Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services
15. Testing of existing digester gas, electrical and mechanical systems are not included.
The design assumes the digester gas quality complies with engine manufacturer’s
fuel specifications.
16. Geotechnical analysis is by others.
17. WWTF will provide all relevant design drawings for existing facility including site
survey information.