe and fittings shall meet the following
physical property requirements:

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P242

Finance Committee - Agenda - 2/1/2017 - P243

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
243
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances

Page 2 of 9

August 2016 3066.07
Property Unit Test Value
Procedure

Material Designation - PPI/ASTM -
PPI Material Listing - PPI TR-4 PE 4710
Cell Classification - ASTM D3350 445474C
Density g/ml ASTM D1505 >0.941
Melt Index [E] g/10 min ASTM D1238 <0.15
Flexural Modulus psi ASTM D790 >110,000 and <160,000
Tensile Strength psi ASTM D638 3,000 to 3,500
ESCR [C] hours ASTM D1693 fo>5000
HDB psi ASTM D2837 1,600 @ 23°C
UV Stabilizer [C] % Carbon Black | ASTM D1603 2 to3
Elastic Modulus psi ASTM D638 110,000
Brittleness Temperature oF ASTM D746 <-180
Vicat Softening Temperature oF ASTM D1525 255
Thermal Expansion in/in/oF ASTM D696 8x 10E-5
Hardness Shore D ASTM D2240 64
Molecular Weight Category - - Extra High

There shall be no evidence of splitting, cracking, or breaking when the pipe is

Ring Stiffness Constant (RSC) values for the pipe shall be 90 percent of the

The pipe and fittings shall be homogenous throughout and free from visible
cracks, holes, foreign inclusions, or other injurious defects. The pipe shall be as
uniform as commercially practical in color, opacity, density, and other physical

B.

tested.
C.

nominal.
D.

properties.
E.

Clean rework or recycled material generated by the Manufacturer’s own
production may be used so long as the pipe or fittings produced meet all the
requirements of this Section.

2.2 PIPEAND FITTINGS

A.

Dimensions:

1. Pipe Dimensions: The nominal inside diameter of the pipe shall be true to
the specified pipe size in accordance with ASTM D2513. Standard laying
lengths shall be 40 ft + 2 in.

2. Fitting Dimensions: Fittings such as couplings, wyes, tees, adaptors, etc. for
use in laying pipe shall have standard dimensions that conform to ASTM
D3261.

3. Pipe and fittings shall be as noted on the drawings.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P243

Finance Committee - Agenda - 2/1/2017 - P244

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
244
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 3 of 9

August 2016

3066.07

B.

Pipe and fittings shall be produced by the same manufacturer and from identical
materials meeting the requirements of this Section. Special or custom fittings
may be exempt from this requirement.

Pipe and fittings shall be pressure rated to meet the service pressure
requirements specified. Fittings shall be fully pressure rated to at least the same
service pressure rating as the joining pipe.

Molded fittings shall meet the requirements of ASTM D3261 and this Section. At
the point of fusion, the outside diameter and minimum wall thickness of fitting
butt fusion outlets shall meet the diameter and wall thickness specifications of
the mating system pipe. Fitting markings shall include a production code that
identifies the location and date of manufacture. Upon request, the Manufacturer
shall provide an explanation of his production code.

Marking:

1. Each standard and random length of pipe and fitting shall be clearly
marked with the following information:
a. Manufacturer’s Name or Trademark;

b. ASTM Standard Designation;

Cc. Nominal Pipe Size;

d. Class & Profile Number;

e. Production Code, including Extrusion Date, and Lot or Batch Number;

and
f. Standard Dimension Ratio (SDR).

The pipe and fitting manufacturer shall certify that samples of production pipe
have undergone stress regression testing, evaluation, and validation in
accordance with ASTM D2837 and PPI TR-3. Under these procedures, the
minimum hydrostatic design basis shall be certified by the pipe and fitting
manufacturer to be 1600 psi at 73.4°F and 800 psi at 140°F.

Material shall be listed in the name of the Pipe and Fitting Manufacturer by the
Plastics Pipe Institute (PPI) in PPI TR-4 with the following Standard Grade
ratings:

73.4°F 140°F
1. Hydrostatic Design Basis (HDB) 1,600 psi _—800 psi
2. Hydrostatic Design Stress (HDS) 800 psi 400 psi

PPI material listing in the name of the resin supplier is not acceptable in meeting
this requirement.

Certification - as the basis of the acceptance of the material, the Manufacturer
shall furnish a Certificate of Conformance upon request. When prior agreement
is being made in writing between CONTRACTOR and the Manufacturer, the
Manufacturer shall furnish other conformance certification in the form of
affidavit of conformance, test results, or copies of test reports.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P244

Finance Committee - Agenda - 2/1/2017 - P245

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
245
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 4 of 9

August 2016

3066.07

2.3 GASKETS AND HARDWARE

A. All gaskets shall be Viton. Joint hardware shall be Type 316 stainless steel.

2.4 FITTINGS

A.

Fittings shall be manufactured from polyethylene compound having cell
classification equal to or exceeding compound used in pipe to ensure
compatibility of polyethylene resins.

Fittings shall be from same manufacturer as pipe being provided. OWNER may
allow substitution for approved material with use of flanged joint sections.

Dimensions of fittings conforming to standard dimensions and tolerances in
accordance with ASTM D3261.

Fittings shall have the same or higher pressure rating as pipe.

Markings:

1. Manufacturer’s name or trademark.

2 Nominal size.

3. Type of plastic pipe.

4. Standard dimension ratio.

5 Extrusion date, lot number or batch number.

The Drawings do not show all fittings that may be required. CONTRACTOR shall
provide all fittings required for a complete installation.

PART 3 - EXECUTION

3.1 FIELD QUALITY CONTROL

A.

Pipe may be rejected for failure to conform to any of the following:

1. Fractures or cracks passing through pipe wall, except single crack not
exceeding 2 in. in length at either end of pipe, which shall be cut off and
discarded. All pipes within one shipment shall be rejected if defects exist in
more than five percent of shipment or delivery.

Cracks sufficient to impair strength, durability, or service ability of pipe.
Defects indicating improper proportioning, mixing, and molding.

Damaged ends, where such damage prevents making satisfactory joint.
Damage due to handling or installation. Scratches and gouges exceeding
five percent of the wall thickness shall be considered excessive, and may be
rejected by ENGINEER or OWNER.

ae wWN

Acceptance of fittings, stubs, or other specially fabricated pipe sections shall be
based on visual inspection by ENGINEER and documentation of conformance to
this Section.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P245

Finance Committee - Agenda - 2/1/2017 - P246

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
246
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 5 of 9

August 2016

3066.07

C.

Prior to backfilling trench CONTRACTOR shall obtain as-built top of pipe
coordinates and elevations at grade changes, terminations, fittings, and at least
every 50 ft along the pipe.

3.2. INSTALLATION

A.

B.

Trench, backfill, and compact in accordance with Specification Section 02200.

Heat Fusion of Pipe:

1.

Weld pipe in accordance with the Manufacturer’s recommendation for butt
fusion methods. The Pipe Manufacturer shall certify fusion machine
operators.

Butt fusion equipment for joining procedures shall be capable of meeting
conditions recommended by the Pipe Manufacturer including, but not
limited to, temperature, alignment, and fusion pressures.

Branch saddle fusions shall be joined in accordance with manufacturer’s
recommendations and procedures. Branch saddle fusion equipment shall
be of a size to facilitate saddle fusion within the trench. Extrusion welds
shall not be allowed.

For cleaning pipe ends, solutions such as detergents and solvents, when
required, shall be used in accordance with the Manufacturer’s
recommendations. Solvents shall not be used unless approved by OWNER.
Do not bend pipe to greater degree than minimum radius recommended by
manufacturer for type and grade.

Do not subject pipe to strains that will overstress or buckle pipe or impose
excessive stress on joints.

Before butt fusing pipe, observe inside of each pipe length for presence of
dirt, sand, mud, shavings, and other debris or animals. Remove debris from
pipe prior to fusing.

Cap open ends of fused pipe at end of each working day to prevent entry by
animals, debris, or stormwater and potential escape of gas.

Use compatible fusion techniques when polyethylenes of different melt
indexes are fused together. Refer to the Manufacturer’s specifications for
compatible fusion.

Flange Jointing:

1.
2.

Use on flanged pipe connection sections.

Convoluted stainless steel backup rings shall be used for joining HDPE

pipes below grade, and epoxy-coated carbon steel backup flanges shall be

used above grade.

Butt fuse fabricated flange adapters to pipe or use electrofusion couplings.

Observe the following precautions in connection of flange joints:

a. Use full-face Viton gaskets only.

b. All fasteners and back-up rings shall be Type 316 stainless steel below
grade, and zinc-plated steel above grade.

c. Align flanges or flange/valve connections to provide tight seal.
Gaskets are required for flange/valve connections.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P246

Finance Committee - Agenda - 2/1/2017 - P247

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
247
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 6 of 9

August 2016

3066.07

d. US Standard round washers may be used on some flanges when in
accordance with the Manufacturer’s recommendations. Bolts shall be
lubricated in accordance with Manufacturer’s recommendations.

e. Torque flange bolts in sequence and in accordance with the
Manufacturer’s recommendations. Do not over-torque bolts.
CONTRACTOR shall use a torque wrench to tighten all flange
fasteners.

Pull bolt down by degrees to uniform torque in accordance with the

Manufacturer’s recommendations.

Protect below grade bolts and flanges by covering with a 6-mil thick

polyethylene wrap. Duct tape wrap to HDPE pipe.

Electrofusion couplers, where used, shall be installed in accordance with

the Manufacturer’s specifications. The outside diameter of the HDPE pipe

and face shall be prepared in accordance with the Manufacturer’s
recommendations prior to installing the coupler.

Pipe Placement:

1.

2.

3.

o1

10.
11.

12.

Grade control equipment shall be of the type to accurately maintain design
grades and slopes during installation of pipe.

Unless otherwise specifically stated, install pipe in accordance with the
Manufacturer’s recommendations.

Maximum lengths of fused pipe to be handled as one section shall not
exceed 400 ft and shall be placed according to the Manufacturer’s
recommendations as to pipe size, pipe SDR, and topography so as not to
cause excessive gouging or surface abrasion. Pipe wall gouges deeper than
3/16-in. shall be cause for rejection of the pipe.

Cap pipe sections longer than single joint (usually 40 ft) on both ends
during placement except during fusing operations.

Remove dirt or debris from inside of pipe before backfilling.

Notify ENGINEER prior to installing pipe into trench and allow time for
observation. CONTRACTOR shall correct irregularities identified during
observation.

Complete connections within trench whenever possible to prevent
overstressed connections.

Allow pipe sufficient time to adjust to trench temperature prior to testing,
fusion welding, making segment connections, or backfilling activity.

To reduce branch saddle stress, install saddles at slope equal to and
continuous with connecting pipe.

Install reducers adjacent to laterals and tees unless directed otherwise.
Place pipe system in trench allowing at least 12 in./100 ft for thermal
contraction and expansion.

Trench and backfill soil in accordance with Specification Section 02200.

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P247

Finance Committee - Agenda - 2/1/2017 - P248

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
248
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 7 of 9
August 2016

3066.07

3.3

A.

PIPE TESTING

CONTRACTOR shall perform a pneumatic test on solid pipe and fittings greater
than 50 ft in length after placement in the trench, in accordance with the
Manufacturer’s recommendations.

Pipes shall be pressure tested in presence of ENGINEER. Provide a minimum 7
days notice to ENGINEER before performing test.

Pneumatic testing shall be performed as follows:

1. The test period at the test pressure shall last no less than 10 minutes.

2. Provide all necessary connections, bulkheads, flanges, bracing, and
blocking, as well as all required test equipment.

3. Test pressure gauges:

a. For GCCS and condensate main pipes, the test pressure gauge shall
have a maximum range of no more than 20 psig, with minor
gradations no greater than 0.1 psig.

b. For the compressed air pipe, the test pressure gauge shall have a
maximum range of no more than 200 psig, with minor gradations no
greater than 1 psig.

4. Pipe to be tested shall be exposed in the trench, except bends, reduced
pressure rated fittings and components, which shall be buried or
restrained. Flange connections shall be visible to check for leaks.

5. Test pressure:

a. For GCCS and condensate main pipes, the test pressure shall be 10
psig.

b. For the compressed air pipe, the test pressure shall be 150 psig.

6. Test shall be accepted if the pressure drop over 10 minutes is less than 5
percent of the pressure at the beginning of the test period.

Test Report

1. ENGINEER shall prepare and submit to OWNER a test report using the

attached forms for each pipe system tested. Include following information
in test report.

Date of test.

Description and identification of pipe system tested.
Type of test performed.

Test fluid.

Test pressure.

Results of test.

Type and location of leaks detected.

Corrective action taken to repair leaks.

Results of retesting.

Name of person performing test.

Treg me ao oD

[END OF SECTION 15210]

SANBORN HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P248

Finance Committee - Agenda - 2/1/2017 - P249

By dnadmin on Mon, 11/07/2022 - 10:29
Document Date
Wed, 02/01/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/01/2017 - 00:00
Page Number
249
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020120…

Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 8 of 9
August 2016 3066.07

SANBORN I HEAD

Page Image
Finance Committee - Agenda - 2/1/2017 - P249

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2007
  • Page 2008
  • Page 2009
  • Page 2010
  • Current page 2011
  • Page 2012
  • Page 2013
  • Page 2014
  • Page 2015
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact