Finance Committee - Agenda - 10/4/2017 - P77
Nashua Waste Water Treatment Facility — Energy Recovery Generator Upgrade
Engineering Design Services
2.7. Prepare electrical control scheme design including load sharing mode of
operation among engines generator and utility and synchronization to the
utility.
2.8. Develop control system architecture.
2.9. Provide technical input to National Grid, the local Electrical Utility,
Interconnection application. Interconnection application will be the
responsibility of City of Nashua.