10.

11.

12.

B. Any errors, defects or omissions in the execution of the work or in the materials
furnished by the Contractor, even though they may have been passed or overlooked
or have appeared after the completion of the work, discovered at any time before the
final payment is made hereunder, shall be forthwith rectified and made good by and
at the expense of the Contractor and in a manner satisfactory to the Engineer.

Finance Committee - Agenda - 5/17/2017 - P249

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P249

Protection and Relocation of Existing Structures and Utilities

A.

All existing buildings, utilities, pipes, poles, wires fences, curbing, property line
markers and other structures must be preserved in place without being temporarily
or permanently relocated, shall be carefully supported and protected from damage
by the contractor. Should such property be damaged, it shall be restored by the
Contractor, at no additional cost to the Owner.

Finance Committee - Agenda - 5/17/2017 - P248

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P248

Maintenance of Traffic

A.

G.

Unless permission to close the street is received in writing from the proper authority,
all excavated materials and equipment shall be placed so that vehicular and
pedestrian traffic may be maintained at all times. All traffic control plans must be
submitted to the City of Nashua’s Traffic Department (with a copy to the Engineer)
for review and approval.

Finance Committee - Agenda - 5/17/2017 - P247

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P247

Easements

A. As indicated on the drawings, the work may be located in easements obtained or
owned by the Owner. The Contractor has no rights outside of the easements unless
they are obtained from the property owner.

B. Contractor shall schedule work so that it will cause minimum inconvenience and
nuisance to abutting property owners, over the shortest possible time.

Finance Committee - Agenda - 5/17/2017 - P246

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P246

CNAME WN

\O

10.
11.
12.
13.
14.
15.

SECTION 01110

CONTROL OF WORK AND MATERIALS

General

Hauling, Handling and Storage of Materials
Easements

Open Excavations

Maintenance of Traffic

Care and Protection of Property

Protection and Relocation of Existing Structures and Utilities
Maintenance of Flow

Rejected Materials and Defective Work

Sanitary Regulations

Safety and Health Regulations

Site Investigation

Electric Service

Hazardous Waste

Finance Committee - Agenda - 5/17/2017 - P245

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P245

SECTION 01014

SCOPE AND SEQUENCE OF WORK

PART 1 - GENERAL
1.01 WORK INCLUDED

A. This section of the specification covers the scope and sequence of work for the “2017
Sewer Replacement Project" project in the City of Nashua, NH.

B. The Contractor shall furnish all labor, materials, equipment, and incidentals required to
compete the work as shown on the drawings and as specified herein.

Finance Committee - Agenda - 5/17/2017 - P244

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P244

Section Number

01

02

01014
01110
01140
01150
01330
01331
01550
01570
01735

02085
02111

02252
02300
02324
02441

02451
02518
02530
02533

02534
02619
02631
02650
02650A
02745
02745A
02769

02800
02930

TABLE OF CONTENTS

Description

GENERAL REQUIREMENTS

Finance Committee - Agenda - 5/17/2017 - P243

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P243

DIVISION 9

CONSTRUCTION SPECIFICATIONS

Finance Committee - Agenda - 5/17/2017 - P242

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P242

NOTICE OF AWARD

DATED:

TO:

(Bidder)
ADDRESS:
OWNER’S CONTRACT NO. :
PROJECT:

(Insert name of Contract as it appears in the Bidding Document)
You are notified that your Bid dated for the above Contract has been considered. You are

the apparent Successful Bidder and have been awarded a contract for

as advertised plus
addendums.
(Indicate total Work, alternatives or sections or Work awarded)

Finance Committee - Agenda - 5/17/2017 - P241

By dnadmin on Mon, 11/07/2022 - 10:25
  • Read more about Finance Committee - Agenda - 5/17/2017 - P241

LIST OF EXHIBITS
A. Notice of Award
B. Notice to Proceed

C. Change Order
D. Certificate of Substantial Completion

DIVISION 8

EXHIBITS