Finance Committee - Agenda - 10/4/2017 - P86

By dnadmin on Mon, 11/07/2022 - 10:20
Document Date
Wed, 10/04/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 10/04/2017 - 00:00
Page Number
86
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__100420…

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Utility power project for the Vineland Municipal Electrical Utility. Oversights of Air
permit, site planning, state, and county reviews. Engineering budget for this $70+
million project was $2.2 million

Federal Government
(district heating loop --dynamic response modeling, control component sizing, control
algorithm design, and control logic diagrams)

institutional

Harvard University — Cambridge, MA

Boiler 13 project-facilities automation upgrade for a dual-fired large industrial boiler,
new fuel oil storage & distribution system, new steam turbine, new electrical
distribution system, additions to the balance of plant instrumentation and controls.

Harvard University — Cambridge, MA

Boiler 11&12 project-Project Management of the facilities automation upgrade for a
dual-fired large industrial boilers, retrofitted burner, and upgraded gas trains.
Replacement of CCS and BMS systems. Waldron was the engineer and the supplier
of the upgrade components. Responsible for permitting to support project

requirements

UMass Medical School — Worcester, MA

Facility upgrade to add a 7.5 MW turbine, HRSG, CEMS, chiller, and gas
compressor. Responsibilities included the control systems, fire protection, and
environmental monitoring system.

NECCO (Revere Energy Corp) — Revere, MA

Project Manager for facility upgrade project including Plant HVAC upgrades,
personnel protection insulation survey and installation, air compressor emergency
cooling modifications, air handler modifications, battery room venting retrofit,
emergency generator shelter structure, heat exchanger change out for jacket and
auxiliary water systems, master fuel trip installation, explosion relief valve retrofit,
and feed water system modifications.

Columbia University — New York, NY

Facility upgrade study comparing options for Brayton combustion turbine against
recuperative, Otto, and rankine cycle plants, responsible for control systems, fire
protection, and environmental monitoring system, loads and emissions profiles.

Professional Qualifications
BS, Mechanical Engineering, University of New Hampshire
Associate, Technical Writing, University of Phoenix

WALDRON ENGINEERING & CONST

Page Image