Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 27451 - 27460 of 38765

Finance Committee - Agenda - 5/16/2018 - P292

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
292
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

To:

From:

Re:

E. Motion:

Attachments:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: April 26, 2018

Jeff Lafleur, Superintendent
Solid Waste Department

2019 Landfill Gas Collection and Control System Expansion

To approve a contract with SCS Field Services of Reston, VA to construct an
expansion of the landfill gas collection system in the Phase J/II landfill in the
amount of $427,654. Funding will be through Department 168 Solid Waste;
Fund: Bond; Activity: Landfill Gas Expansion FY19.

Bid Tabulation

The City issued an Invitation to Bid for construction of an expansion and
modification to the landfill gas collection system in the Phase I/II landfill.
Periodic expansions of the gas collection system are required as the landfill
continues to be filled with waste. The Solid Waste Department’s engineering
firm, Sanborn Head and Associates, Inc. (SHA) prepared a construction design to
install nine (9) new horizontal gas collection wells, four (4) vertical landfill gas
collection wells with liquid pumping systems, Draintube surface collection on
selected areas of the landfill, and extend the main vacuum header. This expansion
of the gas collection system is required to control odors, mitigate fugitive methane
surface emissions and comply with the NHDES approved Operating Plan — Phase
II Secure Landfill Expansion and the Landfill Gas Collection System Enhanced
Monitoring Protocol/Standard Operating Procedures (EMP/SOP).

The City received bids from four (4) qualified vendors. Based on the low bid and
qualifications of SCS Field Services it is the recommendation of the
Superintendent of Solid Waste to accept SCS Field Services as the vendor to
perform the work listed above.

Page Image
Finance Committee - Agenda - 5/16/2018 - P292

Finance Committee - Agenda - 5/16/2018 - P293

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
293
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

Bid Tabulation

2019 Landfill Gas System Expansion
Four Hills Landfill

Nashua, New Hampshire

SCS Field Services Charter Contracting Company
Item a Quantity Bid Unit Cost Extended . . . Extended
No. Reseipuicn (w/ units) ($/units) Prices ($) Bid Unit Cost ($/units) Prices ($)
1 [Mobilization/Demobilization “1 LS | $20,750.00] LS $20,750.00] [| $30,500.00] LS $30,500.00
2 |Vertical LFG Extraction Wells 140 VF $140.00] VF $19,600.00 $300.00 VF $42,000.00
3__|Dewatering Pumps 4 EA $5,165.00] EA $20,660.00 $6,000.00 EA $24,000.00
4 __|Air and Condensate Main Pipe : '
a. Connect to Existing Air Line 2 EA $700.00] EA $1,400.00 $700.00 EA $1,400.00
b. Connect to Existing Condensate Main 2 LS $720.00} LS $1,440.00 $800.00 LS $1,600.00
c. 2"@ SDR 9 HDPE Compressed Air Pipe Trench 390 LF $19.00| LF $7,410.00 $25.00 LF $9,750.00
d. 3"@ SDR 11 HDPE Condensate Main Trench 270 LF $20.00] LF $5,400.00 $29.00 LF $7,830.00
e. 2"@ SDR 9 HDPE Compressed Air Pipe & 3"@ SDR 11
HDPE Condensate Main (in same trench) 350 LF $21.00] LF $7,350.00 $25.00 LF $8,750.00
f. Condensate Main Cleanouts 1 EA $550.00] EA $550.00 $700.00 EA $700.00
5 _ {Landfill Gas Conveyance Pipe
a. 4"@ SDR 17 HDPE Pipe Trench 70 LF $276.00] LF $19,320.00 $100.00 LF $7,000.00
b. 6"@ SDR 17 HDPE Pipe Trench 100 LF $27.40| LF $2,740.00 $100.00 LF $10,000.00
c. Dual Pipe Trench - 6" SDR 17 Solid HDPE Pipe & 4"@
Perforated Pipe (in Crushed Stone) 920 LF $54.00] LF $49,680.00 $75.00 LF $69,000.00
d. 12" SDR 17 HDPE Pipe Trench 660 LF $55.00] LF $36,300.00 $75.00 LF $49,500.00
e. Dual Pipe Trench - 12"% SDR 17 Solid HDPE Pipe &
4" Perforated Pipe (in Crushed Stone) 330 LF $76.00] LF | $25,080.00 $100.00] LF $33,000.00
f. 6"@ Access Riser (with end cap) 5 EA $700.00] EA $3,500.00 $1,500.00 EA $7,500.00
g. 12"@ Access Riser (with blind flange) 1 EA $1,450.00] EA $1,450.00 $6,000.00 EA $6,000.00
h. Connect to Existing 12"@ HDPE Pipe 1 EA $2,900.00] EA $2,900.00 $7,300.00 EA $7,300.00
6__|Perforated Pipe Collection Trenches (single pipe only) 920 LF $48.50| LF $44,620.00 $60.00 LF $55,200.00
7__|Draintube Surface Collection Layer 740 LF $49.00] LF $36,260.00 $49.00 LF $36,260.00
8 {Isolation Valve 1 EA $4,000.00} EA $4,000.00 $5,000.00 EA $5,000.00
9 |Condensate Trap 1 LS_| $11,000.00] LS $11,000.00 $17,000.00 LS $17,000.00
10 {Bentonite Seals 24 EA $2,360.00] EA $56,640.00 $2,000.00 EA $48,000.00
11_|Exposed Gcomembrane Emissions Control] Barrier 5 EA $5,430.00] EA $27,150.00 $5,000.00 EA $25,000.00
12 {Wellhead Assemblies 16 EA $827.00] EA $13,232.00 $1,000.00 EA $16,000.00
13_|Decommission Existing Well 1 EA $650.00| EA $650.00 $2,000.00 EA $2,000.00
14 {Survey 1 LS $8,572.00] LS $8,572.00 $10,000.00 LS $10,000.00
Total} $427,654.00 $530,290.00

Page 1 of 2

Page Image
Finance Committee - Agenda - 5/16/2018 - P293

Finance Committee - Agenda - 5/16/2018 - P294

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
294
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

Bid Tabulation
2019 Landfill Gas System Expansion
Four Hills Landfill

Nashua, New Hampshire

__EnviroTrac, Ltd.

Northeast Earth Mechanics

Item ae Quantity Bid Unit Cost Extended ; . . Extended
No. Descuption (w/ units) ($/units) Prices ($)_|) [Bid Umit Cost ($/units)| Caicos ($)
1__|Mobilization/Demobilization 1 LS _| $65,000.00] LS $65,000.00 $100,000.00 LS $100,000.00
2__|Vertical LFG Extraction Wells 140 VF $200.00| VF $28,000.00 $400.00 VF $56,000.00
3 Dewatering Pumps 4 EA $6,750.00] EA $27,000.00 $9,000.00 EA $36,000.00
4 __|Air and Condensate Main Pipe
a. Connect to Existing Air Line 2 EA $415.00| EA $830.00 $1,500.00 EA $3,000.00
b. Connect to Existing Condensate Main 2 LS $550.00} LS $1,100.00 $1,500.00 LS $3,000.00
c. 2"@ SDR 9 HDPE Compressed Air Pipe Trench 390 LF $14.00| LF $5,460.00 $10.00 LF $3,900.00
d. 3"@ SDR 11 HDPE Condensate Main Trench 270 LF $24.00] LF $6,480.00 $11.00 LF $2,970.00
e. 2"@ SDR 9 HDPE Compressed Air Pipe & 3"@ SDR 11
HDPE Condensate Main (in same trench) 350 LF $32.00| LF | $11,200.00 $15.00] LF $5,250.00
f. Condensate Main Cleanouts 1 EA $175.00] EA $175.00 $1,000.00 EA $1,000.00
5 _|Landfill Gas Conveyance Pipe
a. 4" SDR 17 HDPE Pipe Trench 70 LF $70.00] LF $4,900.00 $25.00 LF $1,750.00
b. 6"@ SDR 17 HDPE Pipe Trench 100 LF $55.00] LF $5,500.00 $25.00 LF $2,500.00
c. Dual Pipe Trench - 6"@ SDR 17 Solid HDPE Pipe & 4"@
Perforated Pipe (in Crushed Stone) 920 LF $100.00] LF $92,000.00 $45.00 LF $41,400.00
d. 12"@ SDR 17 HDPE Pipe Trench 660 LF $150.00| LF $99,000.00 $40.00 LF $26,400.00
e. Dual Pipe Trench - 12"@ SDR 17 Solid HDPE Pipe &
4"0 Perforated Pipe (in Crushed Stone) 330 LF $155.00] LF $51,150.00 $75.00 LF $24,750.00
f. 6"@ Access Riser (with end cap) 5 EA $1,250.00] EA $6,250.00 $1,500.00 EA $7,500.00
g. 12"@ Access Riser (with blind flange) 1 EA $660.00} EA $660.00 $2,000.00 EA $2,000.00
h. Connect to Existing 12"@ HDPE Pipe 1 EA $600.00| EA $600.00 $6,000.00 EA $6,000.00
6__|Perforated Pipe Collection Trenches (single pipe only) 920 LF $74.00| LF $68,080.00 $40.00 LF $36,800.00
7__|Draintube Surface Collection Layer 740 LF $36.00} LF $26,640.00 $35.00 LF $25,900.00
8 {Isolation Valve 1 EA $9,000.00] EA $9,000.00 $5,000.00 EA $5,000.00
9 |Condensate Trap il LS | $17,600.00] LS $17,600.00 $9,000.00 LS $9,000.00
10 |Bentonite Seals 24 EA $1,250.00} EA $30,000.00 $500.00 EA $12,000.00
11 {Exposed Geomembrane Emissions Control Barrier 5 EA $2,800.00] EA $14,000.00 $7,000.00 EA $35,000.00
12 |Wellhead Assemblies 16 EA $865.00] EA $13,840.00 $1,000.00 EA $16,000.00
13 _{Decommission Existing Well 1 EA $225.00} EA $225.00 $1,000.00 EA $1,000.00
14 [Survey 1 LS $9,000.00| LS $9,000.00 $25,000.00 LS $25,000.00
ZZ Total] $593,690.00 $489,120.00

1. All pipe lengths in the table above are plan view lengths (2D) and do not account for slope.

Page 2 of 2

Page Image
Finance Committee - Agenda - 5/16/2018 - P294

Finance Committee - Agenda - 5/16/2018 - P295

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
295
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

2)\ THE CITY OF NASHUA The Gate City’

Financtal Services

Purchasing Department

a: 7 Se a

May 10, 2018
Memo #18-124

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2018 CIPP LINING (VALUE: $715,658)
DEPARTMENT: 169 WASTEWATER; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated April 26, 2018
for information related to this purchase.

Pursuant to § 5-78 Major purchases (greater than $10,000) A. All supplies and contractual services,
except as otherwise provided herein, when the estimated cost thereof shall exceed $10,000 shall be
purchased by formal, written contract from the lowest responsible bidder, after due notice inviting bids.

The City Engineer, Board of Public Works and the Purchasing Department recommend the award of this
contract in the amount of $715,658 to Layne Inliner of Fairfield, ME.

Purchasing Manager

Cc: S Dookran L Fauteux

229 Main Street e Nashua, New Hampshire 03061 « Phone (603) 589-3330 e Fax (603) 589-3233

Page Image
Finance Committee - Agenda - 5/16/2018 - P295

Finance Committee - Agenda - 8/17/2022 - P234

By dnadmin on Sun, 11/06/2022 - 21:46
Document Date
Fri, 08/12/2022 - 13:02
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 08/17/2022 - 00:00
Page Number
234
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__081720…

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (608) 594-3233

August 10, 2022
Memo #23-318

TO: Mayor Donchess
Finance Committee

SUBJECT: Consulting services for Payroll in the amount not to exceed
$34,000 funded from 53142 Consulting Services/General Fund

Please see attached communications from Peter Donovan, Payroll Manager, dated August 5, 2022 for
project specific details related to this purchase. Below please find a summary of the purchase approval
request:

Item: Consulting Services for Lawson and Kronos
Value: $34,000
Vendor: Navisite LLC

Department: 112 Payroll
Source Fund: 53142 Consulting Services/ General Fund

Ordinance: Pursuant to § 5-84 Special purchase procedures. A/(5) Purchases from a sole
manufacturer, where it is determined to be more efficient and economical to reduce costs of maintenance
of additional repair parts, supplies or services.

Pursuant to NRO § 5-83 Professional Services (A) In the purchase of accounting, architectural, auditing,
engineering, legal, medical and ambulance services and purchases of independent professional
consultant services for personnel, data processing, actuarial, planning, management and other
comparable purchases competitive bidding shall not be required.

Administrative Services Division: Human Resources, Payroll and the Purchasing Department respectfully
request your approval of this contract.

Regards,

Amy Girard

Purchasing Manager

Ce: P Donovan
J Graziano
K Kleiner

Page Image
Finance Committee - Agenda - 8/17/2022 - P234

Finance Committee - Agenda - 5/16/2018 - P296

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
296
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

To:

From:

Re:

G. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: April 26, 2018

Stephen Dookran, P.E., City Engineer
Engineering Department

2018 CIPP Lining
Construction

To approve the construction contract for the 2018 CIPP Lining to Layne Inliner of
Fairfield, ME in the amount of $715,657.50. Funding will be through: Department: 169
Wastewater; Fund: Bond; Activity: Sewer Rehab.

The annual sewer program addresses failing, aged sewers and associated structures and
piping. This 2018 Cured in Place Pipe (CIPP) Lining project is expected to line
approximately 6,200 feet of sewer mains, of which about 5,700 are under roadway and
530 feet are off road. In general, the connecting drainage basins and drainage pipes will
be excavated and replaced under a separate contract. The locations of CIPP Lining
included in this contract are:

Kinsley St - Walnut St to Vine St and from Ritter St to Woodward St
Lake St from Pine St to 254 Lake St (near Caldwell Rd)

Gillis St from 4 Gillis St to Arlington Ave

Manchester St from 17 Manchester St to Hopkins St

Liberty Utilities yard area at 38 Bridge St

Five contractors attended the mandatory pre-bid meeting on March 28. Two bids were
received on April 17 as follows:

Insituform Technologies of Chesterfield, MO $748,705.00
Layne Inliner of Fairfield, ME $715,657.50

The low bid was reviewed and found to be acceptable. Although Layne Inliner has not
previously worked for the City, we have checked their references and found them to be
acceptable.

General coordination issues may impact the construction schedule. For example,
certain parts of the 2018 Sewer Replacement contract need to be done ahead of this
contract. Therefore, this contract may run into a second construction season.

Page Image
Finance Committee - Agenda - 5/16/2018 - P296

Finance Committee - Agenda - 5/16/2018 - P297

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
297
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the __ day of in the year 2018 by and between the City
of Nashua, New Hampshire (hereinafter called OWNER) and Layne Inliner, LLC and its successors,
transferees and assignees together (hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:

The scheduled work for the 2018 CIPP Lining Project consists of work on Kinsley St, Lake St,
Gillis St, Manchester St and 38 Gillis St (off road, in gas company’s yard area). Work includes
2,875 feet of 12 inch pipe CIPP lining, 1,620 feet of 15 inch pipe CIPP lining, 2,390 feet of 18”
pipe CIPP lining, 505 feet of short liner point repair in pipes varying from 8 inch to 24 inch
diameter, 375 vertical feet of manhole lining, and miscellaneous other items related to pipe lining
work.

ARTICLE 3 - ENGINEER
3.01 The Project has been designed by: Division of Public Works
ENGINEERing Department
9 Riverside Street
Nashua, NH 03062
who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and

responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.

AG - 1 0f 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P297

Finance Committee - Agenda - 5/16/2018 - P298

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
298
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

4.02 Dates for Substantial Completion

A. Project will begin once a written “Notice to Proceed” is issued.
B. Substantial Completion shall be 715 calendar days from the Notice to Proceed and
Final Completion shall be __90 calendar days from the Notice to Proceed,

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and
that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph
4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions.
The parties also recognize the delays, expense and difficulties involved in proving in a legal or arbitration
proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead
of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but
not as a penalty) CONTRACTOR shall pay OWNER ONE HUNDRED dollars ($100) for each calendar
day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is
substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse or fail to
complete the remaining Work within the time specified in paragraph 4.02 for completion and readiness for
final payment or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER
TWO HUNDRED dollars ($200) for each calendar day that expires after the time specified in paragraph
4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

B. In the event that the CONTRACTOR fails to pay OWNER the specified liquidated damages
amount within thirty (30) days of CONTRACTOR being notified of said damages, OWNER may deduct
the amount of the assessed liquidated damages from the final payment or retention withheld pursuant to
Article 14 of the General Conditions.

ARTICLE 5 - CONTRACT PRICE

5.01 Subject to additions and deductions by Change Order, the OWNER shall pay CONTRACTOR, in
accordance with the Contract Documents, the Contract Sum of:

SEVEN HUNDRED FIFTEEN THOUSAND SIX HUNDRED FIFTY-SEVEN AND 50/100 DOLLARS
($715,657.50)

The Contract Sum shall include all items and services necessary for the proper execution and completion of
the Work determined below:

A. for all Unit Price Work, an amount equal to the sum of the established Unit Price for each
separately identified item of Unit Price Work times the estimated quantity of that item, as indicated in the
attached Bid Schedule;

B. as provided in paragraph 11.03 of the General Conditions estimated quantities are not
guaranteed, and determinations of actual quantities and classification are to be made by ENGINEER as
provided in paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in
paragraph 11.03 of the General Conditions.

AG -2 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P298

Finance Committee - Agenda - 5/16/2018 - P299

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
299
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

ARTICLE 6 - PAYMENT PROCEDURES
6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the
General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General
Conditions.

B. Applications for Payment under this agreement shall be submitted as follows:
> Electronically via email to VendorAPInvoices@NashuaNH.gov
OR

> Paper Copies via US Mail to:

City of Nashua, City Hall
Accounts Payable
229 Main Street
Nashua, NH 03060

Please do not submit invoices both electronically and paper copy.

In addition, and to facilitate the proper and timely payment of applications, the OWNER requires that
all submitted invoices contain a valid PURCHASE ORDER NUMBER

6.02 Progress Payments; Retainage

A. — Progress Payments. The OWNER will once each month make a progress payment to the
CONTRACTOR on the basis of an estimate of the total amount of work done to the time of the estimate and
its value as prepared by the CONTRACTOR and approved by the ENGINEER. All such payments will be
measured by the schedule of values established in paragraph 2.07.A of the General Conditions (and in the
case of Unit Price Work based on the number of units completed) or, in the event there is no schedule of
values, as provided in the General Requirements.

B. Retainage. The OWNER will retain a portion of the progress payment, each month, in
accordance with the following procedures:

1. The OWNER will establish an escrow account in the bank of the OWNER’s
choosing. The account will be established such that interest on the principal will be
paid to the CONTRACTOR. The principal will be the accumulated retainage paid
into the account by the OWNER. The principal will be held by the bank, available
only to the OWNER, until termination of the contract.

2. Until the work is 50% complete, as determined by the ENGINEER, retainage shall

be 10% of the monthly payments claimed. The computed amount of retainage will be
deposited in the escrow account established above.

AG - 3 of 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P299

Finance Committee - Agenda - 5/16/2018 - P300

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
300
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

3. After the work is 50% complete, and provided the CONTRACTOR has satisfied the
ENGINEER in quality and timeliness of the work, and provided further that there is
no specific cause for withholding additional retainage no further amount will be

remainder of the project.
6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the
General Conditions, OWNER shall hold 2% retainage during the 1 (one) year warranty period and release it
only after the project has been accepted.

ARTICLE 7 - CONTRACTOR'S REPRESENTATIONS

7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other
related data identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to the
general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and
Regulations that may affect cost, progress, and performance of the Work.

D. CONTRACTOR has carefully studied all (if any): (1) reports of explorations and tests of
subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which
have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions and (2) reports and drawings of Hazardous Environmental Condition, if any, at the Site which has
been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.

E. CONTRACTOR is entitled to rely upon the general accuracy of the “technical data” as
provided in paragraph 4.2 of the General Conditions. CONTRACTOR acknowledges that such reports and
drawings are not Contract Documents and may not be complete for CONTRACTOR's purposes.
CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for the
accuracy or completeness of information and data shown or indicated in the Contract Documents with
respect to Underground Facilities at or contiguous to the site.

F, CONTRACTOR has obtained and carefully studied (or assumes responsibility for having
done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data
concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which
may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods,
techniques, sequences and procedures of construction, if any, expressly required by the Contract Documents
to be employed by CONTRACTOR, and safety precautions and programs incident thereto.

AG - 4 0f 8

Page Image
Finance Committee - Agenda - 5/16/2018 - P300

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 2742
  • Page 2743
  • Page 2744
  • Page 2745
  • Current page 2746
  • Page 2747
  • Page 2748
  • Page 2749
  • Page 2750
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact