Additional Costs
Besides the “basic” services fee the following “additional” services costs need to be included
in the City’s TTG final engineering design services budget. These costs are considered
“allowances” because either their scope is yet to be finally determined, or the amount of
the service {i.e., number of progress meetings) has been determined.
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
603.228.1122 hlturner.com
Nashua Riverfront Development Profect
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t: 603.226.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301 =: 603.228.1122 hiturnor.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
:603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
Estimated Direct Costs
TOTAL ESTIMATED COST =
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 63301
t: 603,228,1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design