1. Relocation of 2 burners and rewire of controls:
Time & Material for the relocation of two (2) burners. There was not enough room to access these
control panels and it was mutually agreed upon that they needed relocating. Procontrols did all
of the rewiring necessary.
Labor: 80 hours @ $85/hr. $6,800.00
Materials:
2. Miscellaneous pipe fittings:
Total Time & Materials
2) 4" Milwaukee flanged gate valves @$1,280.03 ea
2) 4" Milwaukee flanged check valves @$1,146.06 ea
4) 4" weld 90's @$88.90 ea
1) 4" weld Tee @$120.34 ea
2) 5" x4" Blk bushing @$98.40 ea
2) 5" Blk plugs @$56.60 ea
42") 1.25" Blk pipe Sch 80 @$6.1 0'
5) 1.25"x 4" Blk nipples @$7.85 ea
6) 1.25" Milwaukee /PS Ball valves @$59,98 ea
3) 4" bolt & gasket sets @$19.90 ea
1) 4" x 1.25" Blk bushing @$37. 74
1) 1" x 3/4" Blk coupling @$5.10 ea
2) 1.25" x3" Blk nipples@$6.90 ea
1) 1" x 3/4" Blk Tee @$6.85 ea
1) 3/4" Milwaukee IPS Ball Valve with hose adapter and cap @$39.10
1) 1" x 3/4" Blk bushing @3$3.09 ea
1) 4" x 1.5" Blk bushing @$32.22 ea
1) 1.5" x 1.25" Blk bushing @$5.24
Hlot} Misc. cutting wheels and ace's
ea
@$125
J lot) 5/8" & 3/4" bolts and nuts @$68.00
2) Deliveries by AELCO @$125 ea
Total Materials and Delivery Charges
Page | of 2
$7,480.00
$2,560.06
$2,292.12
$355.60
$120.34
$196.80
$113.20
$256.20
$39.25
$359.88
$59.70
$37.74
$5.10
$13.80
$6.85
$39.10
$3.09
$32.22
$5.24
$125.00
$68.00
$250.00
$6,939.29