Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Search

Search

Displaying 381 - 390 of 38765

Finance Committee - Agenda - 2/16/2022 - P7

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
7
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Prime Contract Change Order (CO)

Project Information Prime Contract Change Order

Project # 21-004 NPD CcoO# 002

Title Nashua Police Department HVAC Issue Date 21-Oclober-2021
Address 28 Officer James Roche Drive Subject Shaft Fire Dampers
City, State, Zip Nashua, NH 03062

Country

Contact Contact Tony DaCosla
Company City of Nashua Company Turnstone Corporation
Address 229 Main Street Address 479 Nashua Street
City, State, Zip Nashua, NH 03060 City, State, Zip Milford, NH 03055
Country Country

Phone Phone (603) 249-9300
Fax Fax (693) 673-6138

You are directed to make the following changes to this Contract:

J.Lawrence Hall: $1,403.00
GUBR Insurance(.89%) :$12.48
Bond Cost (1%): $14.03

CM Fee (15%): $210.45

Please note that JLH has had the original fire dampers for over 5 weeks and cannot use them due to being the incorrect size. The total has also
increased since we have two dampers per Noor (total of 8) versus the original amount {total of 4). The cost only includes the installation of two
dampers as the other four are covered under contract scope.

AlLother terns and condilions of {ha Contract Documents shall remain in effect.

Original Contract Price $3,601,767.00
Net change by previous Change Orders $2,317.92
Contract Amount Prior to this Change $3,604,084,.92
Amount of this Change Order $1,639.96
Revised Contract Amount, including this Change Order $3,605,724,88
Response:L_] Accept oO Do Not Accept

Gity of Nashua

Company Age
By Date a |
Yeaton Associates WELT.

Company

Page tof?

Page Image
Finance Committee - Agenda - 2/16/2022 - P7

Finance Committee - Agenda - 2/16/2022 - P8

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
8
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

J. LAWRENCE J, Lawrence Hallo. Inc. pp 603-882-2021
f | Al | i7 Progress Avenue f 603-882-1287
Nashua, NH 03062 w www. jlawrencehall.com

October 7, 2021

Turnstone Corporation

479 Nashua St.

Milford, NH 03055

Alin: Tony Dacosta

Subject: Nashua Police Department HVAC Upgrade
Re: RFI #4 Shaft Fire Dampers

We are pleased to provide the following quote to furnish and install fire dampers in the supply and exhaust
ducts leaving storage rooms 022, 132 and 244 {six total).

Total Price: $1,403.00

If there any questions regarding this quote, please do not hesitate to call.

Sincerely,
i? ee
Mth cf;

Robert Hansen
Sales Engineer

Engineered Alr Conditioning & Energy Control Systems

Page Image
Finance Committee - Agenda - 2/16/2022 - P8

Finance Committee - Agenda - 2/16/2022 - P9

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
9
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Project Information

Prime Contract Change Order (CO)

Prime Contract Change Order
003

Project # 21-004 NPD cO#

Title Nashua Police Department HVAC issue Date 10-January-2022

Address 28 Officer James Roche Drive Subject Additional Work — Tile & Gnd

City, State, Zip Nashua, NH 03082

Country

Contact Contact Tony DaCosta

Company City of Nashua Company Turmstone Corporation

Address 229 Main Street Address 479 Nashua Street

City, State, Zip Nashua, NH 03060 City, State, Zip Milford, NH 03055

Country Country

Phone Phone (603) 249-9300

Fax Fax (603) 673-6138

You are directed to make the following changes to this Contract:

Granite State Acoustics: $4,775.00

GUBR Insurance{.89%}) :$42.50

Bond Cost (1%): $47.75

CM Fee (15%): $716.25

All other tenms and conditions of the Contract Documents shall remain in effect

Original Contract Price $3,601,767.00
Net change by previous Change Orders $3,957.88
Contract Amount Prior to this Change $3,605,724.88
Amount of this Change Order $5,581.50
Revised Contract Amount, including this Change Order $3,611,306.38
Response:L] Accept 0 Do Not Accept

City of Nashua Tumstone Corporation

Company Company

By Date By Cate

Yeaton Associates

Company

By Date

Page Tt of 7

Page Image
Finance Committee - Agenda - 2/16/2022 - P9

Finance Committee - Agenda - 2/16/2022 - P10

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
10
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Hi Jim,
Please see the following prices.
NPD-Additional grid and tile

pRoome Proposed price _|
[Conf Room 25 __| 770 tile only § 695.00
Admin. 251 New 2x2 grid/770 tile $ 2,000.00
Storage #251A New 2x2 grid S 270.00
Records #249 New 2x2 grid S 470.00
Waiting #266-NIC | New 2'x4' grid/1714 tile S 910.00
Corridor #270 New 2'x4' grid S 495.00
Office #267B New 2'x4' grid S 440.00
Lieutenant #260 New 2'x4' grid S 465.00
Det. #253 New 2'x4' grid $ 460.00
Interview #264 New 2'x4' grid S 550.00
Corridor New 2'x4' grid $ 430.00
If you need something in a proposal form please let me know.
Thank you. tf bas + 4uqcEeTiorn
Jenn Y
P
Jennifer Wyman, President @ 4 4, 080 WEEDS TO BE Dorks

DPD He Avo MeKE-vUP Cw)

8 Chestnut Drive Bedford, NH 03110 —
O (603)668-0150

From: Jim Delisle <jdelisle@turnstonecorp.com>
Sent: Wednesday, December 15, 2021 11:19 AM
To: Jennifer <jennifer@granitestateacoustics.cam>
Subject: FW: NPD - Additional Grid and Tile

Hi Jen,

Any update on additional pricing for NPD? We have our weekly meeting tomorrow and was hoping to present the cost
to them.

Thanks,

Jim Delisle

General Superintendent

Page Image
Finance Committee - Agenda - 2/16/2022 - P10

Finance Committee - Agenda - 2/16/2022 - P11

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
11
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Project Infonnation

Prime Contract Change Order
004

Prime Contract Change Order (CO)

Project # 21-004 NPD co#

Title Nashua Police Department HVAC Issue Date 21-January-2022
Address 28 Officer James Roche Drive Subject Firing Ranga Lighting
City, State, Zip Nashua, NH 03062

Country ;
Contact Contact Tony DaCosta
Company City of Nashua Company Turnstone Corporation
Address 229 Main Street Address 479 Nashua Street
City, State, Zip Nashua, NH 03060 City, State, Zip Mitford, NH 03055.
Country Country

Phone Phone (603) 249-9300

Fax Fax (603) 673-6138

You are directed to make the following changes to this Contract:

Gate City Electric: $940.00
GUBR Insurance(.89%) :$8.36
Bond Cost (1%): $9.40

CM Fee (15%): $141.00

All other tens and conditions of tha Contract Documents shall remain in effect.

Orginal Contract Price

Net change by previous Change Orders

Contract Amount Prior to this Change

Amount of this Change Order

Revised Contract Amount, Including this Change Order

33,661, 767.00
$9,539.38
$3,61 1,306.38
$1,098.76
$3,612,405,14

Response:L] Accept oO Do Not Accept

City of Nashua
Company

By Date

Yeaton Associates
Company

By Dale

Page 1 off

Page Image
Finance Committee - Agenda - 2/16/2022 - P11

Finance Committee - Agenda - 2/16/2022 - P12

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
12
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Cte an

Cel(Lce Ce TT TRS Ce

31 Will Street - PO BOX 3554 —- NASHUA, N.H. 03060

PH (603)886-0200 / FAX 886-0025 / EMAIL — www.gatecityelectric.com

DATE:

PROPOSAL

1/12/2022

PROJECT: Nashua Police Station ~ Firing Range Lighting

SUBMIT TO: Turnstone Construction Co. — Jim Delisle

TEL. 603-769-7496
Email jdelisle@turnstonecorp.com

1.

Replace two existing double flood lights in front with one 4ft and one 8ft LED strip
light to increase lighting levels and lighting quality. Prep lights for future dimming

1 — Columbia #CSL4-LSCS LED 4FT LIGHT $110.00
1 — Columbia #CSL8-LSCS LED 8FT LIGHT $155.00
70’ - 18/2 shielded dimming cable back to console $30.00
1 — misc boxes, wire, connectors etc $50.00
7 —hours labor $85.00/hour = $595.00

aa
Project cost $940.00 — /o¢ Lust oud

Replace two existing double head flood lights in six rows with one 4ft and one
8ft LED strip light to increase lighting levels and lighting quality. Replace 3
existing dimmers with new 0-10volt LED dimmers and run new 18/2 shielded
cable from each fixture to new dimmers. dimming scheme shall remain as is

6 ~ Columbia #CSL4-LSCS LED 4FT LIGHTS $110.00ea = $660.00
6 — Columbia #CSL8-LSCS LED 8FTLIGHTS $155.00ea = $930.00
250’- 18/2 shielded cable $.43/ft = $108.00
3— LED dimmer switches — Lutron#DVSTV $90.00ea = $270.00
1— misc pipe, wire, boxes, etc = $300.00
42 — hours labor $85.00/hr = $3,570.00
Project Cost $5,838.00

—_—_—_———s

OO

cont'd on page 2

a

Page Image
Finance Committee - Agenda - 2/16/2022 - P12

Finance Committee - Agenda - 2/16/2022 - P13

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
13
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

page 2 — NPD firing range lighting upgrade

3. Replace four 4FT existing fluorescent wraparound lights over work bench with
new 4FT LED fixtures — Aleo Brand Cat #LLS4 UXH 40/8 CTG4

$400.00

4-4FT LED LIGHTS $100.00ea
$510.00

6 - hours labor $85.00/hr

Project Cost $910.00

4. Install four new 4FT LED lights approx.. 10ft from work bench lights to light up
step down in floor area. — same brand as above

4—-—4FT LED LIGHTS $100.00ea = $400.00
1 —misc wire, boxes, connectors, ete = $50.00
$85.00/nr = $510.00

6 - hours labor
Project Cost $960.00

TOTAL PROJECT COSY)’ $8,648.00

Guy Lavoie / Vice President

Page Image
Finance Committee - Agenda - 2/16/2022 - P13

Finance Committee - Agenda - 2/16/2022 - P14

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
14
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

Col um bia DATE: | LOCATION:

LIGHTING TYPE: | PROJECT:

Cc S L CATALOG #:

STRIPLIGHT tradeSELECT’
FEATURES

« 4 and 8ft lengths

+ Switchable CCT, 3500/4000/5000K
» Wide range of applications

« 80+ CRI

+ 0-10V dimming

+ Surface mount on wall or ceiling

« Universal voltage (120-277V)

+ Switchable Lumen Technology

SPECIFICATIONS
OPTICS CERTIFICATIONS WARRANTY
+ Frosted acrylic lens + Allluminaires are built to UL1598 standards + 5 year warranty
INSTALLATION and bear appropriate ETL labels + See HL! Standard Warranty for
+ Fully assembled for quick installation « Damp location label standard additional information

+ DLC® (DesignLights Consortium) Qualified.
a . ares 7 LEDs at L70 for reduced Please refer to the OLC website for specific

product qualifications at www.designlights.org

maintenance

ORDERING GUIDE

Catalog Ne. UPC Description Setting Lumens Watts my
3500K ABOGK 500K Ei-16]6) Ques 101010) STOLELO) 4
LOW 4050 4274 4072 30 135 142 136
4’ LED Stripfight, 3800/4500/5200 Switchable Lumens,
Oo CSL4-LSCS 840141403625 3500/4000/5000K Switchable CCT, O-10V dimming MED: 4876 5191 4872 38 128 137 128
HIGH 5402 5770 5405 45 120 128 120
Low 7387 Tit 7404 60 123 130 123
8' LED Striplight, 7400/8400/9200 Switchable Lumens,
OJ) cstetscs 840141403632 3500/4000/S000K Switchable CCT, O40V dimming MED 9283 8664 8257 72 WS 120 is
HIGH S319 9959 9361 80 16 124 17
r = ee
eee ae (OrderSeparatetyy |
[I 6LH5 5 adjustable cable for suspension mount
7}
KEY DATA
Lumen Range 4050-9959
Wattage Range 30-80
Efficacy Range (LPW) 15-142
Reported Life (Hours) L70/54,000

.
Page 1/2 Rev. Oa/07/21 © 2021 Columbia Lighting, a division of Hubbell Lighting. Inc, Specifications subject to change without notice HUBBELL
COL-CSL-spec 701 Millennium Blvd « Greenville, SC 29607 / Tel 864.678.1000 / Website wew.columblalighting.com Lighting

LS]
as
g
fs}
=
pi
z

SONIMVEC TYNOISNJAID @ = £33HS 1138 &

Page Image
Finance Committee - Agenda - 2/16/2022 - P14

Finance Committee - Agenda - 2/16/2022 - P15

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
15
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

\
Columbia

DATE: | LOCATION:
LIGHTING TYPE: | PROJECT: ee
CSL CATALOG #: a
STRIPLIGHT
DIMENSIONS
La
[rezk ACO) rer]
[ ] -
[ J
[od * Eo ? +06) . woe of Tor]
[ 1 _
{ J
PHOTOMETRY
CSL4-LSCS 4000K 38W
LUMINAIRE DATA ZONAL LUMEN SUMMARY POLAR GRAPH
180__-185 150 135
Test No. EWA-STO48LSCS38W,4000K) Zone Lumens % Luminaire 1400
Description tradeSELECT® CSL, Steiplight 0-30 1069 20.5
Dellvered Lumens 5204 0-40 1770 34.0
Watts 37.4 0-60 3241 623 +20
Efficacy 139 0-90 4662 89.6 00
Spacing Criterion 0°+1.32 90°=126 0-180 5204 100.0
105
so
1S
ree
oo
1400
a 48 30 45
Hertz 0-186
0.0 45.0 ou

Page 2/2 Rew, O4/O7/21
COL-CSL-spec

© 2021 Columbia Lighting, a drvision of Hubbell Lighting, Inc, Specticatiens subject to change wnlhout notice
701 Millennium Blvd « Greenville, SC 29607 / Tel 864.678.1000 / Web igh

WAAC

g.com

Lighting

“HUBBELL

®
2
5
4
oO
=
z
=<

Sil 8

ddd §

Page Image
Finance Committee - Agenda - 2/16/2022 - P15

Finance Committee - Agenda - 2/16/2022 - P16

By dnadmin on Sun, 11/06/2022 - 21:40
Document Date
Thu, 02/10/2022 - 15:14
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 02/16/2022 - 00:00
Page Number
16
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__021620…

1of6

aleo

LED LIGHTING

Date

Cat No.

LLS™ UX Series LED Linear Strip Luminaire Field Adjustable

DESCRIPTION

The Aleo LLS™ UX Series Field Adjustable Linear Strip Luminaire delivers industry-leading
performance with deep energy savings and continuous dimming. Low profile design offers easy
handling and storage. This versatile juminaire produces energy-efficient, comfortable illumination

for a myriad of applications.
APPLICATIONS

Excellent for general utility applications: Parking garage, warehouse, offices, restrooms, storage

uniis, stairwell.

Specification Features

ccT

OME

— ELD
ADASTAS E

LLS Senes

4 25W / 34W / 40oW

a } @’ SSW / GOW / GSW
oe cel Jus Flee) 6) (07
USTED

Construction

Integral LED gear tray and reflector with driver on board
allows for easy instaflation and handling. Luminaire features
matte white durable finish. Diffuser requires no additional
frame or fastener for easy installation.

Optical System

Reflector systems features highly reflective coating and
delivers balanced, comfortable luminance tor productive
spaces. Diffuser lens reduces glare and improves occupant
comfort while maintaining high efficiency emission.

Certification

UL Listed. All components have UL certification. UL Class
2. Driver: SCP, OTP, OVP protection, FCC Part 15 Class B,
UL8750 Class 2. DLG Premium

Warranty
7-year Limited Warranty. See warranty documentation for
more information.

Electrical

Luminaire utilizes high-efficacy LED packages maintained
at coo! temperatures for long life, high efficacy. Reliable
driver features continuous dimming. Universal voltage
(120-277) for convenient installation. Comes equipped
with juminaire quick-disconnect.

Installation / Mounting
Luminaire back housing includes hotes and slots for
various mounting methads.

Controls / Dimming

Continuous dimming {0-10V) comes standard. Suitable for
use with dimmers, sensors, daylight harvesting and other
control strategies to achieve deeper energy-savings and
code compliance. Sensor accessory available: occupancy
sensing with daylight cut-off.

Field-Adjustable CCT / Wattage

Increased versatility and reduced inventory burden.
Wattage and Color Temp. Can be adjusted in the field by
selecting (3) different wattages and (3) different CCTs via
switch on driver box

Rated Life 75,000 hours
Limited Warranty ?-years
Efficacy Up to 130 LPW

Continuous Dimming

Ry, contnucLE
( ‘DIMMING
is

Quick Ship

LLS-=-UXH~40/8CT G4
LLS-8-UXH-654CT G4

Ordering Information

Example: LLS-4-UXH-40/6CT G4

Series Form Factor | Lumen Package
et _i|4 a UXH_ Field Adjustable
LED Linear Strip 8 ¢

Luminaire - Field

Adjustable

Emergency Backup
EM700 700im
EM1400 1400Im
EM2000 2000Im

Nominal Max Wattage |CRI Color Temp

FU 8 83+ | CT Field Adjust.
40 25W /34W OW 3500K

Fy 4000K

65 55W/60W / 65W ‘ fps.

* Utilize 3-way switch to select Switch to select

Controls
os Occupancy Sensor
OSDL Occ. Sensor wi Daylight

OSDLAR Mulhi-Level Occ. Sensor w/ wireless config.
OSDLBT Wireless Bluetooth Occupancy Sensor

* Will be supplied with side fixture-mount sensor, unless SB is specifind
* Gontact factory for other control options and wireless capabilities

Input Voltage | Dimming

Blank Blank

{20V-277V 0-10V
Continuous
Dimming

SB Integrated Sensor Box

Specifications and Dimensions subject to change without notice.
Aleo Lighting, Inc. | www.aleolighting.com | Ph: 877-358-8625

Form LLS-UXH G4-SS / Rev, 04

© 2021 Aleo Lighting, Inc. All rights reserved.

Page Image
Finance Committee - Agenda - 2/16/2022 - P16

Pagination

  • First page « First
  • Previous page ‹‹
  • …
  • Page 35
  • Page 36
  • Page 37
  • Page 38
  • Current page 39
  • Page 40
  • Page 41
  • Page 42
  • Page 43
  • …
  • Next page ››
  • Last page Last »

Search

Meeting Date
Document Date

Footer menu

  • Contact