Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 29211 - 29220 of 38765

Finance Committee - Minutes - 2/5/2020 - P10

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
10
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 10
ON THE QUESTION

Mayor Donchess

Mr. Caggiano?

Mr. Caggiano

Nick Caggiano, Park & Rec Department. The Crown Hill Pool Rehabilitation we started last year, we
rehabilitated the actual surface, put in some new fixtures, we did some leveling of the pool the deck and the
next phase is to actually work on the bath house. It needs a new roof, it’s probably been roofed from some
time in the 70’s; it leaks. We need to put in new fixtures in the bath houses and the showers, counters, sinks.
So a lot of the outside interior work with sheaving and siding needs to be done. We went out to bid and Forcier
Contracting was the low bid. They’ve done work for us in the past, we want to try to get this done before pools
open in June.

Alderman O’Brien

Thank you Mr. Mayor. | was just going to say put the priority to opening day on this and it sounds like you are
already ahead of it to do so. Nothing more disappointing when one of our quality pools is closed.

Mr. Caggiano

It’s our largest pool and for a lot of the children in the neighborhood, the pool sometimes is their vacation for
the summer, they spend a lot of time there. So it is kind of important to be able to give them a good
experience, you know.

Alderwoman Lu

Is that right behind Dr. Crisp School.

Mr. Caggiano

Sort of, it is off of Burke Street, it is right next to Girls Inc.

Alderman Klee

Just one quick question | know we went with Forcier Contracting, so did it go out for bid?

Mr. Caggiano

Yes it went out to bid and we received three bids.

Alderman Klee

Three bids, that’s what | thought | read. Ok.

MOTION CARRIED

Page Image
Finance Committee - Minutes - 2/5/2020 - P10

Finance Committee - Minutes - 2/5/2020 - P11

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
11
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 11

From: Dan Kooken, Purchasing Manager
Re: Portable Toilet Contract (Value: $32,140) Department: 177 Parks and Recreation; Funds: General
and Trusts

MOTION BY ALDERMAN HARRIOTT-GATHRIGHT TO ACCEPT, PLACE ON FILE, AND AUTHORIZE THE
CONTRACT FOR PORTABLE TOILETS IN THE AMOUNT OF $32,140 TO UNITED SITE SERVICES.
FUNDS ARE AVAILABLE IN DEPARTMENT 177 PARKS AND RECREATION; FUND: GENERAL AND
TRUSTS

ON THE QUESTION

Mr. Caggiano

We put out 32 units every year at various parks throughout the City. This was put out to bid competitively
through our vendor list and our web site. We only received on bid, it was a little more than | could afford to
spend on this so we negotiated with them and we actually got them to reduce their cost. So that worked out
pretty good.

Alderwoman Kelly

It’s important stuff when you are at out at the park. Real important. So when you negotiated did you get down
to where you were or even lower?

Mr. Caggiano

No he held his price, United held their price for over 10 years. So it was time and | understood that but it was
almost going to be doubled and we just said “no”. We tried to negotiate with them a little bit and they looked at
it and they sharpened their pencil.

Alderwoman Kelly

Can | follow up? | know there are definitely spots that we have to have portapotties. Do we ever look at what
the long term costs of renting these is against putting in actual bathhouse or bathroom that would be there?

Mr. Caggiano

Bathhouses are expensive so if anybody does construction, you know if you redo a kitchen or a bathroom it’s
$300.00 a square foot is a pretty good price to go on. And when you do it commercially with the type —
hundreds of thousands of dollars could be spend. Then there is not water at all the parks, we would have to
bring in sewer, it’s a big thing. | don’t ever see us getting away from portable units.

Alderwoman Kelly

| am sure there are places where it definitely doesn’t work, | was just asking if we have ever looked at that, “Oh
this does have water, it does make sense, we should put in a bathhouse or just a small bathroom’.

Mr. Caggiano

We do have them; at Mine Falls by the soccer fields, that made sense there, we were right on top of the sewer,
and the water was there. We have time locks on there so they are only available for us during normal business
hours. So somebody can’t go in and vandailize it.

Alderman O’Brien

| am kind of just wondering how are we with the liability as far as any vandalism to these things?

Page Image
Finance Committee - Minutes - 2/5/2020 - P11

Finance Committee - Minutes - 2/5/2020 - P12

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
12
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 12

Mr. Caggiano

They are, within the contract, they are responsible. So occasionally they'll tip one over, gross but not bad. We
have had them burned before and they are insured, and if they get vandalized, that’s on the contractor.

Alderwoman Lu

Just two questions. How often, what is the billing cycle, is that a month?

Mr. Caggiano

A month.

Alderwoman Lu

OK and only have three ADA’s so are there some places where we don’t have an ADA there?

Mr. Caggiano

We have ADA’s at Roby Park because we have an ADA playground there. We have one at Legacy
Playground because that’s an ADA playground and | want to say, catch me on this one, | don’t have the sheet.
| want to say the other one is down at Whipple Street at the entrance to Mine Falls Park.

Alderwoman Lu

| just thought that we’d need one at every spot that we have to, but | guess that is not the requirement.

Mr. Caggiano

No and the cost is pretty significant to upgrade that.

MOTION CARRIED

From: Dan Kooken, Purchasing Manager

Re: Energy Recovery Upgrades — Construction Services — Change Order 4 (Value: $49,167)
Department: 169 Wastewater; Fund: Wastewater

MOTION BY ALDERMAN HARRIOTT-GATHRIGHT TO ACCEPT, PLACE ON FILE, AND AUTHORIZE

CHANGE ORDER #4 FOR ENERGY RECOVERY UPGRADES — CONSTRUCTION SERVICES - IN THE

AMOUNT OF $49,167 TO METHUEN CONSTRUCTION. FUNDS ARE AVAILABLE IN DEPARTMENT 169

WASTEWATER; FUND: WASTEWATER

ON THE QUESTION

Mayor Donchess

Mr. Caggiano?

Mr. Caggiano

I'll be speaking for my co-workers, they couldn’t make it tonight on these next two items. David is looking for a
Change Order #4 for an amount not to exceed $49,168.26. The basic need is to modify the generator pads
and re-do the ceiling pipes support structure.

Page Image
Finance Committee - Minutes - 2/5/2020 - P12

Finance Committee - Minutes - 2/5/2020 - P13

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
13
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 13

The energy recovery building takes methane from the digester egg and through the generator produces energy
that gets fed back, and we make money on that. We just need to upgrade that.

Alderman Klee
| don’t know if you can answer this but we sell it to a third party correct? We are not using it within the City?

Mr. Caggiano

So some of the energy and again, I’m limited here, | know that they do use the energy at the plant and any
excess gets sent back to the grid.

Alderwoman Kelly

You may not know the answer to this but | wonder if this is the unit by the dam that we got back on line earlier
this year?

Mayor Donchess

No this is at the waste water treatment plant.
MOTION CARRIED

From: Dan Kooken, Purchasing Manager
Re: Landfill Gas Expansion — Changer Order 1 (Value: $135,140) Department: 168 Solid Waste; Fund:
Bond

MOTION BY ALDERMAN HARRIOTT-GATHRIGHT TO ACCEPT, PLACE ON FILE, AND AUTHORIZE
CHANGE ORDER #1 FOR LANDFILL GAS EXPANSION IN THE AMOUNT OF $135,140 TO SCS FIELD
SERVICES. FUNDS ARE AVAILABLE IN DEPARTMENT 168 SOLID WASTE; FUND: BOND

ON THE QUESTION

Mr. Caggiano

Again, Nick Caggiano, Parks & Rec Department Superintendent. Speaking for Superintendent LeFluer as part
of the landfill gas expansion system, they need to do a change order of $135,140.00 to repair and replace
some of the horizontal and vertical gas wells. These wells are at the landfill, they vacuum of the methane that
is produce from the trash and it is sent to an energy recovery spot, a flare or the generator that is managed by
a third party.

Alderwoman Lu

| just wondered if you could tell me about the phrase “pending bond approval’? Is this a large project that has
been bonded and this is just something more that needs to be done or added to it.

Mr. Caggiano

| am going to pass the baton to the Mayor. | believe it’s a bond.

Mayor Donchess

Yes. So the landfill, we are required by DES, the Department of Environmental Services, to collect gas out of
the landfill. It is burned and generates electricity, that part of it is done by the third party provider. So these
expansion projects and a lot of the work at the landfill and there is a lot going on because they are constructing

Page Image
Finance Committee - Minutes - 2/5/2020 - P13

Finance Committee - Minutes - 6/1/2022 - P5

By dnadmin on Sun, 11/06/2022 - 21:48
Document Date
Wed, 06/01/2022 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 06/01/2022 - 00:00
Page Number
5
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__060120…

Finance Committee — 06/01/2022 Page 5

From: Kelly Parkinson, Purchasing Manager
Re: Engineering Consulting Change Order #1 in the amount not to exceed $40,427 funded from 81700
Infrastructure Improvements/Wastewater Fund (Wastewater)

MOTION BY ALDERMAN COMEAU TO PLACE ON FILE AND APPROVE AMENDMENT 1 TO THE ENGINEERING
SERVICES CONTRACT FOR TASKS REQUIRED BY THE EPA MS4 PERMIT WITH HAZEN AND SAWYER, PC, OF
MANCHESTER, NH, IN AN AMOUNT NOT TO EXCEED $40,427. FUNDING WILL BE THROUGH DEPARTMENT: 169
WASTEWATER; FUND: WASTEWATER; ACTIVITY: STORMWATER ABATEMENT

ON THE QUESTION

Dan Hudson, City Engineer

So again, Dan Hudson, City Engineer. This is part of permitting requirements. The municipal separated storm sewer
system permitting issued by EPA requires that we go to our drainage outfalls and test them. The city has at least the 359
outfalls. We've tested a couple hundred of them but we have the rest to test. So these services will be provided under
that arrangement. The effort is tested during dry weather. You wouldn't expect that much flow during dry weather and if
you do, then you kind of have to chase that wire seeing that. So that's what this effort is and it's required by EPA permit.

Chairman Clemons

Okay. Any questions, comments from the Committee? Seeing none.
MOTION CARRIED

From: Kelly Parkinson, Purchasing Manager
Re: Engineering Consulting in the amount not to exceed $75,000 funded from 81700 Infrastructure
Improvements/Wastewater Fund (Wastewater)

MOTION BY ALDERMAN COMEAU TO PLACE ON FILE AND APPROVE THE ENGINEERING SERVICES
CONTRACT WITH HAYNER/SWANSON, INC., OF NASHUA, NH, FOR SEWER AND DRAINAGE ANALYSIS AND
DESIGN IN AN AMOUNT NOT TO EXCEED $75,000. FUNDING WILL BE THROUGH DEPARTMENT: 169
WASTEWATER; FUND: WASTEWATER; ACTIVITY: CSO FLOODING & STORMWATER ABATEMENT

ON THE QUESTION

Dan Hudson, City Engineer

So again, Dan Hudson, City Engineer. We like to approach our projects as complete street type projects. We're currently
working on a project called “Factory Street”, a design of Factory Street. We have often need for design of stormwater
separation from sewer and that sort of thing to support our other efforts. So that's what this contract does. This is witha
local engineering firm. It'll be on an as needed basis to support us for those type of design efforts - stormwater and some
sewer design efforts.

Chairman Clemons

Any questions from the Committee? All right, you've all heard the motion.
MOTION CARRIED

From: Kelly Parkinson, Purchasing Manager

Re: Engineering Consulting for Highway, Bridge, Traffic, and Bicycle/Pedestrian Infrastructure in the amount not to
exceed $59,980 funded from 53107 Architect & Engineering
Services/NHDOT Grant & Prior Year Escrow

MOTION BY ALDERMAN COMEAU TO PLACE ON FILE AND APPROVE THE ENGINEERING SERVICES
CONTRACT FOR THE SAFE TRANSPORTATION FOR EVERY PEDESTRIAN PROJECT WITH HOYLE, TANNER &
ASSOCIATES, INC., OF MANCHESTER, NH, IN AN AMOUNT NOT TO EXCEED $59,980. FUNDING WILL BE
THROUGH DEPARTMENT: 160 ADMIN/ENGINEERING; FUND: GRANT & PRIOR YEAR ESCROW; ACTIVITY:
RECTANGULAR RAPID FLASHING BEACONS STEP GRANT

Page Image
Finance Committee - Minutes - 6/1/2022 - P5

Finance Committee - Minutes - 2/5/2020 - P14

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 14

Phase Ill and there’s always something happening is a bonded project. This is subject to approval of the bond
by the Board of Aldermen. Bond means it is borrowed money.

Alderwoman Lu
So | guess what | was confused about is if the project is already started, then the bond has already been

approved but what needs to be approved, why does it say “pending bond approval” $135,000.00 added to the
bond?

Mayor Donchess

Well the project hasn’t started in the sense that this work is a change order, meaning it is additional work
beyond what has already been authorized. So this is subject to a bond approval that covers a bunch of stuff
out at the landfill by the Board of Aldermen. So this part of the project has not begun and won’t until the money
is available.

Alderwoman Lu

| see. OK, thank you.

David Fredette, City Treasurer

Mr. Mayor | think I’m not sure but this might have been given to purchase a while ago because the Board of
Aldermen approved the bond in December for the landfill and | think this was part of that bond. So maybe they
wrote this up before the bond ...

Mayor Donchess

So David is thinking that we’ve already approved the bond which | think, thinking about it, our public hearings
aren’t on this so this is already approved.

Alderwoman Lu
It was a detail | was confused about.

Mr. Caggiano

| should point out that Memo was originally written in September. So that’s why.
Mayor Donchess

It's dated September, we should have noticed that.

MOTION CARRIED

UNFINISHED BUSINESS — None

NEW BUSINESS — RESOLUTIONS - None

RECORD OF EXPENDITURES

MOTION BY ALDERMAN HARRIOTT-GATHRIGHT THAT THE FINANCE COMMITTEE HAS COMPLIED
WITH THE CITY CHARTER AND ORDINANCES PERTAINING TO THE RECORD OF EXPENDITURES
FOR THE PERIOD FROM JANUARY 10, 2020 TO JANUARY 31, 2020

MOTION CARRIED

Page Image
Finance Committee - Minutes - 2/5/2020 - P14

Finance Committee - Minutes - 2/5/2020 - P15

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Wed, 02/05/2020 - 00:00
Meeting Description
Finance Committee
Document Type
Minutes
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_m__020520…

Finance Committee - 02/05/2020 Page 15

GENERAL DISCUSSION - None
PUBLIC COMMENT - None

REMARKS BY THE ALDERMEN

NON-PUBLIC SESSION - None
ADJOURNMENT

MOTION BY ALDERMAN O’BRIEN TO ADJOURN
MOTION CARRIED

The Finance Committee meeting was adjourned at 7:42 p.m.

Alderman Linda Harriott-Gathright
Committee Clerk

Page Image
Finance Committee - Minutes - 2/5/2020 - P15

Finance Committee - Agenda - 2/5/2020 - P1

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/31/2020 - 12:43
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
1
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020520…

7:00 pm

FINANCE COMMITTEE
FEBRUARY 5, 2020

City Hall — Room 208

ROLL CALL

PUBLIC COMMENT

COMMUNICATIONS

From:
Re:

From:
Re:

From:
Re:

From:
Re:

From:
Re:

From:
Re:

From:
Re:

Doria Brown, Energy Manager
Pre-approval to enter into contracts with 3° party suppliers for natural gas and electricity supplies

Dan Kooken, Purchasing Manager
Approval for Donation of a Surplus Pickup Truck from the Parks and Recreation Department to
Grow Nashua

Dan Kooken, Purchasing Manager
Purchase of Personal Protective Clothing/Equipment (Value: $48,988) Department: 152 Fire
Rescue; Fund: General

Dan Kooken, Purchasing Manager
Contract for Crown Hill Poo! Rehabilitation (Value: $34,200) Department: 177 Parks and
Recreation; Fund: Capital

Dan Kooken, Purchasing Manager
Portable Toilet Contract (Value: $32,140) Department: 177 Parks and Recreation; Funds: General
and Trusts

Dan Kooken, Purchasing Manager
Energy Recovery Upgrades — Construction Services — Change Order 4 (Value: $49,167)
Department: 169 Wastewater; Fund: Wastewater

Dan Kooken, Purchasing Manager
Landfill Gas Expansion — Changer Order 1 (Value: $135,140) Department: 168 Solid Waste; Fund:
Bond

UNFINISHED BUSINESS - None

NEW BUSINESS — RESOLUTIONS - None

NEW BUSINESS — ORDINANCES - None

RECORD OF EXPENDITURES

GENERAL DISCUSSION

PUBLIC COMMENT

REMARKS BY THE ALDERMEN

POSSIBLE NON-PUBLIC SESSION

ADJOURNMENT

Page Image
Finance Committee - Agenda - 2/5/2020 - P1

Finance Committee - Agenda - 2/5/2020 - P2

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/31/2020 - 12:43
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
2
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020520…

City of Nashua

Energy Manager
229 Main Street - Nashua, NH 03060 (603) 589-3265

January 28, 2020

TO: Mayor Donchess
Finance Committee

FROM: Doria Brown, Energy Manager

SUBJECT: Pre-approval to enter into contracts with 3™ party suppliers for natural gas and electricity
supplies

The Energy Manager is seeking pre-approval to competitively solicit and enter into agreements with 3™
party energy suppliers for the tariff-controlled supply portion of its natural gas and electricity utility bills.
There are several reasons for the purpose of this pre-approval, which are as follows:

e The City has realized both substantial cost savings and budget certainty by utilizing 3“ party
energy suppliers;

® These contracts must be executed and received by the supplier by 3 p.m. the same day the quote is
received to ensure delivery of the stated price and to avoid unfavorable pricing terms and/or
fluctuations;

e Natural Gas and/or Electricity contracts may be multi-year contracts to take advantage of the most
favorable terms offered.

The executed contracts will be provided via communication to the Finance Committee at their next
regularly scheduled meeting.

Page Image
Finance Committee - Agenda - 2/5/2020 - P2

Finance Committee - Agenda - 2/5/2020 - P3

By dnadmin on Mon, 11/07/2022 - 13:33
Document Date
Fri, 01/31/2020 - 12:43
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/05/2020 - 00:00
Page Number
3
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__020520…

B\ THE CITY OF NASHUA “The Gate City

Administrative Services

Purchasing Department

January 30, 2020
FROM: DAN KOOKEN — CITY OF NASHUA PURCHASING MANAGER
TO: FINANCE COMMITTEE

SUBJECT: APPROVAL FOR DONATION OF A SURPLUS PICKUP TRUCK FROM THE PARKS
AND RECREATION DEPARTMENT TO GROW NASHUA

The purpose of this communication is to inform you of and ask your approval for an equipment donation
of a surplus pickup truck from the City of Nashua Parks and Recreation Department to Grow Nashua. |
have included a Memo from Nicholas Caggiano, Superintendent of Nashua Parks and Recreation
Department with information about the donation of vehicle 09-532 along with images of the vehicle
and a letter from Grow Nashua’s Executive Director, Justin Munroe indicating their desire to accept this
donation if approved and how it would be used by their organization.

§ 5-88. Surplus stock.
[NRO 1975, T. 4, § 1618; NRO 1987, § 2-253; amended 11-26-1977 by Ord. No. O-77-278; 4-22-1986 by

Ord. No. 0-86-50; 6-28-1988 by Ord. No. 0-88-43]

All using agencies shall submit to the Purchasing Manager, at such times and in such form as he shall
prescribe, reports showing stocks of all supplies which are no longer used or which have become
obsolete, worn out or scrapped.

The Manager shall have the authority to transfer surplus stock to other using agencies. The Manager
shall have the authority to sell, by sealed bid or online auction, all supplies which have become unsuitable
for public use, or to exchange the same for, or trade in the same on, new supplies.

[Amended 10-9-2012 by Ord. No. O-12-022]

With approval of the Finance Committee, the Purchasing Manager may donate, barter, gift or otherwise
dispose of surplus material, stock or equipment which has failed to be sold, exchanged or traded
pursuant to Subsection B.

The Parks and Recreation Superintendent and the Purchasing Department recommend this donation to
Grow Nashua.

Respectfully,

ar’ Kooken
Purchasing Manager

Cc: J Donchess K Kleiner

229 Main Street » Nashua, New Hampshire 03061 « Phone (603) 589-3330 « Fax (603) 589-3233 |

Page Image
Finance Committee - Agenda - 2/5/2020 - P3

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2918
  • Page 2919
  • Page 2920
  • Page 2921
  • Current page 2922
  • Page 2923
  • Page 2924
  • Page 2925
  • Page 2926
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact