Finance Committee - Agenda - 10/4/2017 - P87

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P87

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Professional Registrations
New Hampshire, Virginia, Connecticut, New York, New Jersey
New Hampshire (Controls), Massachusetts (Controls)

Professional Affiliations

ASME, American Association of Mechanical Engineers
ISA, Instrumentation, Systems And Automation Society
NFPA, National Fire Protection Association

Certifications

Finance Committee - Agenda - 10/4/2017 - P86

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P86

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Utility power project for the Vineland Municipal Electrical Utility. Oversights of Air
permit, site planning, state, and county reviews. Engineering budget for this $70+
million project was $2.2 million

Federal Government
(district heating loop --dynamic response modeling, control component sizing, control
algorithm design, and control logic diagrams)

institutional

Finance Committee - Agenda - 10/4/2017 - P85

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P85

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Industrial Boiler Plant

Harvard University — Cambridge, MA

Managed all aspects of engineering, procurement, and commissioning for a complete
control and BMS retrofit of Boiler 11 (200kpph, 400 psig) and Boiler 6 (L0Okpph,400
psig) , bringing the existing outdated systems into compliance with modern codes and

instrumentation.

Finance Committee - Agenda - 10/4/2017 - P84

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P84

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Background

Finance Committee - Agenda - 10/4/2017 - P83

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P83

eyat=y6 a plats)

Finance Committee - Agenda - 10/4/2017 - P82

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P82

“oul ‘UOHONASUOD pue BuLeUlbU UOUpleEAA
BUO}S9II|\) SAQOEU|
fy SUIIPESQ ysel Sanoeu|
= ssolbold ySe] sagoeu
c Aluo-ysiuty & BUO}SOH [BUEa]Xy
7 Ajuo-WeyS syse | |eue}xy LUZ/9 PEM carved
Geen ect Arewuwng jenuey| Arewuns yeloig AluQ asoding Jesodod 404 ainpsyys joalold 398[Old
Ses dnyjoy Aewuing jenueyy Asewwng
Aluo-uojeing SUO}SOLIW
[Aen IRT yse{ jenuel| yids
Pe Alewwng aanoeu| yseL
FS “ft BLP/LNUL © SL/PILMUL —-SKepg ayejduio5 uBiseq dH 6e_
. | Be
Creer) SLeILNUL = LWez/@b ud = Shep 2 ubiseg %001 oe

Finance Committee - Agenda - 10/4/2017 - P81

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P81

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

15. Testing of existing digester gas, electrical and mechanical systems are not included.
The design assumes the digester gas quality complies with engine manufacturer’s
fuel specifications.

16. Geotechnical analysis is by others.

17. WWTF will provide all relevant design drawings for existing facility including site
survey information.

Revised August 28, 2017

WALDRON

Finance Committee - Agenda - 10/4/2017 - P80

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P80

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

Ciarifications and Exemptions

1.

10.

11.

12.
13.

14.

Waldron’s design scope is based on 2 CAT G3406 200kW Model recip engine
generators and the allotted space is sufficient for the 2 CAT G3406 200kW Model
recip engine generator installation and operation. Design will be based on best
available information, not vendor design submittal, for the engine generator and
switchgear.

Finance Committee - Agenda - 10/4/2017 - P79

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P79

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

5.3. Hold scoping meeting with NHDES to review existing permit and requirements
for submittal on new generators.
5.4. Prepare permit submittal package (assumed Title V permit is not triggered):

5.4.1. Collect information on digester gas characteristics and current
generation rates from city of Nashua.

5.4.2. Collect information of generator emission rates from Waldron.

Finance Committee - Agenda - 10/4/2017 - P78

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P78

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

3. 90% Design

3.1. Waldron will revise and incorporate the applicable comments to design
documents from the outcome of the 75% Design Phase review meeting.

3.2. Develop piping diagrams - plan, elevation and details.

3.3. Develop ductwork diagrams - plan, elevation and details.
3.4. Develop distribution piping diagrams - plan and details.

3.5. Mechanical installation specifications.