Nashua Riverfront Development Project
Final Engineering Design
5/11/2022
TASK DESCRIPTION WORK NOURS Tora
PM Structural PE Sr PD Te HOURS
Segment & - New River Crossing (Pedestrian Bridge)
8.1 - Bridge Abutment - Floodway "0.00 ft rise" Analysis 8 24 2 | 34
8.2 - Abutment Relocation and E&S Recommendations 4 16 2 22
J i
eck ah Sener Saad GURL, - Sea thorig: Pastakel EES] AGCR 3 CART Coa CONN | ELE AD bees eS Genes aed ae]. 56) Sl
TOTAL HOURS 12 0 40 oO 4 56
ESTIMATED ENGINEERING COSTS
Work Estimated
Hours Hourly Rate Costs
Project Manager (PM) 12 § 150.00 § 1,800.00
Structural Engineer (Structural) i] § 185.00 5 -
Project Engineer {PE) 40 § 130.00 § 5,200.00
Sr. Project Designer | (Sr PD) 0 § 105.00 $ -
Technical Coordinator (TC) 4 § 100.00 § 400.00
| 56 j Total Fully Burdened Labor $ 7,400.00
Subconsultant $ -
Expenses § 100.00
Estimated Direct Costs $ 100.00
TOTAL ESTIMATED COST = $ 7,500.00