Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances
August 2016
Page 9 of 9
3066.07
ATTACHMENT 1 TO SECTION 15210
PIPE PRESSURE AIR TEST LOG
Project No.:
Project Name:
SANBORN | HEAD ————
Project Location:
Weather:
Contractor: Test No.:
Sanborn Head Personnel:
Person/Company Performing the Test:
Date of Test: Time of Test: Finish:
Pipe Length: ~ ft. ‘pe Diameter: Pipe Material: Pipe SDR/Sch.::
Rated Working Pressure: Test Pressure: psi
Location/ designation of pipe tested:
t T Pr Pe
Time Pipe Temperature Pressure Gauge Reading Pressure Drop
(min.) (°C) (psig) (%)
0
5
10
15
30
60
Pass Fail Retest? Yes No
Description of leaks and repairs of retested pipe segments:
P -P
P.= Percent Pressure Drop DT x 100
oO
P, = Initial Pressure Gauge Reading
P,; = Pressure Gauge Reading at Time t
Comments:
Signature:
SANBORN HEAD
=) THE CITY OF NASHUA ‘The Cate City’
Financtal Services
Purchasing Department
January 26, 2017
Memo #17-095
TO: MAYOR DONCHESS
FINANCE COMMITTEE
SUBJECT: HEADWORKS UPGRADE PROJECT APPROVAL FOR CHANGE ORDER #2 (VALUE:
$47,438)
DEPARTMENT: 169 WASTEWATER; FUND: SRF LOAN
Please see the attached communication from Noelle Osborne, Wastewater Department Operations
Supervisor, dated January 26, 2017 for the information related to this purchase.
Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.
The Wastewater Department Operations Supervisor, Board of Public Works (1/26/2017 meeting) and the
Purchasing Department recommend approval of this Change Order #2 in the amount of $47,438 to
TBuck Construction, Inc. of Auburn, ME.
Respectfully, .
. VDah Kooken
Purchasing Manager
Cc: N Osborne L Fauteux
[229 Main Street ¢ Nashua, New Hampshire 03061 Phone (603) 589-3330 « Fax (603) 589-3233
To:
From:
Re:
C. Motion:
Attachments:
Discussion:
City of Nashua, Public Works Division
Board of Public Works Meeting Date: January 26, 2017
Noelle Osbome, Plant Operations Supervisor
Wastewater Department
Headworks Upgrade Project
To approve the change order to the Headworks Upgrades contract with T-Buck
Construction, Inc. in the amount of $47,438.05. Funding will be through: Department:
169 Wastewater; Fund: SRF Loan; Activity: Headworks Upgrades.
Change Order 2 Backup
The contract with TBuck for the Headworks Upgrades at the Wastewater Treatment
Facility is for $2,848,222. Change order 1 in the amount of $8,460.75 was for the
installation of a 6” insertion valve on the 6” protected waterline.
This change order is for a number of items as shown in the attached backup material
including new lockers for the men’s locker room, making the new women’s locker
room ADA compliant, relocating pipes and ducts due to conflicts, replacing a waterline
valve that does not work, and changing out the electric circuit for a new heater. These
additions were not known during the design phase since some pipes, particularly drain
pipes are often concealed behind wall and the conflict was not known till the contractor
began removing walls according to the plans.
The total amount of this change order comes to $47,438.05. The Engineer (Wright
Pierce) and Wastewater Department has reviewed these costs and appear to be in line
with work to be done. The new value of their contract following this change order will
be in the amount of $2,904,120.80.
This project is an SRF funded project and the City will be seeking a State Aid Grant
(SAG) in the amount of 20% of the costs should such funding become available.
B-6.!
CHANGE ORDER
No. 2
PROJECT: _Headworks Upgrade DATE OF ISSUANCE:
OWNER: City of Nashua
229 Main St, Nashua, NH 03062
(Address)
CONTRACTOR: T-Buck Construction, Inc. OWNER’s Project No.
CONTRACT FOR: _Headworks Upgrade ENGINEER _Wright-Pierce
ENGINEER’s Project No. 13089
You are directed to make the following changes in the Contract Documents.
Description: Refer to the Attachments.
Purpose of Change Order: Refer to the Attachments.
Justification: Refer to the Attachments.
Attachments: Change Order No. 2 Summary Sheet, Change Order No. 2 Items 1-9 back-up documentation.
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
Original Contract Price Original Contract Time
$ _2,848,222.00 455
(days or date)
Previous Change Orders Net change from previous Change Orders
$ 8,460.75 5
(days)
Contract Price prior to this Change Order Contract Time prior to this Change Order
$ _2,856,682.75 460
(days or date)
Net Increase (Decrease) of this Change Order Net Increase (decrease) this Change Order
$ 47,438.05 21
(days)
Contract Price with all approved Change Orders Contract Time with all Change Orders
$ _2,904,120.80 481
{days or date)
This document will become a supplement to the CONTRACT and all provisions will apply hereto. The
attached Contractor’s Revised Project Schedule reflects increases or decreases in Contract Time as
authorized by this Change Order.
Stipulated price and time adjustment includes all costs and time associated with the above described change.
Contractor waives all rights for additional time extension for said change. Contractor and Owner agree that
the price(s) and time adjustment(s) stated above are equitable and acceptable to both parties.
RECOMMENDED: APPROVED: APPROVED: APPROVED:
By: By: By: By:
Engineer Owner Contractor NHDES
aalt7
Date Date Date Date
13089A
CITY OF NASHUA, NEW HAMPSHIRE
WWTF HEADWORKS UPGRADE PROJECT
Change Order No. 2 Summary
Item No.
Description
Reason
Amount
Notes
Locker Replacement
City request to replace the remaining 30 lockers in the Men's Locker Room.
$14,199.93
T-Buck CP No.
1R-1, Dec. 5, 2016
Women's Shower Stall
City Building Department comments required the shower stall in the
Women's Locker Room be revised to an ADA-compliant unit.
$ 1,881.25
T-Buck CP No.
10, Dec. 1, 2016
Horn and Strobe Replacement
‘The existing Hazardous Gas Detector Horn and Strobe do not meet current
standards (are not explosion-proof). Relocation of the detector is part of this
project, and to complete this work the unit will need to be brought up to
code.
$ 11,073.75
T-Buck CP No.
12, Dec. 2, 2016
Wet Weill Ductwork
HVAC ducts in the Wet Well were damaged as a result of flooding; ducts
require replacement in order for the system to function properly.
$ 1,487.50
T-Buck CP No.
4, Dec. 16, 2016
Relocate 2-inch City Water
A 2-inch City Water line in the new Women's Locker Room needs to be
relocated to avoid a conflict with the new CMU wall being constructed as
part of the this project.
$ 1,987.38
T-Buck CP No.
6R-2, Dec. 21, 2016
Rain Leader Relocation
A 6-inch rain leader located in the corridor wall of the first floor requires
relocation as it will conflict with construction in the expanded Screenings
Room.
§ 9,029.00
T-Buck CP No.
8, Dec. 16, 2016
Install 3-inch Valve
City request to replace an existing 3-inch valve on the protected water line
located in the Boiler Room. Existing valve does not function properly; a new
valve is required to isolate the water line.
$ 2,906.74
T-Buck CP No.
9, Dec. 16, 2016
Hot Water Heater Feed
The existing power circuitry available was not compatible with the proposed
hot water heater installed in the Boiler Room.
$ 2,653.75
T-Buck CP No.
11, Dec. 2, 2016
Offset Odor Control Duct
There is a conflict between the new 30-inch odor control duct and an
existing 6-inch DIP generator drain; the duct will be off-set to avoid the
conflict.
$ 2,218.75
T-Buck CP No.
13A, Jan. 6, 2017
Total
$ 47,438.05 |
T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3976
PROPOSAL 1R-1
230 Commerce Way, Suite 302
{Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/5/2014
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code:
Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone:
Vandy Mornill
ies hereby submit specifications and estimate for:
Provide labor, material and equipment to replace 30 lockers in the men's locker room.
Labor
Carpenter $ 3,768.93
Laborer $ 337.28
Forklift operator $ 83.71
Equipment
Forklift $ 300.00
Material
Lockers $ 7,480.75
Clean Up 6% $ 251.40
Safety 3% $ 125.70
$ 12,347.76
15% O&P $ 4,852.16
$ 14,199.93
1) Owner will clean oui afl locker above and below lockers
2) No temp. locker facilities will be provided by contractor while work is being completed
3) If this proposal is accepted T Buck Construction requests and additional 3 days be added to the contract time
@ Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
FOURTEEN THOUSAND ONE HUNDRED & NINETY NINE DOLLARS
JAlt material is guaranteed to be as specified. All work to be campleted in a Authorized
workmanlike manner according to standard practices. Any alteration or Signature .
Jiaviation from above specifications involving extra costs will be executed only Mark McPheters
Lipon written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Note: This proposal may be withdrawn
our control, Owner to carry fire, tornado and other necessary insurance. Our by us # not accepted within 5 days.
workers ara fully covered by Workman's Compensation Insurance.
Acceptance of Proposal- the above prices, specifications and
work a5 specified. Payment will ba made as outlined ahove.
Date of acceptance Signature
T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 10
230 Commerce Way, Suite 302
Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/1/2016
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
fCity, State & Zin Code:
Portsmouth, NH 03801
Job Location:
Nashua NH
Engineer:
Andy Momill
Job Phone:
fe hereby submit specifications and estimate for:
Provide labor, material and equipment to provide and install four piece shower in womens locker room.
4 piece shower
CREDIT SHOWER
15% O&P
GC O&P 10%
TOTAL
$ 1,890.00
$ 385.00
$ 1,505.00
$ 225.75
$ 1,730.75
$ 150.50
$ 1,881.25
EIGHTEEN HUNDRED & EIGHTY ONE DOLLARS
We Propose hereby to furnish material and labor complete in accordance with above specificatians, for the sum of:
AJ! material is guaranteed to be as specified. All work to be completed in a
workmanlike manner according to standard practices. Any alteration or
Meviation from above specifications involving eatra costs will be executed only
Ripon written orders, and will become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
our control. Owner to carry fire, tornado and other necessary insurance. Our by us if not accepted within 5 days.
workers are fully covered by Workman's Compensation Insurance.
Acceptance of Proposal- the above prices, specifications and
Date of acceptance Signature
f work as specified, Payment will be made as outlined above.
T. Buck Construction, Inc.
249 Merrow Rd Aubum, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 12
{Proposal Submitted to: Phone:
Wright-Pierce Fax:
Street: Job Name
230 Commerce Way, Suite 302
(802) 431-1422
(866) 783-7101
Date = 12/2/2014
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code: Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer: Job Phone;
Andy Morn]
le hereby submit specifications and estimate for:
Provide labor, material and equipment to replace the harn & strobe in headworks
Electrical Sub
Labor $ 3,095.00
Materia! $ 5,074.00
$ 8,169.00
15% O&P $ 1,225.35
$ 9,394.35
10% GC $ 816.90
SUB TOTAL $ 10,211.25 $10,211.25
General Contractor
Coring 3@ $250.00 $ 750.00
18% O&P $ 112.50
SUB TOTAL $ 862.50 $ 862.50
TOTAL $11,073.75
1) If this proposal is accepted T Buck Construction requests and additional 5 days be added to the contract time
We Propose hereby to furnish material and tabor complete in accordance with above specifications, for the sum of:
fELEVEN THOUSAND & SEVENTY THREE DOLLARS
All material is guaranteed to ba as speciied. All work to be completed in a Authorized
workmanlike manner according to standard practices. Any alteration or Signature
Keviation from above specifications involving extra costs will be executed only Mark McPheters
Lipon written orders, and will become an axtra charge over and above tha
estimate. All agreements contigent upon strikes, accidents or dalays bayond
bur control. Owner to carry fire, tomade and other necessary insurance. Our
workers are fully covered by Workman's Compensation Insurance.
Note: This proposal may be withdrawn
by us if not accepted within 5 days.
Acceptance of Proposal- The above prices, specifications and
@ work as specified. Payment will be made as outlined above.
Date of acceptance
Signature
T. Buck Construction, Inc.
249 Merrow Rd Auburn, ME 04210
207-783-6223 * FAX 207-783-3970
PROPOSAL 4
230 Commerce Way, Suite 302
Proposal! Submitted ta: Phone:
Wright-Pierce Fax:
Street: Job Name
(802) 431-1422 Date 12/16/2016
(866) 783-7101
Nashua Wastewater Treatment Facility Headworks Upgrade
City, State & Zip Code:
Job Location:
Portsmouth, NH 03801 Nashua NH
Engineer. Job Phone:
Andy Momill
[Wwe hereby submit specifications and estimate for:
Provide labor, material and equipment to replace damaged duct work in wetwell as reviewed with Andy Morrill
Material $ 590.00
Labor $ 600.00
$ 1,190.00
15% O&P $ 178.50
$ 1,368.50
GC O&P 10% $ 119.00
TOTAL $ 1,487.50
1) T Buck will request a 2 day extension to the contract completion time if this proposal is excepted
We Propose hereby to furnish material and labor complete in accordance with above specifications, for the sum of:
ONE THOUSAND FOUR HUNDRED & EIGHTY SEVEN DOLLARS
Ali material is guaranteed to be as specified. All work to be completed in a
workmanlike manner according te standard practices. Any alteration or
deviation from above specifications involving extra costs will be executed only
hupon written orders, and wilt become an extra charge over and above the
estimate. All agreements contigent upon strikes, accidents or delays beyond
Authorized
Signature
Mark McPheters
Note: This proposal may be withdrawn
our control. Owner to carry fire, tomado and other necessary insurance. Our by us if not accepted within § days.
workers are fully covered by Workman's Compensation insurance.
Acceptance of Proposal- the above prices, specifications and
Date of acceptance Signature
le work as specified. Payment will be made as outlined above.