The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
TASK DESCRIPTION WORKIHOURS aCTAL
PM Structural PE Sr PD Tc HOURS
Permit Support g 24 4 36
i¢)
i¢)
i¢)
ae 0
i¢)
fo Siam Ay ehhh ee mh tr ht mh thy nin A RA Dir de Rg en i et ee oe oe es a ee ee ee ee ee
24 i¢) 4 36
a > es a ee ee ee ee eee eee ee ee ee ee eet ee eee ee ee ee eee ee ee EM OBE a SA 24 [iP £OrS [RES Srey 36 2
TOTAL HOURS & 0 24 it) 4 36
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) B § 150.00 $ 1,200.00
Structural Engineer (Structural) 0 $ 185.00 $ -
Project Engineer (PE) 24 § 130.00 $ 3,120.00
Sr. Project Designer | {Sr PD) i) $ 105.00 $ -
Technical Coordinator (TC) 4 $ 100.00 $ 400.00
| 36 Total Fully Burdened Labor $ 4,720.00
Subconsultant $ -
Expenses $ 280.00
Estimated Direct Costs 2£0.00
wi
TOTAL ESTIMATED COST = 5,000.00
