Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 10/4/2017 - P85

Finance Committee - Agenda - 10/4/2017 - P85

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
85
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Industrial Boiler Plant

Harvard University — Cambridge, MA

Managed all aspects of engineering, procurement, and commissioning for a complete
control and BMS retrofit of Boiler 11 (200kpph, 400 psig) and Boiler 6 (L0Okpph,400
psig) , bringing the existing outdated systems into compliance with modern codes and

instrumentation.

National Resources Group-Huntley — Tonawanda, NY

Project Manager for an engineering study project to refine options and initial design
for a gas firing retrofit of coal/fuel oil units 67 & 68 (1470 kpph, 2460 psig) for the
facility.

Wheelabrator Technologies -North Broward — Pompano Beach, FL
Project Manager for an engineering study of boiler performance and retrofit options
for LFG conversion for three MSW/NG boilers (186 kpph, 850 psig).

Utility and Power Plant

Lyondell Basell Cogeneration — West Lake, LA

Control programming and integration of the balance of plant controls for the 30 MW,
three generator facility with five steam generators.

Pfizer — Groton, CT
Fire Protection Engineer for the 10 MW CHP project. Controls Engineer responsible
for the control programming and integration of the balance of plant controls for the

cogeneration facility.

Biogen Idec — Cambridge, MA
Control systems FAT and SAT, integration efforts, and implementation of control
system training program for the 5 MW cogeneration facility.

P&G Gillette World Headquarters — Boston, MA
Responsible for the control systems, fire protection, and environmental monitoring
for the combustion turbine, CEMS, HRSG, and Gas Compressor at the 7.2 MW

cogeneration facility.

One Bryant Park — New York, NY
5 MW recuperative turbine cogeneration project --specification wiring, bidder
reviews, equipment selection, and vendor interface design.

Consolidated Edison Development — West Springfield, MA
Dual fuel conversion project.

Vineland Howard M Down Unit 11 — Vineland, NJ
Utility Grade Simple cycle combustion turbine project. Responsibilities included
project management of the engineering, design, and permitting support for a 64 MW

WALDRON ENGINEERING é