Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P447

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P447

1.3

1.4

1.5

1.6

1.7

O1150A-2
MEASUREMENT AND PAYMENT

encountered during the prosecution of the Work and until its final acceptance by the
Engineer, and for all risks of every description connected with the prosecution of
the work, except as provided herein, also for all expenses incurred in consequence
of the suspension of the work as herein authorized.

Finance Committee - Agenda - 6/7/2017 - P446

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P446

O1150A-1
SECTION 01150A

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 DESCRIPTION

A.

For lump sum items, payment shall be made to the Contractor in accordance with
an accepted Progress Schedule and Schedule of Values on the basis of actual work
completed.

For unit-price items, payment shall be based on the actual amount of work accepted

and for the actual amount of materials in place, as shown by the final

measurements.

Finance Committee - Agenda - 6/7/2017 - P445

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P445

01100-2
ALTERNATES

including but not limited to section 15671 and all associated controls and electrical gear,
piping and appurtenances for a fully functioning HVAC system.

2.4 BID ALTERNATE C
This alternate shall consist of furnishing and installing the new Control Building Lobby
Offices Ductless Split System as shown on the drawings and specified herein, including
but not limited to section 15671 and all associated controls and electrical gear, piping
and appurtenances for a fully functioning HVAC system.

PART 3 - EXECUTION

Finance Committee - Agenda - 6/7/2017 - P444

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P444

01100-1
SECTION 01100

ALTERNATES

PART 1 - GENERAL

1.1 DESCRIPTION
A. Work Included:

1. Each Bidder shall be held fully responsible for examining the scope of the

Alternates generally defined herein and for recognizing any modifications to his

work caused by any Alternate

B. Alternate:

1. To enable the Owner to compare total costs where alternate materials and
methods might be used, an Alternate has been established as described in this
Section of these Specifications.

Finance Committee - Agenda - 6/7/2017 - P443

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P443

fps
ft.
gal.
gpd
gpm

IBR

in.
inter.
ISA
kva

kw

lb.
max.
MCB
MGD
Min.
NBS
NEC
NEMA
NEWWA
NPT
OS&Y
PCA
ppm

%

psi
psig
PVC
rpm
RUS
sf.
STL. W.G.

S.y.
TDH
USAS

USS GAGE
VC

WSP

Fed. Spec.

01070-2
ABBREVIATIONS & SYMBOLS

Feet Per Second

Feet

Gallons

Gallons Per Day

Gallons Per Minute

Horsepower

Finance Committee - Agenda - 6/7/2017 - P442

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P442

PART 1 - GENERAL

1.1 DESCRIPTION
A.

01070-1

SECTION 01070

ABBREVIATIONS & SYMBOLS

Where any of the following abbreviations are used in these Specifications, they
shall have the meaning set forth opposite each.

AASHTO
AC

ACI

ACP
AGA
AIC
AGMA

ATEE(IEEE)

AISC
amp

Amer. Std.

ANSI
API

ASA
ASCE
ASHRAE

Finance Committee - Agenda - 6/7/2017 - P441

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P441

01050-2
COORDINATION

coordinate their work with the instrumentation supplier by providing operating
sequences, input/out specifications with wiring diagrams for all equipment, and that
they shall review and comment on each others shop drawings to insure that all
interfaces are compatible.

1.3 CONTRACTOR'S USE OF PREMISES

A. Contractor shall have use of the premises within the limits shown on the Drawings
and as defined in the General Conditions for the performance of the Work and
Section 01010a — Summary of Work.

Finance Committee - Agenda - 6/7/2017 - P440

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P440

01050-1
SECTION 01050

COORDINATION

PART 1 - GENERAL

1.1 DESCRIPTION

A.

Contractor is required to work in close proximity to Owner's existing facilities. The
Contractor, under this Contract, will be responsible for coordinating construction
activities with Owner to ensure that services, facilities, and safe working conditions
are maintained.

Finance Committee - Agenda - 6/7/2017 - P439

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P439

3.4

3.5

01045-3
CUTTING, CORING AND PATCHING

Provide protection for existing equipment, utilities and critical areas against water
or other damage caused by drilling operation.

Slurry or tailings resulting from coring operations shall be vacuumed or otherwise
removed from the area following drilling. Slurry or tailings shall not be allowed to
enter floor drains.

Work area (e.g., adjacent walls, floors, ceilings, pipes, conduits, etc.) shall be
cleaned to remove splash residues from coring operation.

CUTTING

Finance Committee - Agenda - 6/7/2017 - P438

By dnadmin on Mon, 11/07/2022 - 10:24
  • Read more about Finance Committee - Agenda - 6/7/2017 - P438

01045-2
CUTTING, CORING AND PATCHING

PART 3 - EXECUTION

Pagination

  • Previous page ‹‹
  • Page 1252
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact