The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
TASK DESCRIPTION eS norat
PM Structural PE Sr PO Tc HOURS
Segment 6 - 53 Main Street Boardwalk
6.1 - Pile Redesign 2 24 6 16 2 50
6.2 - Verify 0.00 ft rise 4 24 2 30
6.3 - Structural Detailing 0
6.4 - £&S Evaluation 4 16 2
6.5 - Final Drawings & Specifications 8 40 4 64 4 120
Les, gun nym mm enter eu mee pT ne a ee
ee Se eee EISEN 1S Oa a OS BE TEN 20 SR SO ae a 10 Sree) 20089 |S
TOTAL HOURS 18 64 50 80 10 222
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 18 $ 150.00 $ 2,700.00
Structural Engineer (Structural) 64 5 185.00 5 11,840.00
Project Engineer (PE) 50 S$ 130.00 § 6,500.00
Sr. Project Designer i (Sr PD} 80 $ 105.00 $ 8,400.00
Technical Coordinator (TC) 10 5 100.00 5 1,000.00
222 Total Fully Burdened Labor $ 30,440.00
Subconsultant $ -
Expenses $ 200.00
Estimated Direct Costs $ 200.00
TOTAL ESTIMATED COST= $ 30,640.00