The H.L. Turner Group Inc.
27 Locke Road Concord, NH 63301
t: 603,228,1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
TASK DESCRIPTION WCRRIGURS pOrAe
PM Structural PE Sr PD Te HOURS
Segment 5 - Multi-Use Path Connector eR a!
5.1 - Erosion & Scour Determination 8 20 2 30
ae a a a Oo Sah ae OU GE Oe Ge Ge ee Ce SS Ce Se ee eee cee ee ee eee eee eee ee ee eee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee ee
Pe 2a a Rea FS a ee FS ed a B RBIS NA ORES 20 | el OE Pate Rapes 30 Sv
|
TOTAL HOURS 8 0 20 fi] 2 30
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 8 S 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ .
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sr PD) 0 $ 105.00 $ .
Technical Coordinator (TC) 2 $ 100.00 $ 200.00
| 30 | Total Fully Burdened Labor $ 4,000.00
Subconsultant S -
Expenses $ 100.00
Estimated Direct Costs $ 100.00
TOTAL ESTIMATED COST =
$ 7,100.00