Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/17/2017 - P260

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P260

C-1.

CONNECTING PIPE OF DIFFERENT MATERIAL
(Mechanical joint couplings, Strongback Fernco or equal and Reducers)

Finance Committee - Agenda - 5/17/2017 - P259

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P259

wo

be accompanied by a written report and will clearly show the condition of the
main and all service connections. Contractor is responsible for any repairs needed
to the CIPP should there exists imperfections or defects in the lining that is
judged by the Engineer to cause any problems with sewer flow such as potential
backups or loss in pipe capacity.

. The contractor shall provide means for cleaning of the pipe which shall be

incidental to the pipe lining.

Finance Committee - Agenda - 5/17/2017 - P258

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P258

pumping, excavation, backfill, removal of old pavement and other unsuitable
materials, bedding, select material, gravel sub-base, clearing, grubbing, testing, a
post video analysis, plugging of decommissioned pipe penetrations in manholes,
removal and replacement of sidewalks and curbing (separate pay items for these
two items) and all work incidental thereto and not specifically included for
payment under other items

Finance Committee - Agenda - 5/17/2017 - P257

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P257

differing conditions are found and require additional investigation by the
City/Contractor. The City Wastewater Department will assist using camera
equipment to investigate unknown pipes, but it does take some time for them to stop
their work and arrive on site to investigate the unknown pipe(s). Should the
investigation take longer than 3 hours, the City will work with the Contractor on
negotiating a reasonable hourly compensation for the down time.

Finance Committee - Agenda - 5/17/2017 - P256

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P256

SECTION 01150

MEASUREMENT AND PAYMENT

PART 1 — GENERAL

1.1

A.

SUMMARY

Under the price specified to be paid for each item, the Contractor shall furnish all
labor, materials, equipment, plant, and perform all operations to complete all work as
indicated and specified. All supervision, overhead items, bond and permit costs,
protection and precautions and all other costs, incidental to the construction work,
complete, and as specified, are also included.

Finance Committee - Agenda - 5/17/2017 - P255

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P255

15. Construction Crews

The Contractor shall not increase the number of construction crews assigned to the work
without providing one-week advance notice to the Engineer.

END OF SECTION

01140-4

Finance Committee - Agenda - 5/17/2017 - P254

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P254

11.

12.

13.

14.

Cutting, Fitting and Patching

The Contractor shall do all cutting, fitting, or patching of his work that may be required to
make its several parts come together properly and fit it to receive or be received by work
of other Contractors, as shown upon or reasonably implied by the drawings and the
specifications for the completed structure, including all existing work.

Finance Committee - Agenda - 5/17/2017 - P253

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P253

5.

10.

Dimensions of Existing Structures

Where the dimensions and locations of existing structures are of critical importance in the
installation or connections of new work, the Contractor shall verify such dimensions and
locations in the field before the fabrication of any material or equipment which is
dependent on the correctness of such information.

Occupying Private Property

Finance Committee - Agenda - 5/17/2017 - P252

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P252

SNIAWP WN

SS ee eS eS KE CO
ARON S)

3.

SECTION 01140
SPECIAL PROVISIONS

General

Excess Material and Hazardous Material
Water for Construction Purposes

Pipe Location

Dimensions of Existing Structures
Occupying Private Property

Existing Utility Locations - Contractor's Responsibility
Coordination of Work

Time for Completion of Contract
Maintenance of Trench Surface

Cutting, Fitting and Patching

Protection of Aquifer

Contractor’s Representative

Finance Committee - Agenda - 5/17/2017 - P251

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P251

13.

14.

15.

Electric Service

A. The Contractor shall make all necessary applications and arrangements and pay for all
fees and charges for electrical energy for power and light necessary for the proper
completion of this contract during its entire progress. The Contractor shall provide
and pay for all temporary wiring, switches, connections, and meters.

B. There shall be sufficient electric lighting so that all work may be done ina
workmanlike manner where there is not sufficient daylight.

Hazardous Waste

Pagination

  • Previous page ‹‹
  • Page 1201
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact