Finance Committee - Agenda - 6/7/2017 - P457

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P457

01320-3
SAFETY AND HEALTH PLAN

subcontractors working in these areas have received appropriate training and
are properly equipped in accordance with Contractor's Safety and Health Plan.
Updating:
1. Contractor shall be responsible for updating the Safety and Health Plan as
appropriate throughout the course of the construction period.

1.2 SUBMITTALS

A.

Finance Committee - Agenda - 6/7/2017 - P456

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P456

01320-2
SAFETY AND HEALTH PLAN

execution of this Contract. Spaces listed as Permit Required Confined
Space may only be entered with a permit, alternate procedures
(1910.146 (c) (5)), or reclassification to non-permit required confined
space (1910.146 (c) (7)). The Contractor is required to perform a site
evaluation to identify all hazards and potential hazards in work areas
whether included in Table 1 or not, prior to control of site.

Finance Committee - Agenda - 6/7/2017 - P455

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P455

01320-1

SECTION 01320

SAFETY AND HEALTH PLAN

PART 1 - GENERAL

1.1

DESCRIPTION
A. Work Included:

1.

The Contractor shall be solely responsible for initiating, maintaining and
supervising all safety precautions and programs in connection with the work,
as outlined herein and in the General and Special Conditions of the Contract
Documents. Within (10) days after the effective date of the Agreement
between Owner and Contractor, submit to the Engineer a Safety and Health
Plan as specified herein.

Finance Committee - Agenda - 6/7/2017 - P454

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P454

01310-2
CONSTRUCTION SCHEDULES

4. Provide narrative report, including:

a. Discussion of problem areas, including current and anticipated delay
factors.

b. Corrective action taken, or proposed.
c. Description of revisions that may affect schedules.

1.2 SUBMITTALS
A. Submit updated schedules with each progress payment request.
B. Submit 4 copies of initial and updated schedules to the Engineer.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P453

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P453

01310-1

SECTION 01310

CONSTRUCTION SCHEDULES

PART 1 - GENERAL

1.1 DESCRIPTION

A.

Finance Committee - Agenda - 6/7/2017 - P452

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P452

01200-2
PROJECT MEETINGS

subcontractors. The Engineer will advise other interested parties and request their
attendance.
Minimum agenda: Distribute data on, and discuss:

1.

2.

Nn Y&

oo

10.

Identification of key project personnel for Owner, Engineer, Contractor,
funding/regulatory Agencies.

Responsibilities of Owner, Engineer, Resident Project Representative,
Contractor.

Channels and procedures for communications.

Construction schedule, including sequence of critical work.

Finance Committee - Agenda - 6/7/2017 - P451

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P451

01200-1
SECTION 01200

PROJECT MEETINGS

PART 1 - GENERAL

1.1

1.2

1.3

DESCRIPTION

A. Work Included: To enable orderly review during progress of the work, and to
provide for systematic discussion of problems, the Engineer will conduct project
meetings throughout the construction period.

Finance Committee - Agenda - 6/7/2017 - P450

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P450

OLIS0A-5
MEASUREMENT AND PAYMENT

Item (4) Bid Alternate C — Control Building Lobby Offices Ductless Split System

A. Method of Measurement: Lump Sum.

B. Basis of Payment: Payment of the lump sum price for Item (4) shall be full compensation
for furnishing all labor, materials, tools and equipment required and for upgrading of the
Control Building Lobby Offices Ductless Split System, complete as indicated on the
Drawings and as specified and all its' appurtenances in its entirety.

END OF SECTION

13089K

Finance Committee - Agenda - 6/7/2017 - P449

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P449

O1150A-4
MEASUREMENT AND PAYMENT

29. Weather protection

30. Permits not otherwise paid for or provided by the Owner

31. Visits to the Project site or elsewhere by personnel or agents of the Contractor,
including manufacturer's representatives, as may be required

32. On-site and other facilities acceptable to Engineer for the storage of materials,
supplies and equipment to be incorporated into the Work

33. Facilities start-up services required by the Contract Documents

34. Mobilization/demobilization

Finance Committee - Agenda - 6/7/2017 - P448

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P448

1.8

01150A-3
MEASUREMENT AND PAYMENT

INCIDENTAL WORK
Incidental work items for which separate payment is not made include (but are not
limited to) the following items:

A.

1.

OC PANDMAEYWN

11.
12.
13.
14.
15.

16.
17.
18.

19.

20.
21.
22.
23.
24.

25.

26.

27.
28.

Clearing, grubbing and stripping

Dust control

Dewatering

Clean-up