Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 6/14/2022 - P92

Board Of Aldermen - Agenda - 6/14/2022 - P92

By dnadmin on Mon, 11/07/2022 - 07:50
Document Date
Fri, 06/10/2022 - 16:12
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 06/14/2022 - 00:00
Page Number
92
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__061420…

The H.L. Turner Group Inc.

27 Locke Road Concord, NH 03301: 603.228.1122 hiturner.com

Nashua Riverfront Development Project
Final Engineering Design

5/11/2022
TASK DESCRIPTION rene wel S mETAE
PM Structural PE SrPD Té HOURS
Segment 11-58-60 MainStreet Boardwalk | |
11.1 - Design Bracket Connections 2 16 2 20
11.2 - Transition Design - Boardwalk to Ramp 2 16 | eae 2 20
11.3 - Design - Ramp & Piles 2 24 2 28
11.4 - Riverbank Slope E&S 4 16 2 22
11.5 - Final Drawings & Specifications 8 S6 4 80 8 156
cig Ss PT ab mt ea | 18 BG 112 ey | IN ZO ne] AN gO He ee ao a | GT 246 I |
TOTAL HOURS 18 112 20 80 16 246
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM} 18 § 150.00 $ 2,700.00
Structural Engineer (Structural) 112 $ 185.00 § 20,720.00
Project Engineer (PE) 20 $ 130.00 $ 2,600.00
Sr. Project Designer | (Sz PD} 80 $ 105.00 $ 8,400.00
Technical Coordinator (TC) 16 $ 100.00 $ 1,600.00
246 Total Fully Burdened Labor $ 36,020.00
Subconsultant § -
Expenses 5 300,00
Estimated Direct Costs $ 300.00

TOTAL ESTIMATED COST= $ 36,320.00

Page Image
Board Of Aldermen - Agenda - 6/14/2022 - P92

Footer menu

  • Contact