Finance Committee - Agenda - 5/16/2018 - P297

By dnadmin on Mon, 11/07/2022 - 11:42
Document Date
Wed, 05/16/2018 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/16/2018 - 00:00
Page Number
297
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051620…

STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR

THIS AGREEMENT is dated as of the __ day of in the year 2018 by and between the City
of Nashua, New Hampshire (hereinafter called OWNER) and Layne Inliner, LLC and its successors,
transferees and assignees together (hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:

ARTICLE 1 - WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents.
ARTICLE 2 - THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:

The scheduled work for the 2018 CIPP Lining Project consists of work on Kinsley St, Lake St,
Gillis St, Manchester St and 38 Gillis St (off road, in gas company’s yard area). Work includes
2,875 feet of 12 inch pipe CIPP lining, 1,620 feet of 15 inch pipe CIPP lining, 2,390 feet of 18”
pipe CIPP lining, 505 feet of short liner point repair in pipes varying from 8 inch to 24 inch
diameter, 375 vertical feet of manhole lining, and miscellaneous other items related to pipe lining
work.

ARTICLE 3 - ENGINEER
3.01 The Project has been designed by: Division of Public Works
ENGINEERing Department
9 Riverside Street
Nashua, NH 03062
who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and

responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in
connection with completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES
4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness
for final payment as stated in the Contract Documents are of the essence of the Contract.