Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P254

Finance Committee - Agenda - 5/17/2017 - P254

By dnadmin on Mon, 11/07/2022 - 10:25
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
254
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

11.

12.

13.

14.

Cutting, Fitting and Patching

The Contractor shall do all cutting, fitting, or patching of his work that may be required to
make its several parts come together properly and fit it to receive or be received by work
of other Contractors, as shown upon or reasonably implied by the drawings and the
specifications for the completed structure, including all existing work.

The Contractor shall not endanger any work by cutting, digging, or otherwise and shall not
cut or alter the work of any other Contractor, save with the consent of the Engineer.

All holes or openings required to be made in new or existing work, particularly at pipe,
conduit, or other penetrations not covered by escutcheons or plates shall be neatly
patched. All such holes shall be made completely watertight as approved by the Engineer.

Size and locations of holes required in steel, concrete, or other structural or finish
materials for piping, wiring, ducts, etc., which have not been located and detailed on the
drawings shall be approved by the Engineer prior to layout and cutting thereof. All holes
shall be suitably reinforced as required by the Engineer.

Workmanship and materials of patching and repair work shall match the adjacent similar
work and shall conform to the applicable sections of the specification. Patches and joints
with existing work shall provide, as applicable in each case, visual, structural, and
waterproofing continuity.

Protection of Aquifer

The Contractor's attention is directed to the fact that the construction area maybe located
within the watershed of the existing water supply. The Contractor shall take extra
precautions to ensure that no pollutants enter the groundwater table from the construction
area. The Contractor shall not store fuels or other hazardous materials or potential
contaminants on the construction site. In the event of a spill, the Contractor shall
immediately notify the Engineer.

Contractor's Representative

The Contractor shall designate a representative who will be available to respond to
emergency calls by the Owner at any time day and night and on weekends and holidays
should such a situation arise.

Hours of Construction Activity

The Contractor shall conduct all construction activity between 7:00 a.m. and 5:00 p.m.,
Monday through Friday. No construction work shall be allowed on Saturdays, Sundays or
Holidays as shown in the General Conditions without written authorization from the

Owner.

Omitted.