Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 6/14/2022 - P94

Board Of Aldermen - Agenda - 6/14/2022 - P94

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
94
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301

603.228.1122 hlturner.com

Nashua Riverfront Development Profect
Final Engineering Design

5/11/2022
WORK HOURS TOTAL
KO ION
eames PM Structural PE Sr PD Te HOURS
Segment 13 - 4 Water Street Boardwalk
13.1 - Boardwalk River Plies & Building 4 24 8 8 Fi 46
Connections
13.2 - Boardwalk Structural Details 4 16 4 z 26
13,3 - Expanded Boardwalk Design Coordination 8 is ; : 20
13.4 - Design Expanded Boardwalk Section 4 20 4 8 2
13.5 - Design Retaining Wall{s) & River Piles for
4 1 4
JExpanded Boardwalk Section 4 2 a 6 =
13.6 - Design Piles - New Floating Dock 2 16 zt 20
13.7 - Design the New Floating Dock & Gangway 2 16 18
System Including Intermediate Supports
13.8 - Re-examine Flood Rise Criteria with A ma 2 30
Final Plie(s) Layout
13.9 - Assess Pile Etoslen/acou Ice & 4 2 Fi 18
Woody/Miscellaneous Debris Loadings
13,10 - Prepare Final Design Drawings & 8 40 16 140 rr
Specifications
a a a a a a fe we Gees ee dee Ge ee es es gee nd ee ee ee ee ee ee ee ee ee ee eee ee ee ee a ee ee ee eee eee
44 172 176 236
ee a ee pe a a a ee pee a
TOTAL HOURS 44 172 72 176 26 490
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager {PM) 44 $ 150.00 $ 6,600.00
Structural Engineer {Structural} 172 $ 185.00 $ 31,820.00
Project Engineer {PE} 72 § 130.00 $ 9,360.00
Sr. Project Designer | (Sr PD} 176 § 105.00 $ 18,480.00
Technical Coordinator (TC) 26 $ 100.00 $ 2,600.00
490 Total Fully Burdened Labor $ 68,860.00
Subconsultant $ -
Expenses $ 400.00

Estimated Direct Costs $ 100.00
TOTAL ESTIMATED COST= $ 6?,250.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P94

Footer menu

  • Contact